Patent US3979092A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3979092A Expired / Lapsed US ⏱️ 0.0 years remaining

Sequential occupancy release control method and apparatus for train vehicles

Assignee: Bombardier Transportation Holdings USA Inc
•
Filing: 1975-03-03
•
Granted: 1976-09-07
•
Expires: 1995-03-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An improved train vehicle speed control system is provided for operation in conjunction with train speed control signals and train occupancy indication signals in relation to a train vehicle track system including a plurality of predetermined track circuit signal blocks through which train vehicles pass. It is desired that a control of train vehicle speed be provided in relation to the detected occupancy by a train vehicle of a particular signal block, for maintaining train vehicle occupancy protection requirements and providing desired sequential occupancy control of the train vehicles through each of successive signal blocks through operation of provided protection signals with selected signal blocks behind the detected train vehicle. Spurious pseudo vehicle occupancy in a given signal block is detected and included in the provided train speed control in relation to that given signal block.

Inventors

  • 👤 Robert H. Perry
  • 👤 David H. Woods

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 20:51
CPC Classifications
B; B61; B61L; B61L21/00; B61L21/10; B61L3/00; B61L3/02; B61L3/08

Claims Analysis

Total Claims: 31
Claim 1
Independent Claim 105 words
In apparatus for controlling the speed of a plurality of train vehicles along a track including a plurality of signal blocks, the combination of means for providing an occupancy indication signal in relation to the sensed occupancy of a first signal block by one of said train vehicles, means for providing a first protection signal in response to said occupancy indication signal, and means for providing an occupancy control signal in response to the provision of said occupancy indication signal and in response to said first protection signal to determine a zero speed code for a second signal block previous to said first signal block.
Claim 2
Dependent Claim 105 words
In apparatus for controlling the speed of a plurality of train vehicles along a track including a plurality of signal blocks, the combination of means for providing an occupancy indication signal in relation to the sensed occupancy of a first signal block by one of said train vehicles, means for providing a first protection signal in response to said occupancy indication signal, and means for providing an occupancy control signal in response to the provision of said occupancy indication signal and in response to said first protection signal to determine a zero speed code for a second signal block previous to said first signal block.
Claim 3
Dependent Claim 27 words
The apparatus of claim 1, with said occupancy control signal being operative to control the speed of another train vehicle in relation to said second signal block.
Claim 4
Dependent Claim 42 words
The apparatus of claim 1, with said first signal block being signal block N, with said second signal block being signal block N-1, and with said first protection signal being operative to determine the speed code supplied to second signal block N-1.
Claim 5
Dependent Claim 37 words
The apparatus of claim 1, with said first protection signal being operative with said second signal block for protecting said first vehicle in relation to the movement of said second train vehicle in said second signal block.
Claim 6
Dependent Claim 34 words
The apparatus of claim 1, with said first protection signal being operative with a third signal block previous to said second signal block to determine a vehicle speed code for said third signal block.
Claim 7
Dependent Claim 44 words
The apparatus of claim 1 operative with a source of a forward direction signal, with said first protection signal being provided in response to said occupancy indication signal and said forward direction signal when said one train vehicle begins to move along said track.
Claim 8
Dependent Claim 101 words
The apparatus of claim 1 operative with a source of a forward direction signal, and including means for providing at least a second occupancy indication signal in relation to the sensed occupancy by said one train vehicle of an additional signal block ahead of said first signal block, means for providing a second protection signal in response to said second occupancy indication signal and said first protection signal, and means for providing a pseudo occupancy signal in relation to said additional signal block in response to said second occupancy indication signal in relation to the provision of said first protection signal.
Claim 9
Dependent Claim 41 words
The apparatus of claim 1, with said first protection signal being set in response to said occupancy indication signal, and with said first protection signal being reset in relation to a predetermined maximum length of a train of said train vehicles.
Claim 10
Dependent Claim 40 words
The apparatus of claim 8, with the reset of said first protection signal in relation to said second signal block being established in a predetermined sequential relationship with the reset of protection signals for other signal blocks of said track.
Claim 11
Dependent Claim 37 words
The apparatus of claim 1 operative with a source of a door open control signal, and including means for providing a secondary protection signal in response to said occupancy indication signal and said door open control signal.
Claim 12
Dependent Claim 58 words
The apparatus of claim 1 operative with a source of a door open control signal when said one train vehicle is positioned within a station platform signal block, and including means for providing a secondary protection signal in relation to said station platform signal block in response to said occupancy indication signal and said door open control signal.
Claim 13
Dependent Claim 73 words
The apparatus of claim 1 operative with a source of a turnback signal in relation to said first signal block being a turnback signal block of said track, and including means for providing a secondary protection signal in relation to said first signal block in response to said occupancy indication signal and said turnback signal, and means for resetting said first protection signal in response to the provision of said secondary protection signal.
Claim 14
Dependent Claim 34 words
The apparatus of claim 12, with said secondary protection signal providing means being responsive to a predetermined time delay in accordance with the movement of said one train vehicle into said first signal block.
Claim 15
Dependent Claim 48 words
The apparatus of claim 1 operative with a source of a direction signal and with said first signal block being a transfer zone signal block, with said means for providing a first protection signal being responsive to said direction signal and in relation to said first signal block.
Claim 16
Dependent Claim 79 words
The apparatus of claim 1 operative with a source of a direction signal and with said first signal block being a transfer zone signal block, and including means for providing a secondary protection signal in response to said direction signal and said occupancy indication signal and in accordance with the occupancy of a predetermined number of previous signal blocks of said track, and means for resetting said secondary protection signal when said occupancy indication signal is no longer provided.
Claim 17
Dependent Claim 71 words
The apparatus of claim 1 with said first signal block being in a main track including a switch and being located in relation to a merge side track and operative with switch control apparatus, and including means operative with said switch control apparatus and responsive to said occupancy control signal for determining the operation of said switch with said main track for as long as said occupancy control signal is provided.
Claim 18
Dependent Claim 97 words
The apparatus of claim 16, with said occupancy control signal O N being determined by the relationship O.sub.N = I.sub.n or Q.sub.N or Q.sub.N.sub.-1 where O N is related to the occupancy of first signal block N by said one train vehicle, where I N is said occupancy indication signal for first signal block N, where Q N -1 is said first protection signal provided in relation to second signal block N-1 previous to said first signal block N, and where Q N is a second protection signal provided in relation to said first signal block N.
Claim 19
Dependent Claim 112 words
In the method of controlling the movement of a second train vehicle following a first train vehicle along a track including a plurality of signal blocks, the steps of providing at least an initial occupancy indication signal in relation to the occupancy of a first signal block by said first train vehicle, providing a predetermined protection signal in relation to said first train vehicle in response to said initial occupancy indication signal, and controlling the movement of said second train vehicle in relation to a second signal block previous to said first signal block in response to the provision of said occupancy indication signal and in response to said predetermined protection signal.
Claim 20
Dependent Claim 112 words
In the method of controlling the movement of a second train vehicle following a first train vehicle along a track including a plurality of signal blocks, the steps of providing at least an initial occupancy indication signal in relation to the occupancy of a first signal block by said first train vehicle, providing a predetermined protection signal in relation to said first train vehicle in response to said initial occupancy indication signal, and controlling the movement of said second train vehicle in relation to a second signal block previous to said first signal block in response to the provision of said occupancy indication signal and in response to said predetermined protection signal.
Claim 21
Dependent Claim 51 words
The method of claim 18, including the step of providing an occupancy control signal in accordance with the provision of said occupancy indication signal and said predetermined protection signal for controlling the movement of said second train vehicle by determining a zero speed code in relation to said second signal block.
Claim 22
Dependent Claim 48 words
The method of claim 18 with said predetermined protection signal continuing to be provided regardless of the provision of said occupancy indication signal, and with said movement of said second train vehicle being controlled in relation to said second signal block in response to said predetermined protection signal.
Claim 23
Independent Claim 136 words
The apparatus for controlling the movement of at least one train vehicle operative with a track including a plurality of signal blocks, the combination of means for supplying a speed code to a first signal block, means for receiving said speed code from said first signal block, means operative with said supplying means and with said receiving means for providing an occupancy indication signal in relation to the occupancy of said first signal block by said one train vehicle, means responsive to said occupancy indication signal for providing a protection signal, and means responsive to said occupancy indication signal and said protection signal for providing an occupancy control signal to determine the speed code supplied to a second signal block previous to said first signal block in relation to the movement of said one train vehicle.
Claim 24
Independent Claim 136 words
The apparatus for controlling the movement of at least one train vehicle operative with a track including a plurality of signal blocks, the combination of means for supplying a speed code to a first signal block, means for receiving said speed code from said first signal block, means operative with said supplying means and with said receiving means for providing an occupancy indication signal in relation to the occupancy of said first signal block by said one train vehicle, means responsive to said occupancy indication signal for providing a protection signal, and means responsive to said occupancy indication signal and said protection signal for providing an occupancy control signal to determine the speed code supplied to a second signal block previous to said first signal block in relation to the movement of said one train vehicle.
Claim 25
Dependent Claim 27 words
The apparatus of claim 21, with said first signal block being signal block N and with said second signal block being the next previous signal block N-1.
Claim 26
Dependent Claim 66 words
The apparatus of claim 21, with said occupancy indication signal being occupancy indication signal I N in relation to first signal block N, with said protection signal being protection signal Q N -1 in relation to the previous second signal block N-1, and with said occupancy control signal being occupancy control signal O N operative to determine the speed code supplied to second signal block N-1.
Claim 27
Dependent Claim 46 words
The apparatus of claim 21, including means responsive to said protection signal for providing a second occupancy control signal to determine the speed code supplied to a third signal block previous to said second signal block in relation to the movement of said one train vehicle.
Claim 28
Dependent Claim 67 words
The apparatus of claim 21, with said first signal block being signal block N, with said second signal block being signal block N-1, and including means responsive to said protection signal for providing a second occupancy control signal to determine the speed code supplied to a third signal block N-2 previous to said second signal block N-1 in relation to the movement of said one train vehicle.
Claim 29
Dependent Claim 71 words
The apparatus of claim 21, with said occupancy control signal being provided by the relationship O.sub.N = I.sub.N + Q.sub.N + Q.sub.N.sub.-1 where O N is said occupancy control signal, where I N is said occupancy indication signal, where Q N -1 is said protection signal provided in response to said occupancy indication signal, and where Q N is another protection signal provided in relation to said first signal block N.
Claim 30
Dependent Claim 34 words
The apparatus of claim 21, including means for providing a second protection signal in response to the occupancy of an additional signal block by a second train vehicle ahead of said one train vehicle.
Claim 31
Dependent Claim 76 words
The apparatus of claim 27, with said occupancy control signal being provided by the logic relationship set O N equal to I N or Q N or Q N -1 , where O N is provided when set as said occupancy control signal, where I N is said occupancy indication signal, where Q N is said second protection signal and where Q N -1 is said protection signal provided in response to said occupancy indication signal.

References Cited (Backward Citations)

US3251990A Cited
US3886515A Cited
US3887152A Cited
US3891167A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-09-07 1980-03-08 1980-09-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-09-07 1984-03-08 1984-09-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-09-07 1988-03-08 1988-09-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag