Patent US4035858A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4035858A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for the preuse work-hardening of bolts

Assignee: Individual
•
Filing: 1976-03-08
•
Granted: 1977-07-19
•
Expires: 1996-03-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for manufacturing bolts of a given grade and size in which, after forming, threading and heat treating, each bolt is work hardened by the application and subsequent removal of a tensile force of magnitude somewhat above the minimum proof load for the given grade and size of bolt, so that all bolts so treated will have the same yield point and the torque rotation curve for each bolt will have a discontinuity in slope at this common yield point.

Inventors

  • 👤 Norman C. Dahl

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 04:58
CPC Classifications
B; B21; B21K; B21K1/00; B21K1/44; Y; Y10; Y10S; Y10S411/00; Y10S411/916; Y10T; Y10T29/00; Y10T29/49; Y10T29/49826; Y10T29/49863; Y10T29/49874

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 103 words
In a method for manufacturing bolts of a given grade and size having a minimum proof load which method comprises the steps of forming blanks into bolts having heads and shanks, threading said shanks, and heat treating the formed bolts, wherein the improvement comprises work hardening each bolt by applying and subsequently removing a tensile force of uniform magnitude somewhat above the minimum proof load for the given grade and size of bolt, so that all bolts so treated will have the same yield point and the torque-rotation curve for each bolt will have a discontinuity in slope at this common yield point.
Claim 2
Dependent Claim 103 words
In a method for manufacturing bolts of a given grade and size having a minimum proof load which method comprises the steps of forming blanks into bolts having heads and shanks, threading said shanks, and heat treating the formed bolts, wherein the improvement comprises work hardening each bolt by applying and subsequently removing a tensile force of uniform magnitude somewhat above the minimum proof load for the given grade and size of bolt, so that all bolts so treated will have the same yield point and the torque-rotation curve for each bolt will have a discontinuity in slope at this common yield point.

References Cited (Backward Citations)

US2146825A Cited
US2764514A Cited
US2637672A Cited
US3877281A Cited
US3943819A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-07-18 1981-01-17 1981-07-19 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-07-18 1985-01-17 1985-07-19 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-07-18 1989-01-17 1989-07-19 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag