Patent US4124331A successfully refreshed from Google Patents.
Patent US4053974A successfully refreshed from Google Patents.
US4053974A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of forming a concrete structure with a recess to receive an anchorage
Assignee: CONENCO INTERNATIONAL Ltd
•
Filing: 1976-01-30
•
Granted: 1977-10-18
•
Expires: 1996-01-30
Abstract
Abstract A tendon anchorage for use in prestressing concrete members is disclosed which preferably includes a tubular mounting means mounted to extend over the tendon and through an opening in a bearing or anchor plate in order to secure the bearing plate in fixed and aligned relation to a tendon for casting the bearing plate into the concrete member in a predetermined orientation therein. Spacing means between the form board and the anchor plate allow the anchor plate to be cast into a recess in the concrete member. A wedge receiving housing and wedge assembly is positioned in alignment and in abutting relation with the bearing plate after casting of the bearing plate into the concrete.
Inventors
- 👤 George H. Howlett
- 👤 James W. Howlett
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 22:00
CPC Classifications
E; E04; E04C; E04C5/00; E04C5/08; E04C5/12; E04C5/122; Y; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/49826; Y10T29/49863; Y10T29/49874; Y10T29/49888; Y10T29/49945
Claims Analysis
Total Claims: 3
Claim 1
Independent Claim
193 words
A method of forming a cast-in-place concrete structure with a recess for receiving an anchorage for securement of a concrete reinforcing tendon including the steps of positioning a bearing plate formed with an opening dimensioned to receive said tendon around said tendon in spaced relation to a concrete form, positioning spacing means formed with an opening therein dimensioned to receive said tendon around said tendon with said opening in said spacing means in axial alignment with said opening in said bearing plate, securing said bearing plate in fixed spaced relation to said form with said spacing means in abutting relation with said bearing plate and, with said form, pouring concrete into said form about said tendon, bearing plate and spacing means and allowing said concrete to harden, and removing said form and said spacing means, wherein the improvement in said method of forming a cast-in-place concrete structure with a recess for receiving an anchorage comprises the step of: after removing said form and said spacing means, inserting a tendon anchorage formed to receive convergently actuating gripping means into said recess formed by said spacing means around said tendon and against said bearing plate.
Claim 2
Independent Claim
193 words
A method of forming a cast-in-place concrete structure with a recess for receiving an anchorage for securement of a concrete reinforcing tendon including the steps of positioning a bearing plate formed with an opening dimensioned to receive said tendon around said tendon in spaced relation to a concrete form, positioning spacing means formed with an opening therein dimensioned to receive said tendon around said tendon with said opening in said spacing means in axial alignment with said opening in said bearing plate, securing said bearing plate in fixed spaced relation to said form with said spacing means in abutting relation with said bearing plate and, with said form, pouring concrete into said form about said tendon, bearing plate and spacing means and allowing said concrete to harden, and removing said form and said spacing means, wherein the improvement in said method of forming a cast-in-place concrete structure with a recess for receiving an anchorage comprises the step of: after removing said form and said spacing means, inserting a tendon anchorage formed to receive convergently actuating gripping means into said recess formed by said spacing means around said tendon and against said bearing plate.
Claim 3
Dependent Claim
41 words
The method of forming a cast-in-place concrete anchorage as defined in claim 1 wherein, said inserting step is accomplished immediately prior to tensioning of said tendon, and positioning convergently actuating gripping means in said tendon anchorage prior to tensioning said tendon.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1980-10-17 | 1981-04-18 | 1981-10-18 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1984-10-17 | 1985-04-18 | 1985-10-18 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1988-10-17 | 1989-04-18 | 1989-10-18 | $7700.00 | Window Closed / Lapsed |