Claims Analysis
Total Claims: 25
Claim 1
Independent Claim
231 words
A method for measuring the direction, linear flow rate and volume flow rate of behind casing water migration in a cased portion of a producing well operating on gas lift and producing well fluid through casing perforations which is transmitted to the earth's surface in relatively small diameter production tubing, without substantially interrupting the production of the well, comprising the steps of: a. locating a well tool sized and adapted for passage through relatively small diameter production tubing and having a source of fast neutrons at least some of which having sufficient energy to cause the nuclear reaction 0 16 (n,p) N 16 and at least two gamma ray detectors longitudinally spaced from said source and each other to a position adjacent above or below the producing perforations to be investigated by passing said tool through the production tubing while keeping the well on production; b. repetitively irradiating the borehole environs with bursts of fast neutrons from said source; c. detecting substantially between said neutron bursts at each of said detectors gamma rays primarily caused by the decay of the unstable isotope N 16 and generating signals representative thereof; and d. combining said signals according to a predetermined relationship to derive an indication of the direction and linear flow rate of any elemental oxygen nuclei comprising undesired fluid flow in a preferred direction behind the well casing at said adjacent position.
Claim 2
Independent Claim
231 words
A method for measuring the direction, linear flow rate and volume flow rate of behind casing water migration in a cased portion of a producing well operating on gas lift and producing well fluid through casing perforations which is transmitted to the earth's surface in relatively small diameter production tubing, without substantially interrupting the production of the well, comprising the steps of: a. locating a well tool sized and adapted for passage through relatively small diameter production tubing and having a source of fast neutrons at least some of which having sufficient energy to cause the nuclear reaction 0 16 (n,p) N 16 and at least two gamma ray detectors longitudinally spaced from said source and each other to a position adjacent above or below the producing perforations to be investigated by passing said tool through the production tubing while keeping the well on production; b. repetitively irradiating the borehole environs with bursts of fast neutrons from said source; c. detecting substantially between said neutron bursts at each of said detectors gamma rays primarily caused by the decay of the unstable isotope N 16 and generating signals representative thereof; and d. combining said signals according to a predetermined relationship to derive an indication of the direction and linear flow rate of any elemental oxygen nuclei comprising undesired fluid flow in a preferred direction behind the well casing at said adjacent position.
Claim 3
Dependent Claim
53 words
The method of claim 1 and further including the step of estimating the radial distance from the detector locations of such undesired fluid flow and combining said distance and said linear flow rate indication according to a second predetermined relationship to provide an indication of the volume flow rate of such undesired flow.
Claim 4
Dependent Claim
26 words
The method of claim 1 wherein the detecting step further includes the step of separating said representative signals into at least two separate energy dependent signals.
Claim 5
Dependent Claim
47 words
The method of claim 3 and further including the step of combining said at least two separate energy dependent signals according to a third predetermined relationship to derive an indication of the radial distance from the detector to the location of the undesired behind casing fluid flow.
Claim 6
Dependent Claim
43 words
The method of claim 4 and further including the step of combining said linear flow rate indication and said distance indication according to a fourth predetermined relationship to provide an indication of the volume flow rate of the undesired behind casing fluid flow.
Claim 7
Dependent Claim
66 words
The method of claim 1 and further including the steps of: removing said well tool from the borehole after making the first measurement sequence adjacent above or below the perforation; reversing the juxtaposition of said source and said detectors; locating said tool in the opposite sense adjacent below or above the perforations; and repeating steps (b), (c) and (d) with said tool in the new location.
Claim 8
Dependent Claim
53 words
The method of claim 6 and further including the step of estimating the radial distance from the detector locations of such undesired fluid flow and combining said distance and said linear flow rate indication according to a second predetermined relationship to provide an indication of the volume flow rate of such undesired flow.
Claim 9
Dependent Claim
39 words
The method of claim 6 wherein the steps of irradiating and detecting are performed by repetitively irradiating the borehole environs with bursts of fast neutrons and the detecting step is primarily performed in the time intervals between the bursts.
Claim 10
Dependent Claim
26 words
The method of claim 8 wherein the detecting step further includes the step of separating said representative signals into at least two separate energy dependent signals.
Claim 11
Dependent Claim
47 words
The method of claim 9 and further including the step of combining said at least two separate energy dependent signals according to a third predetermined relationship to derive an indication of the radial distance from the detectors to the location of the undesired behind casing fluid flow.
Claim 12
Dependent Claim
43 words
The method of claim 10 and further including the step of combining said linear flow rate indication and said distance indication according to a fourth predetermined relationship to provide an indication of the volume flow rate of the undesired behind casing fluid flow.
Claim 13
Independent Claim
243 words
A method for measuring the direction, linear flow rate and volume flow rate of behind casing water migration in a cased portion of a producing well operating on gas lift and producing well fluid through casing perforations which is transmitted to the earth's surface in relatively small diameter production tubing, without substantially interrupting the production of the well, comprising the steps of: a. lowering a well tool sized and adapted for passage through relatively small diameter production tubing and having a source of fast neutrons at least some of which having sufficient energy to cause the nuclear reaction 0 16 (n,p) N 16 and at least two gamma ray detectors longitudinally spaced from said source and each other through the production tubing and into the producing zone of the well; b. moving said tool at a known rate upwardly or downwardly from a position adjacent above or below said perforations to a position approximately at the same depth level in the well of the perforations; c. irradiating the borehole environs with fast neutrons from said source; d. detecting at each of said detectors gamma rays primarily caused by the decay of the unstable isotope N 16 and generating signals representative thereof; and e. combining said signals according to a predetermined relationship to derive an indication of the direction and linear flow rate of any elemental oxygen nuclei comprising undesired fluid flow in a preferred direction behind the well casing at said adjacent position.
Claim 14
Independent Claim
243 words
A method for measuring the direction, linear flow rate and volume flow rate of behind casing water migration in a cased portion of a producing well operating on gas lift and producing well fluid through casing perforations which is transmitted to the earth's surface in relatively small diameter production tubing, without substantially interrupting the production of the well, comprising the steps of: a. lowering a well tool sized and adapted for passage through relatively small diameter production tubing and having a source of fast neutrons at least some of which having sufficient energy to cause the nuclear reaction 0 16 (n,p) N 16 and at least two gamma ray detectors longitudinally spaced from said source and each other through the production tubing and into the producing zone of the well; b. moving said tool at a known rate upwardly or downwardly from a position adjacent above or below said perforations to a position approximately at the same depth level in the well of the perforations; c. irradiating the borehole environs with fast neutrons from said source; d. detecting at each of said detectors gamma rays primarily caused by the decay of the unstable isotope N 16 and generating signals representative thereof; and e. combining said signals according to a predetermined relationship to derive an indication of the direction and linear flow rate of any elemental oxygen nuclei comprising undesired fluid flow in a preferred direction behind the well casing at said adjacent position.
Claim 15
Dependent Claim
53 words
The method of claim 12 and further including the step of estimating the radial distance from the detector locations of such undesired fluid flow and combining said distance and said linear flow rate indication according to a second predetermined relationship to provide an indication of the volume flow rate of such undesired flow.
Claim 16
Dependent Claim
39 words
The method of claim 12 wherein the steps of irradiating and detecting are performed by repetitively irradiating the borehole environs with bursts of fast neutrons and the detecting step is primarily performed in the time intervals between the bursts.
Claim 17
Dependent Claim
26 words
The method of claim 14 wherein the detecting step further includes the step of separating said representative signals into at least two separate energy dependent signals.
Claim 18
Dependent Claim
47 words
The method of claim 15 and further including the step of combining said at least two separate energy dependent signals according to a third predetermined relationship to derive an indication of the radial distance from the detectors to the location of the undesired behind casing fluid flow.
Claim 19
Dependent Claim
43 words
The method of claim 16 and further including the step of combining said linear flow rate indication and said distance indication according to a fourth predetermined relationship to provide an indication of the volume flow rate of the undesired behind casing fluid flow.
Claim 20
Dependent Claim
77 words
The method of claim 12 and further including the steps of: removing said well tool from the borehole after making the first measurement sequence moving said tool upwardly or downwardly; reversing the juxtaposition of said source and said detectors; lowering said tool into the producing zone through said tubing string; and repeating steps (b) (c), (d), and (e) while moving said tool at a known rate in the opposite sense from that of the first measuring sequence.
Claim 21
Dependent Claim
53 words
The method of claim 18 and further including the step of estimating the radial distance from the detector locations of such undesired fluid flow and combining said distance and said linear flow rate indication according to a second predetermined relationship to provide an indication of the volume flow rate of such undesired flow.
Claim 22
Dependent Claim
39 words
The method of claim 18 wherein the step of irradiating and detecting are performed by repetitively irradiating the borehole environs with bursts of fast neutrons and the detecting step is primarily performed in the time intervals between the bursts.
Claim 23
Dependent Claim
26 words
The method of claim 20 wherein the detecting step further includes the step of separating said representative signals into at least two separate energy dependent signals.
Claim 24
Dependent Claim
47 words
The method of claim 21 and further including the step of combining said at least two separate energy dependent signals according to a third predetermined relationship to derive an indication of the radial distance from the detector to the location of the undesired behind casing fluid flow.
Claim 25
Dependent Claim
43 words
The method of claim 22 and further including the step of combining said linear flow rate indication and said distance indication according to a fourth predetermined relationship to provide an indication of the volume flow rate of the undesired behind casing fluid flow.