Patent US4082358A successfully refreshed from Google Patents.
US4082358A
Expired / Lapsed
US
⏱️ 0.0 years remaining
In situ solution mining technique
Assignee: United States Steel Corp
•
Filing: 1976-02-02
•
Granted: 1978-04-04
•
Expires: 1996-02-02
Abstract
Abstract A method of in situ solution mining is disclosed in which a primary leaching process employing an array of 5-spot leaching patterns of production and injection wells is converted to a different pattern by converting to injection wells all the production wells in alternate rows.
Inventors
- 👤 Robert P. Learmont
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-23 18:17
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/28; E21B43/16; E21B43/18; E21B43/30
Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
56 words
Method of establishing a secondary production pattern for in situ leaching of mineral values from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells, comprising converting all the production wells in alternate rows diagonal to the original pattern to injection wells.
Claim 2
Dependent Claim
56 words
Method of establishing a secondary production pattern for in situ leaching of mineral values from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells, comprising converting all the production wells in alternate rows diagonal to the original pattern to injection wells.
Claim 3
Dependent Claim
19 words
Method of claim 1 including the step of shutting down all the injection wells of the primary leaching process.
Claim 4
Dependent Claim
62 words
Method of in situ leaching of mineral values to exhaustion from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells, comprising converting all the production wells in alternate rows diagonal to the original pattern to injection wells, and injecting a leaching solution through the new injection wells.
Claim 5
Dependent Claim
62 words
Method of in situ leaching of mineral values to exhaustion from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells, comprising converting all the production wells in alternate rows diagonal to the original pattern to injection wells, and injecting a leaching solution through the new injection wells.
Claim 6
Dependent Claim
19 words
Mehtod of claim 3 including the step of shutting down all the injection wells of the primary leaching process.
Claim 7
Dependent Claim
64 words
Method of establishing a secondary production pattern for in situ leaching of mineral values from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells, comprising closing all of the injection wells of the primary leaching process and converting production wells to injection wells in a contiguous hexagonal leaching pattern.
Claim 8
Dependent Claim
64 words
Method of establishing a secondary production pattern for in situ leaching of mineral values from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells, comprising closing all of the injection wells of the primary leaching process and converting production wells to injection wells in a contiguous hexagonal leaching pattern.
Claim 9
Dependent Claim
77 words
Method of establishing a secondary production pattern for in situ leaching of U 3 O 8 values from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells until the U 3 O 8 recovery is at a rate about 50% of the initial recovery rate, comprising converting all the production wells in alternate rows diagonal to the original pattern to injection wells.
Claim 10
Dependent Claim
77 words
Method of establishing a secondary production pattern for in situ leaching of U 3 O 8 values from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells until the U 3 O 8 recovery is at a rate about 50% of the initial recovery rate, comprising converting all the production wells in alternate rows diagonal to the original pattern to injection wells.
Claim 11
Dependent Claim
83 words
Method of in situ leaching of U 3 O 8 values to exhaustion from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells until the U 3 O 8 recovery is at a rate about 50% of the initial recovery rate, comprising converting all the production wells in alternate rows diagonal to the original pattern to injection wells, and injecting a leaching solution through the new injection wells.
Claim 12
Dependent Claim
83 words
Method of in situ leaching of U 3 O 8 values to exhaustion from a formation wherein a primary leaching process has been conducted through an array of contiguous 5-spot leaching patterns of production wells and injection wells until the U 3 O 8 recovery is at a rate about 50% of the initial recovery rate, comprising converting all the production wells in alternate rows diagonal to the original pattern to injection wells, and injecting a leaching solution through the new injection wells.
References Cited (Backward Citations)
US3309140A
Cited
US3380525A
Cited
US3860289A
Cited
US3805892A
Cited
US3903966A
Cited
US3872922A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1981-04-03 | 1981-10-03 | 1982-04-04 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1985-04-03 | 1985-10-03 | 1986-04-04 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1989-04-03 | 1989-10-03 | 1990-04-04 | $7700.00 | Window Closed / Lapsed |