Process for reinforcing reinforced concrete post

Assignee: Kajima Corp
•
Filing: 1975-09-10
•
Granted: 1978-02-07
•
Expires: 1995-09-10
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of maintaining the load bearing integrity of a pre-existing reinforced concrete post during earthquake tremors wherein a sheet metal band is placed about the post and then made integral thereto by inserting a hardenable bonding agent between the band and the post.

Inventors

  • 👤 Kiyoshi Muto
  • 👤 Toshihiko Hisada
  • 👤 Nobutsugu Ohmori
  • 👤 Satoshi Bessho
  • 👤 Naoharu Mori
  • 👤 Katsuhiko Ishikawa

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 10:11
CPC Classifications
E; E04; E04G; E04G23/00; E04G23/02; E04G23/0218

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 149 words
In a pre-existing structurally sound load bearing reinforced concrete post, the method of maintaining the load bearing capacity of said post with bands during earthquake tremors, comprising the steps of: (a) providing a plurality of band segments, (b) bonding spacers to said band segments, (c) securing said segments around said post, thus fitting the spacers to said post, (d) fastening the segments together, thus completely forming said bands, (e) vertically spacing apart said bands one from the other along the longitudinal axis of said post, (f) interposing a hardenable bonding agent between said post and said bands, and (g) permitting said bonding agent to harden sufficiently to convert said post, bonding agent and bands into an integral structure, whereby decrease of load bearing capacity of said post is minimized by said bonded bands when said post is subjected to the attrition of flexing and shear due to earthquake tremors.
Claim 2
Dependent Claim 149 words
In a pre-existing structurally sound load bearing reinforced concrete post, the method of maintaining the load bearing capacity of said post with bands during earthquake tremors, comprising the steps of: (a) providing a plurality of band segments, (b) bonding spacers to said band segments, (c) securing said segments around said post, thus fitting the spacers to said post, (d) fastening the segments together, thus completely forming said bands, (e) vertically spacing apart said bands one from the other along the longitudinal axis of said post, (f) interposing a hardenable bonding agent between said post and said bands, and (g) permitting said bonding agent to harden sufficiently to convert said post, bonding agent and bands into an integral structure, whereby decrease of load bearing capacity of said post is minimized by said bonded bands when said post is subjected to the attrition of flexing and shear due to earthquake tremors.

References Cited (Backward Citations)

US796227A Cited
US822587A Cited
US863555A Cited
US1391352A Cited
US1512660A Cited
US1696934A Cited
US3050161A Cited
US3355852A Cited
US3338058A Cited
US3390951A Cited
US3798867A Cited
US3858374A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-02-06 1981-08-08 1982-02-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-02-06 1985-08-08 1986-02-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-02-06 1989-08-08 1990-02-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag