US4063429A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Pipeline retard, support and protection method
Assignee: Individual
•
Filing: 1975-07-14
•
Granted: 1977-12-20
•
Expires: 1995-07-14
Abstract
Abstract A pipeline retard, support and protection method wherein a fast-setting expandable foam is placed in a trench at spaced locations below and around a pipeline to create spaced retards and support pads in situ. Each retard and/or support pad is created in the absence of forms or other foam molding means for the expanding foam. The retards may be keyed to the trench walls and base for securement. The system is also adaptable to encapsulating a portion of the pipeline which transverses a roadbed.
Inventors
- 👤 Ernest I. Wilson
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 21:34
CPC Classifications
F; F16; F16L; F16L58/00; F16L58/02; F16L58/04; F16L58/10; F16L58/1054; F16L58/1072; F16L1/00; F16L1/024; F16L1/028
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
191 words
A method of inhibiting soil erosion along a pipeline in a trench, the steps of: selecting a pipeline segment which is characterized by a space between each side of the pipeline and the banks of the trench; directing the nozzle of a spray apparatus toward one of the spaces and delivering a foam reaction mixture through the spray nozzle to the bottom of the trench immediately adjacent one side of the pipeline segment and filling at least a portion of the space along the selected pipeline segment by creating an accretion of foam between one side of the pipeline segment and one bank of the trench; removing the spray nozzle to the other side of the pipeline segment essentially diametrally opposite the one side and repeating the directing and delivering steps and filling at least a portion of the space along the pipeline segment by creating an accretion of foam between the other side of the pipeline segment and the other bank of the trench, the accretion of foam on both sides of the pipeline segment forming a retard; and backfilling the trench around the accretion of foam forming the retard.
Claim 2
Independent Claim
191 words
A method of inhibiting soil erosion along a pipeline in a trench, the steps of: selecting a pipeline segment which is characterized by a space between each side of the pipeline and the banks of the trench; directing the nozzle of a spray apparatus toward one of the spaces and delivering a foam reaction mixture through the spray nozzle to the bottom of the trench immediately adjacent one side of the pipeline segment and filling at least a portion of the space along the selected pipeline segment by creating an accretion of foam between one side of the pipeline segment and one bank of the trench; removing the spray nozzle to the other side of the pipeline segment essentially diametrally opposite the one side and repeating the directing and delivering steps and filling at least a portion of the space along the pipeline segment by creating an accretion of foam between the other side of the pipeline segment and the other bank of the trench, the accretion of foam on both sides of the pipeline segment forming a retard; and backfilling the trench around the accretion of foam forming the retard.
Claim 3
Dependent Claim
70 words
A method as defined in claim 1 further comprising excavating a notch in at least one surface of the trench adjacent the selected pipeline segment and directing the spray nozzle into the excavated notch at the same time that foam is delivered between the pipeline segment and the one bank of the trench thereby forming by the accretion of foam a unitary retard which is interlocked into the trench wall.
Claim 4
Dependent Claim
52 words
A method as defined in claim 1 wherein said terminating step is preceded by the step of spraying foam reaction mixture over the top of the pipeline segment between the filled spaces on the diametrally opposed sides of the pipeline thereby encapsulating the pipeline only at the location of the selected segment.
Claim 5
Independent Claim
302 words
A method of inhibiting soil erosion along a pipeline situated in a trench, the steps of: selecting a segment of pipeline upon which a retard is to be formed, said segment having its sides spaced from both banks of the trench; suspending the pipeline segment such that a space exists between the bottom of the trench and the pipeline segment; inserting a spray nozzle into the trench and directing the spray nozzle toward the space between the trench bottom and the underside of the pipeline segment; spraying a foam reaction mixture into the space and substantially filling at least a portion of the space thereby forming a support pad; removing the spray nozzle to the space between one side of the pipeline segment and the trench bank and delivering foam reaction mixture into the space between the pipeline segment and the trench bank so as to be contiguous with the support pad, creating thereby an accretion of foam united with the support pad and filling at least a portion of the space only along the one side of the selected segment of pipeline; repeating the removing and delivering steps in the space between the other side of the pipeline segment and the trench bank contiguous with the support pad, creating thereby an accretion of foam united with the support pad and filling at least a portion of the space only along the other side of the selected pipeline segment; and terminating the accretion of foam before the foam reaches the upper edge of the trench banks thereby forming a retard in situ which is united with the support pad, substantially fills the spaces between the trench banks and the sides of the pipeline only along the pipeline segment and is recessed into the trench below the upper edge of the trench banks.
Claim 6
Independent Claim
302 words
A method of inhibiting soil erosion along a pipeline situated in a trench, the steps of: selecting a segment of pipeline upon which a retard is to be formed, said segment having its sides spaced from both banks of the trench; suspending the pipeline segment such that a space exists between the bottom of the trench and the pipeline segment; inserting a spray nozzle into the trench and directing the spray nozzle toward the space between the trench bottom and the underside of the pipeline segment; spraying a foam reaction mixture into the space and substantially filling at least a portion of the space thereby forming a support pad; removing the spray nozzle to the space between one side of the pipeline segment and the trench bank and delivering foam reaction mixture into the space between the pipeline segment and the trench bank so as to be contiguous with the support pad, creating thereby an accretion of foam united with the support pad and filling at least a portion of the space only along the one side of the selected segment of pipeline; repeating the removing and delivering steps in the space between the other side of the pipeline segment and the trench bank contiguous with the support pad, creating thereby an accretion of foam united with the support pad and filling at least a portion of the space only along the other side of the selected pipeline segment; and terminating the accretion of foam before the foam reaches the upper edge of the trench banks thereby forming a retard in situ which is united with the support pad, substantially fills the spaces between the trench banks and the sides of the pipeline only along the pipeline segment and is recessed into the trench below the upper edge of the trench banks.
References Cited (Backward Citations)
CA780179A
Cited
US685522A
Cited
GB190217227A
Cited
US922106A
Cited
US1588897A
Cited
US1671679A
Cited
US2447937A
Cited
US2738745A
Cited
US2987891A
Cited
US3032827A
Cited
US3131541A
Cited
US3349568A
Cited
US3380258A
Cited
US3354660A
Cited
US3444279A
Cited
US3432582A
Cited
US3462962A
Cited
US3655564A
Cited
US3564859A
Cited
US3626702A
Cited
US3722225A
Cited
GB1360964A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1980-12-19 | 1981-06-20 | 1981-12-20 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1984-12-19 | 1985-06-20 | 1985-12-20 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1988-12-19 | 1989-06-20 | 1989-12-20 | $7700.00 | Window Closed / Lapsed |