Claims Analysis
Total Claims: 5
Claim 1
Independent Claim
128 words
A tension leg marine platform comprising a buoyancy chamber, a plurality of anchoring arrangements secured to the sea bed, a plurality of tension legs, each tension leg extending between a corresponding one of the anchoring arrangements and the buoyancy chamber to hold the buoyancy chamber submerged below the level of the sea, a platform, and means supporting the platform on the buoyancy chamber but above the level of the sea, each anchoring arrangement for each leg comprising a pile driven into the sea bed, an air filled working chamber mounted on the pile and defining an orifice through which a said leg can extend into the chamber, and clamping means secured to the chamber and housed within the chamber, the clamping means clamping the leg to the pile.
Claim 2
Dependent Claim
128 words
A tension leg marine platform comprising a buoyancy chamber, a plurality of anchoring arrangements secured to the sea bed, a plurality of tension legs, each tension leg extending between a corresponding one of the anchoring arrangements and the buoyancy chamber to hold the buoyancy chamber submerged below the level of the sea, a platform, and means supporting the platform on the buoyancy chamber but above the level of the sea, each anchoring arrangement for each leg comprising a pile driven into the sea bed, an air filled working chamber mounted on the pile and defining an orifice through which a said leg can extend into the chamber, and clamping means secured to the chamber and housed within the chamber, the clamping means clamping the leg to the pile.
Claim 3
Dependent Claim
22 words
A platform according to claim 1, wherein the chamber includes an airlock to allow access to the chamber from a submersible craft.
Claim 4
Dependent Claim
165 words
A tension leg marine platform structure comprising an air filled buoyancy chamber having an airlock, the airlock enabling access between the buoyancy chamber and a submersible craft when docked at the airlock, a deck, a plurality of columns supporting the deck on the chamber to lie above the level of the sea and providing access from the deck to the chamber, a plurality of tension legs each secured at one end to the buoyancy chamber, and a plurality of anchoring arrangements respectively for anchoring the other ends of the tension legs to the sea bed to hold the buoyancy chamber in a submerged state, each anchoring arrangement comprising a pile driven into the sea bed, an air filled working chamber mounted on the pile, and clamping means for clamping a corresponding one of the said tension legs to the pile inside the working chamber, each working chamber having an airlock enabling access between the submersible craft when docked at the airlock and the working chamber.
Claim 5
Dependent Claim
165 words
A tension leg marine platform structure comprising an air filled buoyancy chamber having an airlock, the airlock enabling access between the buoyancy chamber and a submersible craft when docked at the airlock, a deck, a plurality of columns supporting the deck on the chamber to lie above the level of the sea and providing access from the deck to the chamber, a plurality of tension legs each secured at one end to the buoyancy chamber, and a plurality of anchoring arrangements respectively for anchoring the other ends of the tension legs to the sea bed to hold the buoyancy chamber in a submerged state, each anchoring arrangement comprising a pile driven into the sea bed, an air filled working chamber mounted on the pile, and clamping means for clamping a corresponding one of the said tension legs to the pile inside the working chamber, each working chamber having an airlock enabling access between the submersible craft when docked at the airlock and the working chamber.