Patent US3986557A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3986557A Expired / Lapsed US ⏱️ 0.0 years remaining

Production of bitumen from tar sands

Assignee: Atlantic Richfield Co
•
Filing: 1975-06-06
•
Granted: 1976-10-19
•
Expires: 1995-06-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of producing bitumen from a subterranean tar sand formation characterized by the following muti-step process. First, a continuous wellbore having a second section thereof contained within the formation and a first and a third section extending said second section to the earth's surface is formed. Next, a perforated liner is inserted into the wellbore extending the entire length thereof and having perforations so positioned thereon to be adjacent the second section of the wellbore. Thereafter, a heated fluid is circulated through the wellbore, contacting the formation via the perforations, thereby reducing the viscosity of the bitumen contained therein rendering it mobile. Subsequently, the mobilized bitumen is recovered via the wellbore.

Inventors

  • 👤 John Howard Striegler
  • 👤 Eddie Paul Howell

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 19:36
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/30; E21B43/305; E21B43/16; E21B43/24

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 142 words
Method for recovering bitumen from a subterranean tar sand formation containing viscous bitumen which comprises: drilling with a drill pipe and bit a continuous wellbore having a second section contained within said formation and a first and third section extending said second section to the earth's surface; inserting a perforated liner within said wellbore by removing said drill bit, positioning said liner inside said drill pipe, removing said drill pipe leaving said liner in position, and extending the entire length of said wellbore and said perforations located in the portion adjacent said second section of said wellbore providing fluid communication with said formation, circulating a heated fluid through said wellbore contacting said formation via said first section and thereby reducing the viscosity of said bitumen contained therein rendering same mobile; and recovering said mobilized bitumen via said third section of said wellbore.
Claim 2
Dependent Claim 142 words
Method for recovering bitumen from a subterranean tar sand formation containing viscous bitumen which comprises: drilling with a drill pipe and bit a continuous wellbore having a second section contained within said formation and a first and third section extending said second section to the earth's surface; inserting a perforated liner within said wellbore by removing said drill bit, positioning said liner inside said drill pipe, removing said drill pipe leaving said liner in position, and extending the entire length of said wellbore and said perforations located in the portion adjacent said second section of said wellbore providing fluid communication with said formation, circulating a heated fluid through said wellbore contacting said formation via said first section and thereby reducing the viscosity of said bitumen contained therein rendering same mobile; and recovering said mobilized bitumen via said third section of said wellbore.

References Cited (Backward Citations)

US2271005A Cited
US2584605A Cited
US2778603A Cited
US2974937A Cited
US3285350A Cited
US3338306A Cited
US3386508A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-10-19 1980-04-19 1980-10-19 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-10-19 1984-04-19 1984-10-19 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-10-19 1988-04-19 1988-10-19 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag