US4060130A Expired / Lapsed US ⏱️ 0.0 years remaining

Cleanout procedure for well with low bottom hole pressure

Assignee: Texaco Trinidad Inc
•
Filing: 1976-06-28
•
Granted: 1977-11-29
•
Expires: 1996-06-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A cleanout procedure for use in a well with low bottom hole pressure that has become filled with sand. It employs a conductor string of pipe and a wash string of pipe inside the conductor string, both inserted in the well. A high pressure gas is applied to the inner annulus formed by the conductor and wash string, and the workover wash fluid is circulated down the wash string up the outer annulus formed by the well casing and the conductor string, to be joined by the gas and so wash out the sand through the outer annulus. Sand is separated at the surface.

Inventors

  • 👤 Joseph I. Hart

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 23:28
CPC Classifications
E; E21; E21B; E21B21/00; E21B37/00; E21B43/00; E21B43/34; E21B43/35

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 117 words
Cleanout procedure for a low pressure well containing sand fill and well fluid therein, comprising the steps of: inserting a first string of pipe in said well and forming an outer annulus therearound in the well, said first string extending below the static fluid level of said well fluid in said well, inserting a second string of pipe inside said first string and forming an inner annulus between said strings, said second string extending adjacent to the top of said sand fill, applying a gas under pressure to one of said annuli, and circulating a wash fluid down said second string of pipe to wash out sand with gas entrained fluid through the other of said annuli.
Claim 2
Dependent Claim 117 words
Cleanout procedure for a low pressure well containing sand fill and well fluid therein, comprising the steps of: inserting a first string of pipe in said well and forming an outer annulus therearound in the well, said first string extending below the static fluid level of said well fluid in said well, inserting a second string of pipe inside said first string and forming an inner annulus between said strings, said second string extending adjacent to the top of said sand fill, applying a gas under pressure to one of said annuli, and circulating a wash fluid down said second string of pipe to wash out sand with gas entrained fluid through the other of said annuli.
Claim 3
Dependent Claim 20 words
Cleanout procedure according to claim 1, further comprising: separating said washed out sand for disposal, and recirculating said wash fluid.
Claim 4
Dependent Claim 21 words
Cleanout procedure according to claim 2, further comprising: a first step of removing any production string of pipe from said well.
Claim 5
Dependent Claim 16 words
Cleanout procedure according to claim 3, further comprising: separating said gas from said gas entrained fluid.
Claim 6
Dependent Claim 15 words
Cleanout procedure according to claim 4, wherein: said gas is applied to said inner annulus.
Claim 7
Dependent Claim 15 words
Cleanout procedure according to claim 3, wherein: said gas is applied to said inner annulus.
Claim 8
Dependent Claim 15 words
Cleanout procedure according to claim 2, wherein: said gas is applied to said inner annulus.
Claim 9
Dependent Claim 15 words
Cleanout procedure according to claim 1, wherein: said gas is applied to said inner annulus.
Claim 10
Dependent Claim 244 words
Cleanout procedure for a low pressure well having a casing head and a string of production tubing therein and containing sand fill, comprising the steps of: removing said production string, determining the static fluid level and the level of sand fill in said well, inserting a first string of conductor pipe in said well to form an outer annulus between the walls of said well and the outside of said conductor pipe string, landing said first string of conductor pipe for support at said casing head with the bottom above said sand fill level but beneath said static fluid level, connecting an inlet connector for high pressure gas to the inside of said first string of conductor pipe, connecting an outlet connector for a return line to carry effluent from said outer annulus to a separator, inserting a second string of circulating fluid pipe inside said first string of conductor pipe to form an inner annulus between said first and second strings, attaching said second string of pipe, to a swivel with the bottom of the string at the level of said sand fill, applying a high pressure gas to said inlet connector for unloading fluid from said inner annulus via said outer annulus, starting to circulate wash fluid down through said second string of pipe while adjusting said application of high pressure gas to maintain circulation in gentle surges, and washing down with said second string of pipe to clean out said sand.
Claim 11
Dependent Claim 244 words
Cleanout procedure for a low pressure well having a casing head and a string of production tubing therein and containing sand fill, comprising the steps of: removing said production string, determining the static fluid level and the level of sand fill in said well, inserting a first string of conductor pipe in said well to form an outer annulus between the walls of said well and the outside of said conductor pipe string, landing said first string of conductor pipe for support at said casing head with the bottom above said sand fill level but beneath said static fluid level, connecting an inlet connector for high pressure gas to the inside of said first string of conductor pipe, connecting an outlet connector for a return line to carry effluent from said outer annulus to a separator, inserting a second string of circulating fluid pipe inside said first string of conductor pipe to form an inner annulus between said first and second strings, attaching said second string of pipe, to a swivel with the bottom of the string at the level of said sand fill, applying a high pressure gas to said inlet connector for unloading fluid from said inner annulus via said outer annulus, starting to circulate wash fluid down through said second string of pipe while adjusting said application of high pressure gas to maintain circulation in gentle surges, and washing down with said second string of pipe to clean out said sand.
Claim 12
Dependent Claim 155 words
Cleanout procedure for a well with low bottom hole pressure containing sand fill, comprising the steps of: first removing any production string of pipe from said well, inserting a first string of pipe in said well and forming an outer annulus therearound in said well, said first string extending below the static fluid level in said well, inserting a second string of pipe inside said first string and forming an inner annulus between said strings, said second string extending adjacent to the top of said sand fill, applying a gas under high pressure to said inner annulus, circulating a wash fluid down said second string of pipe to wash out said sand with gas entrained fluid through said outer annulus, separating said washed out sand for disposal, separating said gas from said gas entrained fluid, and recirculating said wash fluid while continuing the foregoing steps until said sand fill has been removed from the well.
Claim 13
Dependent Claim 155 words
Cleanout procedure for a well with low bottom hole pressure containing sand fill, comprising the steps of: first removing any production string of pipe from said well, inserting a first string of pipe in said well and forming an outer annulus therearound in said well, said first string extending below the static fluid level in said well, inserting a second string of pipe inside said first string and forming an inner annulus between said strings, said second string extending adjacent to the top of said sand fill, applying a gas under high pressure to said inner annulus, circulating a wash fluid down said second string of pipe to wash out said sand with gas entrained fluid through said outer annulus, separating said washed out sand for disposal, separating said gas from said gas entrained fluid, and recirculating said wash fluid while continuing the foregoing steps until said sand fill has been removed from the well.

References Cited (Backward Citations)

US1484601A Cited
US2768694A Cited
US2726063A Cited
US3268017A Cited
US3464495A Cited
US3534822A Cited
US3497020A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-11-28 1981-05-30 1981-11-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-11-28 1985-05-30 1985-11-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-11-28 1989-05-30 1989-11-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag