← Back to Patent Explorer
US4014174A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of simultaneously strengthening the surface of a borehole and bonding cement thereto and method of forming cementitious pilings

Assignee: Baroid Technology Inc
•
Filing: 1975-10-28
•
Granted: 1977-03-29
•
Expires: 1995-10-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An improved method of consolidating the surface of a borehole in an incompetent formation and simultaneously strengthening the bond between the surface of the borehole and cement placed in the borehole is achieved by forcing an aqueous solution of a multivalent cation salt into the formation, thereafter forcing an alkali metal silicate solution which has a pH less than 12.0 containing at least 12% by weight silica into the formation, and thereafter forcing an aqueous cement slurry containing at least 2% by weight of a water soluble multivalent cation salt to contact the surface of the borehole. A cementitious piling intimately bonded to the formation is prepared by filing the stabilized borehole with an aqueous cement slurry and allowing the cement to harden.

Inventors

  • 👤 Thomas C. Mondshine

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 00:51
CPC Classifications
E; E02; E02D; E02D5/00; E02D5/22; E02D5/34; E02D5/36; E02D5/38; E02D5/40; E02D5/62

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 134 words
A method for simultaneously consolidating the surface of a borehole and bonding cement to the surface of said borehole, which comprises: a. placing an aqueous salt solution containing at least 0.5% of a multivalent cation salt into a borehole; b. forcing said salt solution into the formation surrounding said borehole; c. displacing said salt solution from said borehole; d. placing an alkali metal silicate solution which has a pH less than 12.0 containing at least 12 percent by weight silica within said borehole; e. forcing said silicate solution into said formation; f. displacing said silicate solution from said borehole; g. placing an aqueous cement slurry containing at least 2 percent by weight of a water soluble multivalent cation salt within said borehole; and h. forcing said cement to contact said surface of said borehole.
Claim 2
Independent Claim 134 words
A method for simultaneously consolidating the surface of a borehole and bonding cement to the surface of said borehole, which comprises: a. placing an aqueous salt solution containing at least 0.5% of a multivalent cation salt into a borehole; b. forcing said salt solution into the formation surrounding said borehole; c. displacing said salt solution from said borehole; d. placing an alkali metal silicate solution which has a pH less than 12.0 containing at least 12 percent by weight silica within said borehole; e. forcing said silicate solution into said formation; f. displacing said silicate solution from said borehole; g. placing an aqueous cement slurry containing at least 2 percent by weight of a water soluble multivalent cation salt within said borehole; and h. forcing said cement to contact said surface of said borehole.
Claim 3
Dependent Claim 32 words
The method of claim 1 wherein said salt solution is seawater, and wherein said alkali metal is sodium, and wherein said water soluble multivalent cation salt in said cement is calcium chloride.
Claim 4
Dependent Claim 16 words
The method of claim 2 wherein said silicate solution has a pH less than about 11.5.
Claim 5
Dependent Claim 16 words
The method of claim 3 wherein said cement contains at least 4% by weight calcium chloride.
Claim 6
Dependent Claim 22 words
The method of claim 4 wherein the stabilized borehole is filled with a cement slurry to form a piling in said formation.
Claim 7
Dependent Claim 22 words
The method of claim 2 wherein the stabilized borehole is filled with a cement slurry to form a piling in said formation.
Claim 8
Dependent Claim 24 words
The method of claim 6 wherein said cement slurry which contacts the surface of said borehole contains at least 4% by weight calcium chloride.
Claim 9
Dependent Claim 22 words
The method of claim 1 wherein the stabilized borehole is filled with a cement slurry to form a piling in said formation.
Claim 10
Dependent Claim 16 words
The method of claim 8 wherein said silicate solution has a pH less than about 11.5.
Claim 11
Independent Claim 140 words
A method for simultaneously consolidating the surface of a borehole and bonding cement to the surface of said borehole, wherein said borehole is within an incompetent formation beneath a body of seawater, and for forming a piling within said borehole, which comprises: a. placing an alkali metal silicate solution which has a pH less than 12.0 containing at least 12 percent by weight silica within said borehole; b. forcing said silicate solution into said formation; c. displacing said silicate solution from said borehole; d. placing an aqueous cement slurry containing at least 2% by weight of a water soluble multivalent cation salt within said borehole; e. forcing said cement to contact said surface of said borehole; and f. allowing said cement slurry to harden; wherein said borehole is filled with a cement slurry to form a piling in said formation.
Claim 12
Independent Claim 140 words
A method for simultaneously consolidating the surface of a borehole and bonding cement to the surface of said borehole, wherein said borehole is within an incompetent formation beneath a body of seawater, and for forming a piling within said borehole, which comprises: a. placing an alkali metal silicate solution which has a pH less than 12.0 containing at least 12 percent by weight silica within said borehole; b. forcing said silicate solution into said formation; c. displacing said silicate solution from said borehole; d. placing an aqueous cement slurry containing at least 2% by weight of a water soluble multivalent cation salt within said borehole; e. forcing said cement to contact said surface of said borehole; and f. allowing said cement slurry to harden; wherein said borehole is filled with a cement slurry to form a piling in said formation.

References Cited (Backward Citations)

US3884302A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-03-28 1980-09-27 1981-03-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-03-28 1984-09-27 1985-03-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-03-28 1988-09-27 1989-03-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag