Method for constructing a reliable foundation in soft soil formations

Assignee: Takenaka Komuten Co Ltd
•
Filing: 1976-09-02
•
Granted: 1978-01-03
•
Expires: 1996-09-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for constructing a tubular pile foundation in soft soil formations comprises agitating the soft soil to form an agitated region like a tube with single annular section or tubes with conjugated annular section at a time, injecting chemical hardener and mixing it with the soft soil to solidify the agitated region in situ into a tubular pile or conjugated tubular piles. By repeating the foregoing steps, the structural wall of piles is constructed to provide bearing capacity with the soft soil formations.

Inventors

  • 👤 Atsushi Takagi
  • 👤 Hiroyuki Kuroiwa
  • 👤 Masao Miyaguchi
  • 👤 Tateo Kawamura

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 16:41
CPC Classifications
E; E02; E02D; E02D5/00; E02D5/22; E02D5/34; E02D5/46; E02D5/18

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 144 words
A method of constructing a tubular pile foundation in soft soil formations comprising agitating the soft soil to form an agitated region like a tube with single annular section to the depth reaching a bedrock or to the substantial depth enough to provide required bearing capacity with the soft soil formations, injecting chemical hardener slurry into the soft soil during said agitating, simultaneously mixing the chemical hardener slurry with the soft soil to give soil mixture to be solidified, repeating foregoing steps before the last agitated tubular region is completely solidified so that a new agitated tubular region is adjacent to or partly overlapped said last agitated tubular region, and solidifying in situ a wall of linked tubular piles formed through said repeating, wherein the soft soil formation is provided with bearing capacity by constructing a structural wall foundation of the linked piles therein.
Claim 2
Independent Claim 144 words
A method of constructing a tubular pile foundation in soft soil formations comprising agitating the soft soil to form an agitated region like a tube with single annular section to the depth reaching a bedrock or to the substantial depth enough to provide required bearing capacity with the soft soil formations, injecting chemical hardener slurry into the soft soil during said agitating, simultaneously mixing the chemical hardener slurry with the soft soil to give soil mixture to be solidified, repeating foregoing steps before the last agitated tubular region is completely solidified so that a new agitated tubular region is adjacent to or partly overlapped said last agitated tubular region, and solidifying in situ a wall of linked tubular piles formed through said repeating, wherein the soft soil formation is provided with bearing capacity by constructing a structural wall foundation of the linked piles therein.
Claim 3
Independent Claim 154 words
A method for constructing a tubular pile foundation in soft soil formations, agitating the soft soil to form an agitated region like a conjugated tubes with at least one pair of annular section at a time to the depth reaching a bedrock or to the substantial depth enough to provide bearing capacity with the soft soil formations, injecting chemical hardener slurry into the soft soil during said agitating, simultaneously mixing the chemical hardener slurry with the soft soil to give soil mixture to be solidified, repeating the foregoing steps before the last agitated conjugated region is completely solidified so that a new agitated conjugated tubular region is adjacent to or overlapped with said last agitated conjugated tubular region, solidifying in situ a wall of linked tubular piles formed through said repeating, and wherein the soft soil formation is provided with bearing capacity by constructing a structural wall foundation of the linked tubular piles therein.
Claim 4
Independent Claim 154 words
A method for constructing a tubular pile foundation in soft soil formations, agitating the soft soil to form an agitated region like a conjugated tubes with at least one pair of annular section at a time to the depth reaching a bedrock or to the substantial depth enough to provide bearing capacity with the soft soil formations, injecting chemical hardener slurry into the soft soil during said agitating, simultaneously mixing the chemical hardener slurry with the soft soil to give soil mixture to be solidified, repeating the foregoing steps before the last agitated conjugated region is completely solidified so that a new agitated conjugated tubular region is adjacent to or overlapped with said last agitated conjugated tubular region, solidifying in situ a wall of linked tubular piles formed through said repeating, and wherein the soft soil formation is provided with bearing capacity by constructing a structural wall foundation of the linked tubular piles therein.
Claim 5
Dependent Claim 35 words
a method claimed in claim 1, wherin a part of said soil mixture is overflowed during said mixing over a surface of the soft soil formations as to form a mat covering the pile foundation.
Claim 6
Dependent Claim 35 words
A method claimed in claim 2, wherein a part of said soil mixture is overflowed during said mixing over a surface of the soft soil formations as to form a mat covering the pile foundation.
Claim 7
Dependent Claim 38 words
The method as claimed in claim 1, wherein said steps of agitating and mixing include the step of rotationally driving a drive shaft and an agitating barrel having a plurality of blades thereon to agitate a tube-shaped region.
Claim 8
Dependent Claim 46 words
The method as claimed in claim 2, wherein said steps of agitating and mixing include the step of rotationally driving at least one drive shaft and at least one agitating barrel, each barrel having a plurality of blades thereon to agitate at least one tube-shaped region.

References Cited (Backward Citations)

US2718761A Cited
US2680416A Cited
US2782605A Cited
US3023585A Cited
US3243962A Cited
US3875751A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-01-02 1981-07-04 1982-01-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-01-02 1985-07-04 1986-01-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-01-02 1989-07-04 1990-01-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag