Patent US3975189A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3975189A Expired / Lapsed US ⏱️ 0.0 years remaining

Recovery of copper sulphide and nickel from solution

Assignee: Glencore Canada Corp
•
Filing: 1974-06-24
•
Granted: 1976-08-17
•
Expires: 1994-06-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for selectively recovering metals from generally sulphidic particulate materials containing metals selected from nickel, copper and precious metals in which the particulate material is preferentially leached in an agitated chloride solution containing cuprous ions by the action of chlorine. The redox potential of the solution increases upon feeding chlorine thereto and decreases upon feeding particulate material thereto, and the rate of feeding of chlorine is controlled relative to the rate of feeding of material to control the redox potential substantially at or below a selected potential at which the metal is leached preferentially with respect to other metals in the material. Nickel is leached preferentially with respect to copper and precious metals in a matte, for example, to produce a nickel-rich solution and to concentrate the precious metals in a nickel-depleted residue. The leach residue, or other concentrates containing copper and precious metals may also be treated by the method to selectively dissolve the copper values preferentially to the precious metal values. Dissolved copper in the nickel-bearing leach solutions may be precipitated in a separate tank by agitating the leach solution in the presence of elemental sulphur and nickel sulphide particles having an atomic ratio of nickel to sulphur greater than one, thereby producing copper sulphide and a substantially copper-free nickel-chloride solution which can be separated and the values recovered by conventional means.

Inventors

  • 👤 Leif R. Haugen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 10:20
CPC Classifications
C; C22; C22B; C22B23/00; C22B23/04; C22B23/0407; C22B23/0415; C22B23/0423; C01; C01G; C01G3/00; C01G3/12; C01G51/00; C01G51/15; C01G53/00; C01G53/11; C22B11/00; C22B11/04; C22B15/00; C22B15/0063; C22B15/0084; C22B15/0089; C22B15/0093; C22B3/00; C22B3/04; C22B3/06; C01P; C01P2006/00; C01P2006/80; Y; Y02; Y02P; Y02P10/00; Y02P10/20

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 116 words
Process for the recovery and separation of copper sulphide and nickel from aqueous nickeliferous solution containing dissolved copper comprising, i. feeding nickel sulphide having an atomic ratio of nickel to sulphur greater than one to the nickeliferous solution thereby establishing a selected redox potential in the range of 30-250 mV and forming an agitated slurry thereof, ii. reacting the nickel sulphide with dissolved copper in the solution in the presence of elemental sulphur at said selected redox potential, thereby precipitating copper sulphide and dissolving nickel in the nickeliferous solution, iii. withdrawing copper sulphide and copper-depleted solution from the slurry, iv. separating the copper sulphide from the copper-depleted solution, and v. recovering nickel from the copper-depleted solution.
Claim 2
Dependent Claim 116 words
Process for the recovery and separation of copper sulphide and nickel from aqueous nickeliferous solution containing dissolved copper comprising, i. feeding nickel sulphide having an atomic ratio of nickel to sulphur greater than one to the nickeliferous solution thereby establishing a selected redox potential in the range of 30-250 mV and forming an agitated slurry thereof, ii. reacting the nickel sulphide with dissolved copper in the solution in the presence of elemental sulphur at said selected redox potential, thereby precipitating copper sulphide and dissolving nickel in the nickeliferous solution, iii. withdrawing copper sulphide and copper-depleted solution from the slurry, iv. separating the copper sulphide from the copper-depleted solution, and v. recovering nickel from the copper-depleted solution.
Claim 3
Dependent Claim 21 words
Process according to claim 1 in which the solution is selected from the group consisting of chloride solutions and sulphate solutions.
Claim 4
Dependent Claim 29 words
Process according to claim 1 in which elemental sulphur is selected from the group consisting of sulphur flowers and sulpher-bearing particles resulting from the chlorine leaching of metal sulphides.
Claim 5
Dependent Claim 19 words
Process according to claim 1 in which the nickel sulphide is Ni 3 S 2 in a nickeliferous matte.
Claim 6
Dependent Claim 70 words
Process according to claim 1 in which the nickeliferous solution is a chloride solution resulting from chlorine leaching of nickeliferous matte, the elemental sulphur is sulphur-bearing particles resulting from the chlorine leach, the nickel sulphide is Ni 3 S 2 in nickeliferous matte, and the feed rate of nickeliferous matte to the slurry is controlled to establish said selected redox potential and thereby a selected residual copper concentration is solution.

References Cited (Backward Citations)

US940292A Cited
US1671004A Cited
US2352096A Cited
US2693405A Cited
US3218161A Cited
US3741752A Cited
US3880653A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-08-17 1980-02-16 1980-08-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-08-17 1984-02-16 1984-08-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-08-17 1988-02-16 1988-08-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag