Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
120 words
In the method of producing metallic silver and elemental sulfur from a mineral material comprising silver sulfide, the improvement comprising: roasting said material under substantially non-oxidizing conditions at an elevated temperature of about 525°-900°C. for a time equivalent to about 1.5 hours at about 550°-600°C. to produce a roasted product; first leaching said roasted product in an aqueous water soluble ferric salt solution containing ferric ions to produce the corresponding solid silver salt and elemental sulfur; subjecting said solid silver salt to a second leach with aqueous sodium chloride brine solution to produce the corresponding soluble silver chloride dissolved in the solution and a solid residue comprising said elemental sulfur; and separating said dissolved silver salt from said elemental sulfur.
Claim 2
Dependent Claim
120 words
In the method of producing metallic silver and elemental sulfur from a mineral material comprising silver sulfide, the improvement comprising: roasting said material under substantially non-oxidizing conditions at an elevated temperature of about 525°-900°C. for a time equivalent to about 1.5 hours at about 550°-600°C. to produce a roasted product; first leaching said roasted product in an aqueous water soluble ferric salt solution containing ferric ions to produce the corresponding solid silver salt and elemental sulfur; subjecting said solid silver salt to a second leach with aqueous sodium chloride brine solution to produce the corresponding soluble silver chloride dissolved in the solution and a solid residue comprising said elemental sulfur; and separating said dissolved silver salt from said elemental sulfur.
Claim 3
Dependent Claim
46 words
The method of claim 1 wherein said solid silver salt and elemental sulfur are separated from the liquid from the ferric salt leaching and this liquid is directed to the first leach and combined with added chlorine to regenerate ferric leaching solution in said first leaching.
Claim 4
Independent Claim
145 words
The method of producing lead and silver from minerals including a mixture of lead and silver sulfides, comprising: roasting said minerals under substantially mon-oxidizing conditions at an elevated temperature of about 525°-900°C. for a time equivalent to about 1.5 hours at about 550°-600°C. to produce a roasted mineral product; first leaching said product in an aqueous water soluble ferric salt solution containing ferric ions to convert said sulfides to the corresponding salts of said lead and silver; second leaching the solid residue from this first leaching with aqueous sodium chloride brine solution to dissolve said salts and produce a lead and silver salts solution and a further solid residue; separating and discarding said further solid residue; cooling the said salt solution to crystallize and thereby separate said lead salts; removing the lead salt crystals from the remaining silver salt solution; and generating metallic silver therefrom.
Claim 5
Independent Claim
145 words
The method of producing lead and silver from minerals including a mixture of lead and silver sulfides, comprising: roasting said minerals under substantially mon-oxidizing conditions at an elevated temperature of about 525°-900°C. for a time equivalent to about 1.5 hours at about 550°-600°C. to produce a roasted mineral product; first leaching said product in an aqueous water soluble ferric salt solution containing ferric ions to convert said sulfides to the corresponding salts of said lead and silver; second leaching the solid residue from this first leaching with aqueous sodium chloride brine solution to dissolve said salts and produce a lead and silver salts solution and a further solid residue; separating and discarding said further solid residue; cooling the said salt solution to crystallize and thereby separate said lead salts; removing the lead salt crystals from the remaining silver salt solution; and generating metallic silver therefrom.
Claim 6
Dependent Claim
23 words
The method of claim 3 wherein said aqueous ferric salt solution contains about 10-225 grams per liter of ferric ions as ferric chloride.
Claim 7
Dependent Claim
33 words
The method of claim 3 wherein said first leaching is at about 25°-100°C. and for about 1/2-4 hours to convert said insoluble metal sulfides to the insoluble salts corresponding to said ferric salt.
Claim 8
Dependent Claim
13 words
The method of claim 3 wherein said first leaching solution comprises ferric chloride.
Claim 9
Dependent Claim
39 words
The method of claim 3 wherein said lead and silver sulfides present are reacted with sufficient ferric ions to produce the lead and silver salts corresponding to the ferric salts that supply said ferric ions together with free sulfur.
Claim 10
Dependent Claim
47 words
The method of claim 3 wherein said residue from said first leaching is repeatedly contacted with a recycled aqueous solution of said water soluble ferric salt for converting substantially all said sulfides to the corresponding salt prior to said second leaching with the sodium chloride brine solution.
Claim 11
Dependent Claim
50 words
The method of claim 8 wherein a portion of the filtrate from said ferric leaching is ejected as a ferrous ion bleed stream to compensate volumetrically for the amount of brine leaching solution that is introduced, thereby preventing an indefinite buildup of water soluble impurities in the recycled ferric solution.
Claim 12
Dependent Claim
37 words
The method of claim 3 wherein the brine solution of said second leaching contains about 250-350 grams per liter of sodium chloride, and said second leaching is for about 1/2-2 hours at a temperature of about 50°-100°C.
Claim 13
Dependent Claim
86 words
In the production of lead and silver metals from minerals including a mixture of galena and tetrahedrite containing lead and silver sulfides by leaching said minerals with an aqueous water soluble ferric salt solution followed by further leaching the solids from this first leach with an aqueous sodium chloride brine solution preparatory to separating the lead and silver salts, the improvement comprising: preliminarily roasting said minerals under substantially non-oxidizing conditions and at an elevated temperature and for a time equivalent to about 550°-600°C. for 1.5 hours.
Claim 14
Dependent Claim
86 words
In the production of lead and silver metals from minerals including a mixture of galena and tetrahedrite containing lead and silver sulfides by leaching said minerals with an aqueous water soluble ferric salt solution followed by further leaching the solids from this first leach with an aqueous sodium chloride brine solution preparatory to separating the lead and silver salts, the improvement comprising: preliminarily roasting said minerals under substantially non-oxidizing conditions and at an elevated temperature and for a time equivalent to about 550°-600°C. for 1.5 hours.
Claim 15
Dependent Claim
12 words
The method of claim 11 wherein said roasting temperature is about 525°-900°C.