US4077836A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Apparatus for automatically starting up nuclear reactor
Assignee: Hitachi Ltd
•
Filing: 1975-09-15
•
Granted: 1978-03-07
•
Expires: 1995-09-15
Abstract
Abstract An apparatus for automatically starting up a nuclear reactor, which causes control rods in the reactor to be withdrawn in the predetermined order according to the signal obtained by adding the heat-up ratio as a compenstory component determined by the reactor pressure to the deviation of the heat-up ratio of the reactor temperature from the predetermined heat-up ratio and which causes the reactor to be subjected to heat-up and pressurization by opening turbine bypass valves when the heat-up ratio exceeds a reference value.
Inventors
- 👤 Takashi Omori
- 👤 Sakae Sugiyama
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 21:51
CPC Classifications
G; G21; G21C; G21C7/00; G21C7/36; Y; Y02; Y02E; Y02E30/00; Y02E30/30
Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
179 words
An apparatus for automatically starting up a nuclear reactor during a heat-up and pressurization phase of start-up, comprising a plurality of control rods disposed in a reactor core, a control rod driving means for inserting and withdrawing said control rods into and out of said reactor core, temperature detecting means for detecting reactor temperature, heat-up ratio calculator means for calculating a rate of change in the output of said temperature detector means, heat-up ratio reference means for providing a predetermined heat-up ratio value of said reactor temperature, said control rod driving means manipulating said control rods in accordance with the deviation of the output of said heat-up ratio calculator means from the output of said heat-up ratio reference means so as to maintain the heat-up ratio of said reactor temperature at the predetermined value, and heat-up ratio compensation means for correcting said heat-up ratio of said reactor temperature in accordance with at least one condition in said reactor for maintaining said heat-up ratio at the predetermined value during the heat-up and pressurization phase of start-up of said nuclear reactor.
Claim 2
Independent Claim
179 words
An apparatus for automatically starting up a nuclear reactor during a heat-up and pressurization phase of start-up, comprising a plurality of control rods disposed in a reactor core, a control rod driving means for inserting and withdrawing said control rods into and out of said reactor core, temperature detecting means for detecting reactor temperature, heat-up ratio calculator means for calculating a rate of change in the output of said temperature detector means, heat-up ratio reference means for providing a predetermined heat-up ratio value of said reactor temperature, said control rod driving means manipulating said control rods in accordance with the deviation of the output of said heat-up ratio calculator means from the output of said heat-up ratio reference means so as to maintain the heat-up ratio of said reactor temperature at the predetermined value, and heat-up ratio compensation means for correcting said heat-up ratio of said reactor temperature in accordance with at least one condition in said reactor for maintaining said heat-up ratio at the predetermined value during the heat-up and pressurization phase of start-up of said nuclear reactor.
Claim 3
Dependent Claim
27 words
An apparatus as claimed in claim 1, wherein said heat-up ratio compensation means is responsive to reactor pressure for providing an output for correcting said heat-up ratio.
Claim 4
Dependent Claim
26 words
An apparatus according to claim 2, wherein said heat-up ratio compensation means provides the correcting output in response to the reactor pressure reaching a predetermined value.
Claim 5
Dependent Claim
27 words
An apparatus as claimed in claim 3, wherein said heat-up ratio compensation means is responsive to reactor temperature for providing an output for correcting said heat-up ratio.
Claim 6
Dependent Claim
26 words
An apparatus according to claim 4, wherein said heat-up ratio compensation means provides the correcting output in response to the reactor temperature reaching a predetermined value.
Claim 7
Dependent Claim
77 words
An apparatus as claimed in claim 1, further comprising a detector for detecting a reactor thermal power and a reactor thermal power setting means for producing reference signals for reactor thermal power from the outputs of said heat-up ratio reference, said heat-up ratio calculator and said heat-up ratio compensation means and wherein the difference between the outputs of said reactor power setting means and said reactor thermal power detector is applied to said control rod driving means.
Claim 8
Dependent Claim
68 words
An apparatus as claimed in claim 1, further comprising a turbine driven by steam generated in said reactor, a condenser for turning the stream having performed work on said turbine into water and a bypass valve for directly conducting said steam generated in said reactor to said condenser and means for lowering said heat-up ratio by opening said bypass valve when said heat-up ratio exceeds a limiting value.
Claim 9
Dependent Claim
33 words
An apparatus as claimed in claim 1, wherein said control rod driving means is means for sequentially shifting said control rods by distances proper to said respective rods and in a predetermined order.
Claim 10
Independent Claim
267 words
An apparatus for automatically starting up a nuclear reactor comprising a pressure vessel of said nuclear reactor for receiving a reactor core, a plurality of control rods disposed in said reactor core, control rod driving means for inserting and withdrawing said control rods into and out of said reactor core, a temperature detector for detecting a wall temperature of said pressure vessel, a heat-up ratio calculator for calculating a rate of change in the output of said temperature detector, a heat-up ratio reference for setting a heat-up ratio of said wall temperature of said pressure vessel, and a deviation detector for providing a deviation of the output of said heat-up ratio calculator from the output of said heat-up ratio reference, said control rods being manipulated by said control rod driving means in accordance with the output of said deviation detector, means for allowing the manipulation of said control rods in accordance with the output of said deviation detector only during the period from the point of time where said nuclear reactor has reached a critical state to the point of time where the temperature and the pressure of steam generated in said nuclear reactor reach respective predetermined values, a pressure detector for detecting a pressure of said nuclear reactor, and heat-up ratio compensation means responsive to the output of said pressure detector for compensating said heat-up ratio of said wall temperature in a direction of increasing said heat-up ratio of said wall temperature as the detected pressure increases when the detected pressure exceeds a predetermined value of which the water within said nuclear reactor begins to boil.
Claim 11
Independent Claim
267 words
An apparatus for automatically starting up a nuclear reactor comprising a pressure vessel of said nuclear reactor for receiving a reactor core, a plurality of control rods disposed in said reactor core, control rod driving means for inserting and withdrawing said control rods into and out of said reactor core, a temperature detector for detecting a wall temperature of said pressure vessel, a heat-up ratio calculator for calculating a rate of change in the output of said temperature detector, a heat-up ratio reference for setting a heat-up ratio of said wall temperature of said pressure vessel, and a deviation detector for providing a deviation of the output of said heat-up ratio calculator from the output of said heat-up ratio reference, said control rods being manipulated by said control rod driving means in accordance with the output of said deviation detector, means for allowing the manipulation of said control rods in accordance with the output of said deviation detector only during the period from the point of time where said nuclear reactor has reached a critical state to the point of time where the temperature and the pressure of steam generated in said nuclear reactor reach respective predetermined values, a pressure detector for detecting a pressure of said nuclear reactor, and heat-up ratio compensation means responsive to the output of said pressure detector for compensating said heat-up ratio of said wall temperature in a direction of increasing said heat-up ratio of said wall temperature as the detected pressure increases when the detected pressure exceeds a predetermined value of which the water within said nuclear reactor begins to boil.
Claim 12
Independent Claim
255 words
An apparatus for automatically starting up a nuclear reactor comprising a pressure vessel of said nuclear reactor for receiving a reactor core, a plurality of control rods disposed in said reactor core, control rod driving means for inserting and withdrawing said control rods into and out of said reactor core, a temperature detector for detecting a wall temperature of said pressure vessel, a heat-up ratio calculator for calculating a rate of change in the output of said temperature detector, a heat-up ratio reference for setting a heat-up ratio of said wall temperature of said pressure vessel, and a deviation detector for providing a deviation of the output of said heat-up ratio calculator from the output of said heat-up ratio reference, said control rods being manipulated by said control rod driving means in accordance with the output of said deviation detector, means for allowing the manipulation of said control rods in accordance with the output of said deviation detector only during the period from the point of time where said nuclear reactor has reached a critical state to the point of time where the temperature and the pressure of steam generated in said nuclear reactor reach respective predetermined values, and heat-up ratio compensation means responsive to the output of said temperature detector for compensating said heat-up ratio of said wall temperature in a direction of increasing said heat-up ratio of said temperature as the detected temperature increases when the detected temperature exceeds a predetermined value at which the water within said nuclear reactor begins to boil.
Claim 13
Independent Claim
255 words
An apparatus for automatically starting up a nuclear reactor comprising a pressure vessel of said nuclear reactor for receiving a reactor core, a plurality of control rods disposed in said reactor core, control rod driving means for inserting and withdrawing said control rods into and out of said reactor core, a temperature detector for detecting a wall temperature of said pressure vessel, a heat-up ratio calculator for calculating a rate of change in the output of said temperature detector, a heat-up ratio reference for setting a heat-up ratio of said wall temperature of said pressure vessel, and a deviation detector for providing a deviation of the output of said heat-up ratio calculator from the output of said heat-up ratio reference, said control rods being manipulated by said control rod driving means in accordance with the output of said deviation detector, means for allowing the manipulation of said control rods in accordance with the output of said deviation detector only during the period from the point of time where said nuclear reactor has reached a critical state to the point of time where the temperature and the pressure of steam generated in said nuclear reactor reach respective predetermined values, and heat-up ratio compensation means responsive to the output of said temperature detector for compensating said heat-up ratio of said wall temperature in a direction of increasing said heat-up ratio of said temperature as the detected temperature increases when the detected temperature exceeds a predetermined value at which the water within said nuclear reactor begins to boil.
References Cited (Backward Citations)
CA612778A
Cited
GB793771A
Cited
US3284312A
Cited
US3251746A
Cited
US3356577A
Cited
US3341422A
Cited
US3366544A
Cited
US3424653A
Cited
US3778347A
Cited
US3931500A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1981-03-06 | 1981-09-05 | 1982-03-07 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1985-03-06 | 1985-09-05 | 1986-03-07 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1989-03-06 | 1989-09-05 | 1990-03-07 | $7700.00 | Window Closed / Lapsed |