US4069870A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of cementing well casing using a high temperature cement system
Assignee: Union Oil Company of California
•
Filing: 1976-06-28
•
Granted: 1978-01-24
•
Expires: 1996-06-28
Abstract
Abstract A high temperature cement system including a carbon-containing, low volatile material additive admixed with cement in proportions sufficient to provide a fixed carbon content of at least 0.02 wt.%. Additives include anthracite, calcined coke, uncalcined coke and burned oil shale.
Inventors
- 👤 Julius P. Gallus
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 23:13
CPC Classifications
C; C04; C04B; C04B28/00; C04B28/02; C04B14/00; C04B14/02; C04B14/022; C04B18/00; C04B18/04; C04B18/12; C04B18/125; C04B28/021; C04B28/06; C09; C09K; C09K8/00; C09K8/42; C09K8/46; C09K8/467; C04B2103/00; C04B2103/0027; C04B2103/0028; Y; Y02; Y02W; Y02W30/00; Y02W30/50; Y02W30/91
Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
155 words
A method for cementing a casing in a well bore by placing cement in an annular space between the walls of the well bore and said casing, the method comprising: forming a high temperature cement system comprising oil well cement and carbon-containing cement additive, said cement additive having not more than about 15 wt.% of volatile material and being present in said cement system in at least an amount effective to improve the resistance to degradation of the ultimate permeability and compressive strength of said system due to high temperature and up to 20 wt.% of said cement system; adding a liquid vehicle to said cement system to form a hardenable slurry; and introducing said slurry into the annular space between the casing and the wall of the well bore whereby upon hardening, said cement resists degradation of its ultimate compressive strength and permeability when exposed to temperatures of on the order of 400° F.
Claim 2
Independent Claim
155 words
A method for cementing a casing in a well bore by placing cement in an annular space between the walls of the well bore and said casing, the method comprising: forming a high temperature cement system comprising oil well cement and carbon-containing cement additive, said cement additive having not more than about 15 wt.% of volatile material and being present in said cement system in at least an amount effective to improve the resistance to degradation of the ultimate permeability and compressive strength of said system due to high temperature and up to 20 wt.% of said cement system; adding a liquid vehicle to said cement system to form a hardenable slurry; and introducing said slurry into the annular space between the casing and the wall of the well bore whereby upon hardening, said cement resists degradation of its ultimate compressive strength and permeability when exposed to temperatures of on the order of 400° F.
Claim 3
Dependent Claim
26 words
The method of claim 1 wherein said carbon-containing cement additive is selected from the group consisting of anthracite, burned oil shale, calcined coke and uncalcined coke.
Claim 4
Dependent Claim
22 words
The method of claim 1 wherein said carbon-containing additive comprises between about 0.5 wt.% and about 20 wt.% of said cement system.
Claim 5
Dependent Claim
24 words
The method of claim 1 wherein said liquid vehicle is water and comprises between about 38 wt.% to about 46 wt.% of said slurry.
Claim 6
Dependent Claim
27 words
The method of claim 1 wherein said oil well cement is selected from the group consisting of Portland cement, pozzolan cement, high alumina cement and mixtures thereof.
Claim 7
Dependent Claim
15 words
The method of claim 1 wherein said oil well cement is API class G cement.
Claim 8
Dependent Claim
15 words
The method of claim 1 wherein said oil well cement is API class J cement.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1981-01-23 | 1981-07-25 | 1982-01-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1985-01-23 | 1985-07-25 | 1986-01-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1989-01-23 | 1989-07-25 | 1990-01-24 | $7700.00 | Window Closed / Lapsed |