Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
197 words
A method comprising: injecting a preflush fluid through at least one injection well into an underground formation in an oil field having a plurality of wells around said injection well, which oil field has been subjected to a water flood recovery operation; producing formation fluid from at least one production well spaced apart from said injection well by at least one shut in well located between said at least one injection well and said at least one production well; thereafter injecting a chemical fluid through said at least one injection well; thereafter injecting drive fluid through said at least one injection well; keeping said at least one shut in well shut in until said preflush fluid reaches said at least one shut in well; thereafter opening said at least one shut in well and recovering oil therefrom; and after oil between said at least one injection well and said thus opened at least one shut in well has been essentially depleted, converting said thus opened well to a new preflush injection well, shutting in said at least one injection well and repeating the above steps at wells spaced further apart from said at least one injection well.
Claim 2
Independent Claim
197 words
A method comprising: injecting a preflush fluid through at least one injection well into an underground formation in an oil field having a plurality of wells around said injection well, which oil field has been subjected to a water flood recovery operation; producing formation fluid from at least one production well spaced apart from said injection well by at least one shut in well located between said at least one injection well and said at least one production well; thereafter injecting a chemical fluid through said at least one injection well; thereafter injecting drive fluid through said at least one injection well; keeping said at least one shut in well shut in until said preflush fluid reaches said at least one shut in well; thereafter opening said at least one shut in well and recovering oil therefrom; and after oil between said at least one injection well and said thus opened at least one shut in well has been essentially depleted, converting said thus opened well to a new preflush injection well, shutting in said at least one injection well and repeating the above steps at wells spaced further apart from said at least one injection well.
Claim 3
Dependent Claim
21 words
A method according to claim 1 wherein said preflush fluid is water containing 10,000 to 20,000 parts per million sodium chloride.
Claim 4
Dependent Claim
24 words
A method according to claim 2 wherein said preflush fluid is introduced in an amount within the range of 0.3 to 0.5 pore volumes.
Claim 5
Dependent Claim
16 words
A method according to claim 3 wherein said chemical fluid is a surfactant system or microemulsion.
Claim 6
Dependent Claim
32 words
A method according to claim 4 wherein said surfactant system is made up of a petroleum sulfonate, a cosurfactant, and a brine solution containing 2,000 to 50,000 parts per million sodium chloride.
Claim 7
Dependent Claim
34 words
A method according to claim 1 wherein said preflush fluid is water containing 10,000 to 20,000 parts per million sodium chloride introduced in an amount within the range of 0.3 to 0.5 pore volume.
Claim 8
Dependent Claim
43 words
A method according to claim 1 wherein said at least one first injection well comprises a line of injection wells and said at least one shut in well comprises a line of wells on each side of said line of first injection wells.
Claim 9
Dependent Claim
30 words
A method according to claim 1 wherein said at least one shut in well comprises a plurality of shut in wells in an annular configuration around said first injection well.
Claim 10
Dependent Claim
32 words
A method according to claim 1 wherein said formation fluid contains greater than 50,000 parts per million total dissolved solids and said preflush contains 10,000 to 20,000 parts per million sodium chloride.
Claim 11
Dependent Claim
20 words
A method according to claim 1 wherein a mobility buffer is introduced between said chemical fluid and said drive fluid.