Claim 1
Independent Claim
110 words
In a thermal power plant of the type which produces compressed air by use of excess energy generated during off-peak load periods and which is accumulated in a storage tank, the stored compressed air being withdrawn from said tank and delivered to a hot-air turbine through a compressed air line extending from said storage tank to said hot-air turbine during peak load periods for generation of additional energy, the improvement comprising: a heat exchanger included in said compressed air line; a steam turbine for producing bleeder steam; and, means for supplying said bleeder steam to said heat exchanger for heating said compressed air prior to delivery to said hot-air turbine.
Claim 2
Dependent Claim
110 words
In a thermal power plant of the type which produces compressed air by use of excess energy generated during off-peak load periods and which is accumulated in a storage tank, the stored compressed air being withdrawn from said tank and delivered to a hot-air turbine through a compressed air line extending from said storage tank to said hot-air turbine during peak load periods for generation of additional energy, the improvement comprising: a heat exchanger included in said compressed air line; a steam turbine for producing bleeder steam; and, means for supplying said bleeder steam to said heat exchanger for heating said compressed air prior to delivery to said hot-air turbine.
Claim 3
Dependent Claim
38 words
A thermal power plant as defined in claim 1 wherein the bleeder steam supplied to said heat exchanger for heating said compressed air prior to delivery to said hot air turbine is accumulated in a steam storage tank.
Claim 4
Dependent Claim
38 words
A thermal power plant as defined in claim 1 wherein the bleeder steam supplied to said heat exchanger for heating said compressed air prior to delivery to said hot air turbine is accumulated in a hot-water storage tank.
Claim 5
Dependent Claim
115 words
A thermal power plant, comprising: compressor means for producing compressed air by use of excess energy generated during off-peak load periods; first storage means for accumlating said compressed air; hot-air turbine means for generating energy during peak load periods; a compressed air line extending from said storage means to said hot-air turbine means; steam generation means for producing steam during said off-peak load periods; second storage means for accumulating said steam produced by said steam generation means; heat exchanger means included in said compressed air line for heating said compressed air prior to delivery to said hot-air turbine means; and means for conducting said steam from said steam storage means to said heat exchange means.
Claim 6
Dependent Claim
115 words
A thermal power plant, comprising: compressor means for producing compressed air by use of excess energy generated during off-peak load periods; first storage means for accumlating said compressed air; hot-air turbine means for generating energy during peak load periods; a compressed air line extending from said storage means to said hot-air turbine means; steam generation means for producing steam during said off-peak load periods; second storage means for accumulating said steam produced by said steam generation means; heat exchanger means included in said compressed air line for heating said compressed air prior to delivery to said hot-air turbine means; and means for conducting said steam from said steam storage means to said heat exchange means.
Claim 7
Dependent Claim
17 words
The thermal power plant of claim 4 wherein the second storage means comprises a steam storage tank.
Claim 8
Dependent Claim
18 words
The thermal power plant of claim 4 wherein the second storage means comprises a hot water storage tank.
Claim 9
Dependent Claim
16 words
The thermal power plant of claim 4 wherein the steam generation means includes an electric heater.
Claim 10
Dependent Claim
20 words
The thermal power plant of claim 4 wherein the steam generation means includes a steam turbine which produces bleeder steam.
Claim 11
Independent Claim
117 words
A method of generating energy from compressed gas during off-peak load periods by means of a hot-air turbine, comprising the steps of: compressing a quantity of air during said off-peak load periods; removing heat from said compressed air so as to cool said compressed air; accumulating said cooled, compressed air in a storage tank during said off-peak load periods; generating steam during said off-peak load periods; storing said steam in a storage tank; conducting said cooled compressed air from said storage tank to a hot air turbine through a heat exchanger during said peak load periods; and conducting steam from said storage tank to said heat exchanger to heat said compressed air during said peak load periods.
Claim 12
Independent Claim
117 words
A method of generating energy from compressed gas during off-peak load periods by means of a hot-air turbine, comprising the steps of: compressing a quantity of air during said off-peak load periods; removing heat from said compressed air so as to cool said compressed air; accumulating said cooled, compressed air in a storage tank during said off-peak load periods; generating steam during said off-peak load periods; storing said steam in a storage tank; conducting said cooled compressed air from said storage tank to a hot air turbine through a heat exchanger during said peak load periods; and conducting steam from said storage tank to said heat exchanger to heat said compressed air during said peak load periods.
Claim 13
Independent Claim
126 words
A method of generating energy during off-peak load periods from compressed air by means of a hot air turbine, comprising the steps of: compressing a quantity of air in a compressor during said off-peak load periods; removing heat from said compressed air so as to cool said compressed air; accumulating said cooled, compressed air in a storage tank during said off-peak load periods; conducting said cooled compressed air from said storage tank to said hot-air turbine through a heat exchanger during said peak load periods to generate energy in said hot-air turbine; generating bleeder steam in a steam turbine; and, conducting said bleeder steam to said heat exchanger to heat said compressed air during said peak load periods prior to delivery to said hot air turbine.
Claim 14
Independent Claim
126 words
A method of generating energy during off-peak load periods from compressed air by means of a hot air turbine, comprising the steps of: compressing a quantity of air in a compressor during said off-peak load periods; removing heat from said compressed air so as to cool said compressed air; accumulating said cooled, compressed air in a storage tank during said off-peak load periods; conducting said cooled compressed air from said storage tank to said hot-air turbine through a heat exchanger during said peak load periods to generate energy in said hot-air turbine; generating bleeder steam in a steam turbine; and, conducting said bleeder steam to said heat exchanger to heat said compressed air during said peak load periods prior to delivery to said hot air turbine.
Claim 15
Dependent Claim
18 words
The method of claim 10 further comprising the step of: accumulating said bleeder steam in a storage tank.
Claim 16
Dependent Claim
24 words
The method of claim 10 further comprising the step of: accumulating said bleeder steam in a storage tank solely during said off-peak load periods.
Claim 17
Dependent Claim
22 words
The method of claim 11 further comprising the step of: driving said compressor by said steam turbine during said off-peak load periods.