← Back to Patent Explorer
US3884302A Expired / Lapsed US ⏱️ 0.0 years remaining

Well cementing process

Assignee: Mobil Oil AS
•
Filing: 1974-05-29
•
Granted: 1975-05-20
•
Expires: 1994-05-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract This specification discloses a method of cementing casing in a well having a drilling mud therein. An alkaline flush having a pH of at least 10 is flowed through the annular space between the casing positioned in the well and the wall of the well. Thereafter, an aqueous base preflush having a characteristic of forming a viscous film at the interface between the preflush and an alkaline solution is flowed through the annular space to displace the alkaline flush and drilling mud therefrom. Thereafter a cement slurry, itself alkaline, is flowed into the annular space to displace the preflush and is allowed to set to bond the casing to the wall of the well.

Inventors

  • 👤 Joseph U Messenger

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 05:46
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/42

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 135 words
A method of cementing casing in a well having a drilling mud therein, comprising the steps of: a. flowing an aqueous alkaline wash having a pH of at least 10 into the annulus formed between said casing and the wall of the well; b. flowing an aqueous preflush into said annulus and in contact with said aqueous alkaline wash to displace said aqueous alkaline wash up said annulus, said aqueous preflush having a characteristic of forming a viscous film upon contact with a fluid having a pH of at least 10; c. flowing a cement slurry into said annulus and in contact with said aqueous preflush to displace said aqueous preflush up said annulus; and d. allowing said cement slurry to set in said annulus and bond said casing to said wall of the well.
Claim 2
Independent Claim 135 words
A method of cementing casing in a well having a drilling mud therein, comprising the steps of: a. flowing an aqueous alkaline wash having a pH of at least 10 into the annulus formed between said casing and the wall of the well; b. flowing an aqueous preflush into said annulus and in contact with said aqueous alkaline wash to displace said aqueous alkaline wash up said annulus, said aqueous preflush having a characteristic of forming a viscous film upon contact with a fluid having a pH of at least 10; c. flowing a cement slurry into said annulus and in contact with said aqueous preflush to displace said aqueous preflush up said annulus; and d. allowing said cement slurry to set in said annulus and bond said casing to said wall of the well.
Claim 3
Dependent Claim 30 words
The method of claim 1 wherein said aqueous alkaline wash is comprised of an aqueous solution of an alkali selected from the group consisting of sodium hydroxide or sodium carbonate.
Claim 4
Dependent Claim 23 words
The method of claim 2 wherein said aqueous alkaline wash is flowed into said well in an amount of at least 5 barrels.
Claim 5
Dependent Claim 22 words
The method of claim 2 wherein said aqueous preflush is comprised of water, a polysaccharide, and a cross-linking agent for the polysaccharide.
Claim 6
Dependent Claim 135 words
In a method of cementing casing in a well penetrating a subterranean formation wherein a cement slurry is flowed into the annulus formed intermediate the casing and the wall of the well and is allowed to set and bond the casing to the wall of the well, said well having a drilling mud therein, the improvement comprising: a. flowing in turbulent flow into said annulus an aqueous alkaline wash having a pH of at least 10; b. flowing in plug flow into said annulus and in contact with said aqueous alkaline wash an aqueous preflush that has a characteristic of forming a viscous film upon contact with a fluid having a pH of at least 10; and c. flowing in plug flow into said annulus and in contact with said aqueous preflush and cement slurry.
Claim 7
Dependent Claim 135 words
In a method of cementing casing in a well penetrating a subterranean formation wherein a cement slurry is flowed into the annulus formed intermediate the casing and the wall of the well and is allowed to set and bond the casing to the wall of the well, said well having a drilling mud therein, the improvement comprising: a. flowing in turbulent flow into said annulus an aqueous alkaline wash having a pH of at least 10; b. flowing in plug flow into said annulus and in contact with said aqueous alkaline wash an aqueous preflush that has a characteristic of forming a viscous film upon contact with a fluid having a pH of at least 10; and c. flowing in plug flow into said annulus and in contact with said aqueous preflush and cement slurry.
Claim 8
Independent Claim 145 words
A method of cementing casing in a well having an oil base drilling mud therein, comprising the steps of: a. flowing a light oil wash into the annulus formed between said casing and the wall of said well; b. flowing an aqueous alkaline wash having a pH of at least 10 into said annulus; c. flowing an aqueous prefLush into said annulus and in contact with said aqueous alkaline wash to displace said aqueous alkaline wash up said annulus, said aqueous preflush having a characteristic of forming a viscous film upon contact with a fluid having a pH of at least 10; d. flowing a cement slurry into said annulus in contact with said aqueous preflush to displace said aqueous preflush up said annulus; and e. allowing said cement slurry to set in said annulus and bond said casing to said wall of the well.
Claim 9
Independent Claim 145 words
A method of cementing casing in a well having an oil base drilling mud therein, comprising the steps of: a. flowing a light oil wash into the annulus formed between said casing and the wall of said well; b. flowing an aqueous alkaline wash having a pH of at least 10 into said annulus; c. flowing an aqueous prefLush into said annulus and in contact with said aqueous alkaline wash to displace said aqueous alkaline wash up said annulus, said aqueous preflush having a characteristic of forming a viscous film upon contact with a fluid having a pH of at least 10; d. flowing a cement slurry into said annulus in contact with said aqueous preflush to displace said aqueous preflush up said annulus; and e. allowing said cement slurry to set in said annulus and bond said casing to said wall of the well.

References Cited (Backward Citations)

US2848051A Cited
US3291211A Cited
US3299952A Cited
US3348612A Cited
US3411580A Cited
US3625286A Cited
US3688845A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1978-05-19 1978-11-18 1979-05-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1982-05-19 1982-11-18 1983-05-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1986-05-19 1986-11-18 1987-05-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag