Hydraulic mining of oil bearing formation

Assignee: Bechtel International Corp
•
Filing: 1974-08-26
•
Granted: 1976-01-27
•
Expires: 1994-08-26
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Method for recovering bitumen from oil or tar sand using jets of hot water and/or steam introduced into the sand via raises connected to underlying spaced aprt tunnels. The jets are arcuately moved horizontally in overlapping patterns to slurry the sand. Caverns are formed by caving the tar sand and removal of the slurry into which the over burden is permitted to cave forming there above a surface depression usable as a tailing pond. Cavities are formed by other jets which connect with the priorly formed cavities so there is a continuous backward movement of interconnecting cavities.

Inventors

  • 👤 Charles A. R. Lambly
  • 👤 Charles T. Draney

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 07:07
CPC Classifications
E; E21; E21C; E21C41/00; E21C41/16; E21C41/24; E21C45/00

Claims Analysis

Total Claims: 19
Claim 1
Independent Claim 253 words
A method of mining material from oil bearing formations, such as tar sands, wherein said formation is between an overburden of an overlying rock and soil formation and an underlying impervious stratum, by subjecting said formation to high velocity fluid jet streams capable of forming a slurry of said material; and wherein a plurality of spaced-apart tunnels are formed through said impervious stratum adjacent to and below said formation, which comprises: boring upwardly from said tunnels into said formation, a plurality of spaced-apart rows of channels, wherein said rows are spaced apart at a distance less than the effective distance of said jet stream for forming slurry from said material; from a first row of channels, directing into said formation material, high velocity rotating fluid jet streams to form a slurry of said formation material in the jet stream path, wherein the effective distance of adjacent jet streams overlap, so as to form a row of interconnecting cavities; directing said jet streams toward material from areas adjacent to said cavities, so as to continually enlarge said interconnected row of cavities to define a chamber, while initiating rotating jet streams from the next adjacent row of channels, so as to form a receding chamber moving towards said next row of channels, until said formation material and said overburden above a portion of said chamber is no longer supported and caves into a portion of said chamber; continuously removing slurry from said cavities for further processing; and repeating said process from successive rows of channels.
Claim 2
Independent Claim 253 words
A method of mining material from oil bearing formations, such as tar sands, wherein said formation is between an overburden of an overlying rock and soil formation and an underlying impervious stratum, by subjecting said formation to high velocity fluid jet streams capable of forming a slurry of said material; and wherein a plurality of spaced-apart tunnels are formed through said impervious stratum adjacent to and below said formation, which comprises: boring upwardly from said tunnels into said formation, a plurality of spaced-apart rows of channels, wherein said rows are spaced apart at a distance less than the effective distance of said jet stream for forming slurry from said material; from a first row of channels, directing into said formation material, high velocity rotating fluid jet streams to form a slurry of said formation material in the jet stream path, wherein the effective distance of adjacent jet streams overlap, so as to form a row of interconnecting cavities; directing said jet streams toward material from areas adjacent to said cavities, so as to continually enlarge said interconnected row of cavities to define a chamber, while initiating rotating jet streams from the next adjacent row of channels, so as to form a receding chamber moving towards said next row of channels, until said formation material and said overburden above a portion of said chamber is no longer supported and caves into a portion of said chamber; continuously removing slurry from said cavities for further processing; and repeating said process from successive rows of channels.
Claim 3
Dependent Claim 61 words
A method according to claim 1, wherein said jet streams are contiguous to said impervious stratum and said material adjacent to said cavities caves into said cavities into the paths of said jet streams and including the step of directing said jet streams toward the caved formation material lying under the caved overburden until the caved formation material has been slurried.
Claim 4
Dependent Claim 14 words
A method according to claim 1, wherein said oil bearing formation is tar sand.
Claim 5
Dependent Claim 11 words
A method according to claim 1, wherein said fluid is water.
Claim 6
Dependent Claim 20 words
A method according to claim 4, wherein said fluid is water at a temperature of at least 65°C or steam.
Claim 7
Dependent Claim 41 words
A method according to claim 4, wherein said slurry is partially processed by separating water and sand tailings from said slurry, and said caved overburden forms a pond at the surface of said overburden to receive said water and sand tailings.
Claim 8
Dependent Claim 29 words
A method according to claim 1, wherein at least three tunnels are employed and said overlap is at least 15 percent of the effective distance of said jet streams.
Claim 9
Dependent Claim 33 words
A method according to claim 7, wherein said jet streams are rotated in a 180° arc defining semi-circles, with the bases of said semi-circles of a row of jet streams in substantial alignment.
Claim 10
Independent Claim 305 words
A method of mining tar sand, wherein said tar sand is between an overburden of an overlying rock and soil formation and an underlying impervious stratum, by subjecting said tar sand to high velocity jet streams of water or steam capable of forming a slurry of said tar sand; and wherein a plurality of spaced-apart tunnels are formed through said impervious stratum adjacent to and below said tar sand, which comprises: boring upwardly from said tunnels into said tar sand, a plurality of spaced-apart rows of channels, and introducing through said channels into said tar sand, high velocity jet stream sources, wherein the distance between adjacent jet stream sources in successive rows is less than the distance for which said jet streams are effective in slurrying tar sand, from a first row of channels, directing into said tar sand, high velocity substantially horizontally rotating jet streams of water contiguous said impervious stratum to form a slurry of said tar sand in the jet stream path, wherein the area covered by adjacent jet streams overlap, so as to form a row of interconnecting cavities, and wherein tar sand adjacent to said cavities caves into said cavities; directing said jet streams toward said caved-in tar sand, so as to slurry said caved-in tar sand and continually enlarge said interconnected row of cavities to define a chamber, while directing substantially horizontally rotating jet streams contiguous to said impervious stratum from the next adjacent row of channels, until said tar sand and said overburden overlying a portion of said chamber is no longer supported and caves into a portion of said chamber; directing jet streams toward the caved tar sand lying under the caved overburden to slurry said caved tar sand; continuously removing slurry from said cavities for further processing; and repeating said process from successive rows of channels.
