Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
134 words
A method for simultaneously consolidating the surface of a borehole and bonding cement to the surface of said borehole, which comprises: a. placing an aqueous salt solution containing at least 0.5% of a multivalent cation salt into a borehole; b. forcing said salt solution into the formation surrounding said borehole; c. displacing said salt solution from said borehole; d. placing an alkali metal silicate solution which has a pH less than 12.0 containing at least 12 percent by weight silica within said borehole; e. forcing said silicate solution into said formation; f. displacing said silicate solution from said borehole; g. placing an aqueous cement slurry containing at least 2 percent by weight of a water soluble multivalent cation salt within said borehole; and h. forcing said cement to contact said surface of said borehole.
Claim 2
Independent Claim
134 words
A method for simultaneously consolidating the surface of a borehole and bonding cement to the surface of said borehole, which comprises: a. placing an aqueous salt solution containing at least 0.5% of a multivalent cation salt into a borehole; b. forcing said salt solution into the formation surrounding said borehole; c. displacing said salt solution from said borehole; d. placing an alkali metal silicate solution which has a pH less than 12.0 containing at least 12 percent by weight silica within said borehole; e. forcing said silicate solution into said formation; f. displacing said silicate solution from said borehole; g. placing an aqueous cement slurry containing at least 2 percent by weight of a water soluble multivalent cation salt within said borehole; and h. forcing said cement to contact said surface of said borehole.
Claim 3
Dependent Claim
32 words
The method of claim 1 wherein said salt solution is seawater, and wherein said alkali metal is sodium, and wherein said water soluble multivalent cation salt in said cement is calcium chloride.
Claim 4
Dependent Claim
16 words
The method of claim 2 wherein said silicate solution has a pH less than about 11.5.
Claim 5
Dependent Claim
16 words
The method of claim 3 wherein said cement contains at least 4% by weight calcium chloride.
Claim 6
Dependent Claim
22 words
The method of claim 4 wherein the stabilized borehole is filled with a cement slurry to form a piling in said formation.
Claim 7
Dependent Claim
22 words
The method of claim 2 wherein the stabilized borehole is filled with a cement slurry to form a piling in said formation.
Claim 8
Dependent Claim
24 words
The method of claim 6 wherein said cement slurry which contacts the surface of said borehole contains at least 4% by weight calcium chloride.
Claim 9
Dependent Claim
22 words
The method of claim 1 wherein the stabilized borehole is filled with a cement slurry to form a piling in said formation.
Claim 10
Dependent Claim
16 words
The method of claim 8 wherein said silicate solution has a pH less than about 11.5.
Claim 11
Independent Claim
140 words
A method for simultaneously consolidating the surface of a borehole and bonding cement to the surface of said borehole, wherein said borehole is within an incompetent formation beneath a body of seawater, and for forming a piling within said borehole, which comprises: a. placing an alkali metal silicate solution which has a pH less than 12.0 containing at least 12 percent by weight silica within said borehole; b. forcing said silicate solution into said formation; c. displacing said silicate solution from said borehole; d. placing an aqueous cement slurry containing at least 2% by weight of a water soluble multivalent cation salt within said borehole; e. forcing said cement to contact said surface of said borehole; and f. allowing said cement slurry to harden; wherein said borehole is filled with a cement slurry to form a piling in said formation.
Claim 12
Independent Claim
140 words
A method for simultaneously consolidating the surface of a borehole and bonding cement to the surface of said borehole, wherein said borehole is within an incompetent formation beneath a body of seawater, and for forming a piling within said borehole, which comprises: a. placing an alkali metal silicate solution which has a pH less than 12.0 containing at least 12 percent by weight silica within said borehole; b. forcing said silicate solution into said formation; c. displacing said silicate solution from said borehole; d. placing an aqueous cement slurry containing at least 2% by weight of a water soluble multivalent cation salt within said borehole; e. forcing said cement to contact said surface of said borehole; and f. allowing said cement slurry to harden; wherein said borehole is filled with a cement slurry to form a piling in said formation.