Cleanout procedure for well with low bottom hole pressure
Assignee: Texaco Trinidad Inc
•
Filing: 1976-06-28
•
Granted: 1977-11-29
•
Expires: 1996-06-28
Abstract
Abstract A cleanout procedure for use in a well with low bottom hole pressure that has become filled with sand. It employs a conductor string of pipe and a wash string of pipe inside the conductor string, both inserted in the well. A high pressure gas is applied to the inner annulus formed by the conductor and wash string, and the workover wash fluid is circulated down the wash string up the outer annulus formed by the well casing and the conductor string, to be joined by the gas and so wash out the sand through the outer annulus. Sand is separated at the surface.
Inventors
- 👤 Joseph I. Hart
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 23:28
CPC Classifications
E; E21; E21B; E21B21/00; E21B37/00; E21B43/00; E21B43/34; E21B43/35
Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
117 words
Cleanout procedure for a low pressure well containing sand fill and well fluid therein, comprising the steps of: inserting a first string of pipe in said well and forming an outer annulus therearound in the well, said first string extending below the static fluid level of said well fluid in said well, inserting a second string of pipe inside said first string and forming an inner annulus between said strings, said second string extending adjacent to the top of said sand fill, applying a gas under pressure to one of said annuli, and circulating a wash fluid down said second string of pipe to wash out sand with gas entrained fluid through the other of said annuli.
Claim 2
Dependent Claim
117 words
Cleanout procedure for a low pressure well containing sand fill and well fluid therein, comprising the steps of: inserting a first string of pipe in said well and forming an outer annulus therearound in the well, said first string extending below the static fluid level of said well fluid in said well, inserting a second string of pipe inside said first string and forming an inner annulus between said strings, said second string extending adjacent to the top of said sand fill, applying a gas under pressure to one of said annuli, and circulating a wash fluid down said second string of pipe to wash out sand with gas entrained fluid through the other of said annuli.
Claim 3
Dependent Claim
20 words
Cleanout procedure according to claim 1, further comprising: separating said washed out sand for disposal, and recirculating said wash fluid.
Claim 4
Dependent Claim
21 words
Cleanout procedure according to claim 2, further comprising: a first step of removing any production string of pipe from said well.
Claim 5
Dependent Claim
16 words
Cleanout procedure according to claim 3, further comprising: separating said gas from said gas entrained fluid.
Claim 6
Dependent Claim
15 words
Cleanout procedure according to claim 4, wherein: said gas is applied to said inner annulus.
Claim 7
Dependent Claim
15 words
Cleanout procedure according to claim 3, wherein: said gas is applied to said inner annulus.
Claim 8
Dependent Claim
15 words
Cleanout procedure according to claim 2, wherein: said gas is applied to said inner annulus.
Claim 9
Dependent Claim
15 words
Cleanout procedure according to claim 1, wherein: said gas is applied to said inner annulus.
Claim 10
Dependent Claim
244 words
Cleanout procedure for a low pressure well having a casing head and a string of production tubing therein and containing sand fill, comprising the steps of: removing said production string, determining the static fluid level and the level of sand fill in said well, inserting a first string of conductor pipe in said well to form an outer annulus between the walls of said well and the outside of said conductor pipe string, landing said first string of conductor pipe for support at said casing head with the bottom above said sand fill level but beneath said static fluid level, connecting an inlet connector for high pressure gas to the inside of said first string of conductor pipe, connecting an outlet connector for a return line to carry effluent from said outer annulus to a separator, inserting a second string of circulating fluid pipe inside said first string of conductor pipe to form an inner annulus between said first and second strings, attaching said second string of pipe, to a swivel with the bottom of the string at the level of said sand fill, applying a high pressure gas to said inlet connector for unloading fluid from said inner annulus via said outer annulus, starting to circulate wash fluid down through said second string of pipe while adjusting said application of high pressure gas to maintain circulation in gentle surges, and washing down with said second string of pipe to clean out said sand.
Claim 11
Dependent Claim
244 words
Cleanout procedure for a low pressure well having a casing head and a string of production tubing therein and containing sand fill, comprising the steps of: removing said production string, determining the static fluid level and the level of sand fill in said well, inserting a first string of conductor pipe in said well to form an outer annulus between the walls of said well and the outside of said conductor pipe string, landing said first string of conductor pipe for support at said casing head with the bottom above said sand fill level but beneath said static fluid level, connecting an inlet connector for high pressure gas to the inside of said first string of conductor pipe, connecting an outlet connector for a return line to carry effluent from said outer annulus to a separator, inserting a second string of circulating fluid pipe inside said first string of conductor pipe to form an inner annulus between said first and second strings, attaching said second string of pipe, to a swivel with the bottom of the string at the level of said sand fill, applying a high pressure gas to said inlet connector for unloading fluid from said inner annulus via said outer annulus, starting to circulate wash fluid down through said second string of pipe while adjusting said application of high pressure gas to maintain circulation in gentle surges, and washing down with said second string of pipe to clean out said sand.
Claim 12
Dependent Claim
155 words
Cleanout procedure for a well with low bottom hole pressure containing sand fill, comprising the steps of: first removing any production string of pipe from said well, inserting a first string of pipe in said well and forming an outer annulus therearound in said well, said first string extending below the static fluid level in said well, inserting a second string of pipe inside said first string and forming an inner annulus between said strings, said second string extending adjacent to the top of said sand fill, applying a gas under high pressure to said inner annulus, circulating a wash fluid down said second string of pipe to wash out said sand with gas entrained fluid through said outer annulus, separating said washed out sand for disposal, separating said gas from said gas entrained fluid, and recirculating said wash fluid while continuing the foregoing steps until said sand fill has been removed from the well.
Claim 13
Dependent Claim
155 words
Cleanout procedure for a well with low bottom hole pressure containing sand fill, comprising the steps of: first removing any production string of pipe from said well, inserting a first string of pipe in said well and forming an outer annulus therearound in said well, said first string extending below the static fluid level in said well, inserting a second string of pipe inside said first string and forming an inner annulus between said strings, said second string extending adjacent to the top of said sand fill, applying a gas under high pressure to said inner annulus, circulating a wash fluid down said second string of pipe to wash out said sand with gas entrained fluid through said outer annulus, separating said washed out sand for disposal, separating said gas from said gas entrained fluid, and recirculating said wash fluid while continuing the foregoing steps until said sand fill has been removed from the well.
References Cited (Backward Citations)
US1484601A
Cited
US2768694A
Cited
US2726063A
Cited
US3268017A
Cited
US3464495A
Cited
US3534822A
Cited
US3497020A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1980-11-28 | 1981-05-30 | 1981-11-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1984-11-28 | 1985-05-30 | 1985-11-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1988-11-28 | 1989-05-30 | 1989-11-29 | $7700.00 | Window Closed / Lapsed |