Claim 11
Independent Claim 305 words
A method of mining tar sand, wherein said tar sand is between an overburden of an overlying rock and soil formation and an underlying impervious stratum, by subjecting said tar sand to high velocity jet streams of water or steam capable of forming a slurry of said tar sand; and wherein a plurality of spaced-apart tunnels are formed through said impervious stratum adjacent to and below said tar sand, which comprises: boring upwardly from said tunnels into said tar sand, a plurality of spaced-apart rows of channels, and introducing through said channels into said tar sand, high velocity jet stream sources, wherein the distance between adjacent jet stream sources in successive rows is less than the distance for which said jet streams are effective in slurrying tar sand, from a first row of channels, directing into said tar sand, high velocity substantially horizontally rotating jet streams of water contiguous said impervious stratum to form a slurry of said tar sand in the jet stream path, wherein the area covered by adjacent jet streams overlap, so as to form a row of interconnecting cavities, and wherein tar sand adjacent to said cavities caves into said cavities; directing said jet streams toward said caved-in tar sand, so as to slurry said caved-in tar sand and continually enlarge said interconnected row of cavities to define a chamber, while directing substantially horizontally rotating jet streams contiguous to said impervious stratum from the next adjacent row of channels, until said tar sand and said overburden overlying a portion of said chamber is no longer supported and caves into a portion of said chamber; directing jet streams toward the caved tar sand lying under the caved overburden to slurry said caved tar sand; continuously removing slurry from said cavities for further processing; and repeating said process from successive rows of channels.
Claim 12
Dependent Claim 23 words
A method according to claim 9, wherein said water is employed in the form of at least one of hot water or steam.
Claim 13
Dependent Claim 21 words
A method according to claim 9, wherein said jet streams of water rotate in an arc of not greater than 180°.
Claim 14
Dependent Claim 32 words
A method according to claim 11, wherein said jet streams rotate in a 180° arc defining semi-circles, with the bases of said semi-circles of a row of jet streams in substantial alignment.
Claim 15
Dependent Claim 22 words
A method according to claim 9, wherein said jet streams are directed from jet nozzles which define rows of parallel straight lines.
Claim 16
Dependent Claim 21 words
A method according to claim 13, wherein said tunnels are substantially parallel and said lines are substantially normal to said tunnels.
Claim 17
Independent Claim 224 words
A method of mining material from oil bearing formations, such as tar sands, wherein said formation is between an overburden of an overlying rock and soil formation and an underlying impervious stratum, by subjecting said formation to high velocity fluid jet streams capable of forming a slurry of said material; and wherein at least one tunnel is formed through said impervious stratum adjacent to and below said formation, which comprises: boring upwardly from said tunnel into said formation, a plurality of spaced-apart successive channels, wherein said channels are spaced apart at a distance less than twice the effective distance of said jet stream for forming slurry from said material; from a first channel, directing into said formation material, a high velocity rotating fluid jet stream to form a slurry of said formation material in the jet stream path; directing said jet stream toward material from areas adjacent to said cavity, so as to continually enlarge said cavity to define a chamber, while initiating a rotating jet stream from the next channel, so as to form a receding chamber moving towards said next channel, until said formation material and said overburden above a portion of said chamber is no longer supported and caves into a portion of said chamber; continuously removing slurry from said cavities for further processing; and repeating said process from successive channels.
Claim 18
Independent Claim 224 words
A method of mining material from oil bearing formations, such as tar sands, wherein said formation is between an overburden of an overlying rock and soil formation and an underlying impervious stratum, by subjecting said formation to high velocity fluid jet streams capable of forming a slurry of said material; and wherein at least one tunnel is formed through said impervious stratum adjacent to and below said formation, which comprises: boring upwardly from said tunnel into said formation, a plurality of spaced-apart successive channels, wherein said channels are spaced apart at a distance less than twice the effective distance of said jet stream for forming slurry from said material; from a first channel, directing into said formation material, a high velocity rotating fluid jet stream to form a slurry of said formation material in the jet stream path; directing said jet stream toward material from areas adjacent to said cavity, so as to continually enlarge said cavity to define a chamber, while initiating a rotating jet stream from the next channel, so as to form a receding chamber moving towards said next channel, until said formation material and said overburden above a portion of said chamber is no longer supported and caves into a portion of said chamber; continuously removing slurry from said cavities for further processing; and repeating said process from successive channels.
Claim 19
Dependent Claim 11 words
A method according to claim 15, wherein said fluid is water.

References Cited (Backward Citations)

US1935643A Cited
US1607586A Cited
US1856836A Cited
US3097830A Cited
US3402968A Cited
US3467435A Cited
US3529868A Cited
US3749314A Cited
US3797590A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-01-26 1979-07-28 1980-01-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-01-26 1983-07-28 1984-01-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-01-26 1987-07-28 1988-01-27 $7700.00 Window Closed / Lapsed