Patent EP0229643A2 successfully refreshed from Google Patents.
Patent US4040263A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4040263A Expired / Lapsed US ⏱️ 0.0 years remaining

Arrangement in or relating to drainage

Assignee: A S HOYER ELLEFSEN
•
Filing: 1974-10-09
•
Granted: 1977-08-09
•
Expires: 1994-10-09
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of construction on natural or artificial soils subject to liquefaction involves the provision of one or more permeable wells penetrating the soil supporting a structure, such that excess water pressures induced by cyclic loads on the structure can be relieved. Pumps can be used to maintain the water pressure in the wells lower than the natural water pressure in the surrounding soil. The wells may be filled with water-permeable material. Structures in accordance with the invention can be of various forms, wherein drainage may be through one or more dowels or through a cushion on the lower section of the structure or structures.

Inventors

  • 👤 Ove Eide
  • 👤 Carl F. Clausen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 16:19
CPC Classifications
E; E02; E02D; E02D23/00; E02D23/16

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 172 words
In a fully positioned marine gravity-type structure surrounded by the sea so as to be subject to cyclic loads from environmental forces and resting firmly on the seabed at a predetermined ultimate depth and orientation and at a location where the seabed material is of substantially uniform grain size distribution, continuously available means for counteracting liquefaction in the supporting soil beneath the structure at any desired time by relieving excess pore water pressure arising at any time from cyclic shearload in the supporting soil, said means comprising one or more permeable wells penetrating said supporting soil, a water-tight open-topped tower extending from the seabed to above the water surface, means communicating said wells with the lower portion of said tower, and continuously available means for selectively maintaining the water level inside said tower at a lower level than the water surface so as to maintain a lower hydrostatic pressure inside said wells than outside, and hence relieve excess pore water pressure occuring at any time in the supporting soil about said wells.
Claim 2
Dependent Claim 172 words
In a fully positioned marine gravity-type structure surrounded by the sea so as to be subject to cyclic loads from environmental forces and resting firmly on the seabed at a predetermined ultimate depth and orientation and at a location where the seabed material is of substantially uniform grain size distribution, continuously available means for counteracting liquefaction in the supporting soil beneath the structure at any desired time by relieving excess pore water pressure arising at any time from cyclic shearload in the supporting soil, said means comprising one or more permeable wells penetrating said supporting soil, a water-tight open-topped tower extending from the seabed to above the water surface, means communicating said wells with the lower portion of said tower, and continuously available means for selectively maintaining the water level inside said tower at a lower level than the water surface so as to maintain a lower hydrostatic pressure inside said wells than outside, and hence relieve excess pore water pressure occuring at any time in the supporting soil about said wells.
Claim 3
Dependent Claim 88 words
A method of construction on undersea soils subject to the phenomenon of liquefaction, using a marine gravity-type structure as claimed in Claim 10, comprising positioning and supporting said structure on the seabed at and in a predetermined ultimate depth and orientation such that said structure is in its ultimate operational position and orientation, and thereafter selectively varying the water level inside said tower during the post-positioning operational life of said structure to relieve excess pore water pressure occurring at any time in the supporting soil about said wells.

References Cited (Backward Citations)

US483697A Cited
US2865179A Cited
US3001370A Cited
US2895301A Cited
GB1088804A Cited
US3412563A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-08-08 1981-02-07 1981-08-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-08-08 1985-02-07 1985-08-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-08-08 1989-02-07 1989-08-09 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag