Method and apparatus for constructing a suspension bridge tower
Assignee: Mitsui Engineering and Shipbuilding Co Ltd
•
Filing: 1975-07-16
•
Granted: 1976-04-20
•
Expires: 1995-07-16
Abstract
Abstract Apparatus for constructing a block tower for a suspension bridge includes a working platform, means for raising and lowering the platform vertically along a pre-erected base of the tower, and a carriage movable horizontally on tracks on the working platform. The carriage moves between a block loading station lateral of the base and a block unloading station above the top of the tower base where the block is superimposed on other blocks of the pre-erected base. The carriage is specially designed to raise and lower the lower block and to disengage the same at the block unloading station for return to the block loading station. A method is also disclosed for constructing a tower of built-up blocks.
Inventors
- 👤 Shigeru Mori
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-04 20:44
CPC Classifications
E; E01; E01D; E01D19/00; E01D19/14; E01D21/00; E01D21/06; E04; E04H; E04H12/00
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
213 words
Apparatus for erecting a tower comprising: pre-erected base means adapted to receive blocks superimposed one upon another, a platform extending laterally with respect to the base means, said platform having a block loading station lateral of said base means and a block unloading station directly overlying said base means, climbing means connected to said platform and engaging said base means to displace said platform vertically relative to said base means, a carriage mounted on said platform for movement thereon forwardly from said block loading station to said block unloading station for transporting one of said blocks to said block unloading station, means on said carriage for lowering said one block onto said pre-erected base means after said carriage has been displaced into said unloading station, and means for releasing said carriage from said one block at said unloading station onto said pre-erected base means to afford rearward return of said carriage unloaded to said loading station, said releasing means including a frame adapted to surround and support a lower portion of said one block and a gate at the forward end of the frame sized to permit passage of said carriage rearwardly relative to said one block for return to said loading station after said block has been lowered onto said base means.
Claim 2
Dependent Claim
213 words
Apparatus for erecting a tower comprising: pre-erected base means adapted to receive blocks superimposed one upon another, a platform extending laterally with respect to the base means, said platform having a block loading station lateral of said base means and a block unloading station directly overlying said base means, climbing means connected to said platform and engaging said base means to displace said platform vertically relative to said base means, a carriage mounted on said platform for movement thereon forwardly from said block loading station to said block unloading station for transporting one of said blocks to said block unloading station, means on said carriage for lowering said one block onto said pre-erected base means after said carriage has been displaced into said unloading station, and means for releasing said carriage from said one block at said unloading station onto said pre-erected base means to afford rearward return of said carriage unloaded to said loading station, said releasing means including a frame adapted to surround and support a lower portion of said one block and a gate at the forward end of the frame sized to permit passage of said carriage rearwardly relative to said one block for return to said loading station after said block has been lowered onto said base means.
Claim 3
Dependent Claim
60 words
Apparatus according to claim 1 wherein said frame means includes upper and lower frame portions and hydraulic means mounting said upper portion for movement vertically relative to said lower portion to provide said block lowering means, said upper portion of said frame means being engageable against said one block to support and to lower the same relative to said platform.
Claim 4
Dependent Claim
52 words
Apparatus according to claim 1 including means on said platform extending between said block loading and block unloading stations to guide said carriage on said platform between said stations, and means on said platform and carriage cooperating at said block loading station to releasably secure said carriage at said block loading station.
Claim 5
Dependent Claim
23 words
Apparatus according to claim 1 wherein said base means includes a pair of horizontally-spaced upwardly-projecting sections and said platform extends between said sections.
Claim 6
Independent Claim
256 words
A method of erecting a tower having pre-erected base means adapted to receive blocks superimposed one upon another by employing apparatus comprising a platform having a block loading station lateral of said base means and a block unloading station directly overlying said base means, means engaging said base means for raising and lowering said platform, a carriage moveable on said platform between said loading and unloading stations, said carriage having a frame adapted to surround a lower portion of one block and a gate sized to permit passage of said carriage laterally relative to said block, means on said carriage for lowering one block onto said base means, and means for releasing said carriage from a block at said loading station, said method comprising the steps of: depositing one of said blocks on said carriage at said block loading station, elevating said platform on said base means with said carriage at said block loading station to dispose the platform at a level adjacent the top of the pre-erected base means, displacing said carriage with said one block to said block unloading station, lowering said one block from said carriage and onto said pre-erected base means, opening said gate on said frame to release said carriage from said lowered one block at said block unloading station, returning said carriage unloaded to said block loading station, lowering said platform with said carriage at said block loading station, and repeating the above steps to superimpose additional ones of said blocks onto said base means, whereby the tower is erected.
Claim 7
Independent Claim
256 words
A method of erecting a tower having pre-erected base means adapted to receive blocks superimposed one upon another by employing apparatus comprising a platform having a block loading station lateral of said base means and a block unloading station directly overlying said base means, means engaging said base means for raising and lowering said platform, a carriage moveable on said platform between said loading and unloading stations, said carriage having a frame adapted to surround a lower portion of one block and a gate sized to permit passage of said carriage laterally relative to said block, means on said carriage for lowering one block onto said base means, and means for releasing said carriage from a block at said loading station, said method comprising the steps of: depositing one of said blocks on said carriage at said block loading station, elevating said platform on said base means with said carriage at said block loading station to dispose the platform at a level adjacent the top of the pre-erected base means, displacing said carriage with said one block to said block unloading station, lowering said one block from said carriage and onto said pre-erected base means, opening said gate on said frame to release said carriage from said lowered one block at said block unloading station, returning said carriage unloaded to said block loading station, lowering said platform with said carriage at said block loading station, and repeating the above steps to superimpose additional ones of said blocks onto said base means, whereby the tower is erected.
References Cited (Backward Citations)
US1686279A
Cited
US2566863A
Cited
US2754012A
Cited
FR1315412A
Cited
US3287875A
Cited
DE1285163B
Cited
US3703028A
Cited
US3789565A
Cited
US3679071A
Cited
US3753413A
Cited
US3797684A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1979-04-20 | 1979-10-20 | 1980-04-20 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1983-04-20 | 1983-10-20 | 1984-04-20 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1987-04-20 | 1987-10-20 | 1988-04-20 | $7700.00 | Window Closed / Lapsed |