Abstract

Abstract The common control equipment of a switching system including a plurality of functional block circuits is comprised of equipment for selectively actuating said functional block circuits in a desired sequence, which sequence is stored in a memory in said equipment. Several memories are provided to enable several sequences to be stored simultaneously so that any stored sequence can be actuated. In compliance with the type of connection requested by a call, the control equipment selects the memory equipment which stores the sequence that establishes the requested connection.

Inventors

  • 👤 Teruo Yokoo

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 09:56
CPC Classifications
H; H04; H04Q; H04Q3/00; H04Q3/42; H04Q3/54; H04Q3/545

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 477 words
A telecommunications switching system comprising common control equipment and a plurality of connection operation equipment groups, each group consisting of a plurality of connection operation equipment, each connection operation equipment in said groups being capable of carrying out a connection operation specific to each said group, each connection operation equipment of at least two of said groups comprising an initiation signal circuit responsive to a call reaching thereto and requesting a connection to be established through said switching system for producing an initiation signal, the connections to be established through said switching system being classified into a plurality of types, said initiation signal being of a level representative of the type of connection requested by a call responsive, to which said initiation signal is produced, a connection of each of said types being established by making selected connection operation equipment, selected in compliance with said each type of connection, sequentially carry out connection operations specific thereto, said common control equipment comprising a plurality of functional block circuits and control means, connection operation equipment of each of said groups being coupled to at least one of said functional block circuits, said control means being coupled to the initiation signal circuits and to said functional block circuits and responsive to the level of an initiation signal produced by one of said initiation signal circuits for selecting functional block circuits in compliance with the type of connection represented by the said level and for causing the selected functional block circuits to select connection operation equipment, one from each of the groups of connection operation equipment coupled to the selected functional block circuits, thereby causing the selected connection operation equipment to sequentially carry out connection operations specific thereto to establish the connection of the type represented by said initiation signal level, wherein the improvement comprises: a. end signal means in each of said functional block circuits for producing an end signal upon completion of the connection operation of one of connection operation equipment selected by said each functional block circuit, b. start signal means in each of said functional block circuits responsive to a start signal delivered thereto for initiating operation of said functional block circuits, c. a plurality of start signal generating means, each being connected and adapted for applying start signals in sequence and in preselected order to start signal means in said functional block circuits, each said generating means comprising a memory means for storing information indicia representative of said respective preselected order, and d. a control circuit responsive to the level of said initiation signal for selecting in accordance with said level one of said start signal generating means, and further responsive to said initiation signal and each said end signal for stepping said selected start signal generating means to cause said selected start signal generating means to generate the next start signal in its preselected order.
Claim 2
Dependent Claim 477 words
A telecommunications switching system comprising common control equipment and a plurality of connection operation equipment groups, each group consisting of a plurality of connection operation equipment, each connection operation equipment in said groups being capable of carrying out a connection operation specific to each said group, each connection operation equipment of at least two of said groups comprising an initiation signal circuit responsive to a call reaching thereto and requesting a connection to be established through said switching system for producing an initiation signal, the connections to be established through said switching system being classified into a plurality of types, said initiation signal being of a level representative of the type of connection requested by a call responsive, to which said initiation signal is produced, a connection of each of said types being established by making selected connection operation equipment, selected in compliance with said each type of connection, sequentially carry out connection operations specific thereto, said common control equipment comprising a plurality of functional block circuits and control means, connection operation equipment of each of said groups being coupled to at least one of said functional block circuits, said control means being coupled to the initiation signal circuits and to said functional block circuits and responsive to the level of an initiation signal produced by one of said initiation signal circuits for selecting functional block circuits in compliance with the type of connection represented by the said level and for causing the selected functional block circuits to select connection operation equipment, one from each of the groups of connection operation equipment coupled to the selected functional block circuits, thereby causing the selected connection operation equipment to sequentially carry out connection operations specific thereto to establish the connection of the type represented by said initiation signal level, wherein the improvement comprises: a. end signal means in each of said functional block circuits for producing an end signal upon completion of the connection operation of one of connection operation equipment selected by said each functional block circuit, b. start signal means in each of said functional block circuits responsive to a start signal delivered thereto for initiating operation of said functional block circuits, c. a plurality of start signal generating means, each being connected and adapted for applying start signals in sequence and in preselected order to start signal means in said functional block circuits, each said generating means comprising a memory means for storing information indicia representative of said respective preselected order, and d. a control circuit responsive to the level of said initiation signal for selecting in accordance with said level one of said start signal generating means, and further responsive to said initiation signal and each said end signal for stepping said selected start signal generating means to cause said selected start signal generating means to generate the next start signal in its preselected order.
Claim 3
Dependent Claim 134 words
A switching system as claimed in claim 1, wherein said plurality of start signal generating means further comprises a decoder coupled to and common to all said memory means and to said functional block circuits, each of said memory means being capable of memorizing a sequence of operation coded signals that corresponds to one of said types of connection and, responsive to a control signal delivered to said memory means from said control circuit in compliance with the last-mentioned type of connection, for sequentially delivering said memorized operation coded signals to said decoder, the coded signals of said sequence corresponding to functional block circuits, said decoder responsive to said operation coded signals delivered thereto for sequentially delivering start signals to the start signal means of functional block circuits specified by said operation coded signals.
Claim 4
Dependent Claim 231 words
A switching system as claimed in claim 2, wherein: said control circuit comprises encoder means coupled to said initiation signal circuits and responsive to the level of an initiation signal delivered thereto for producing an initiation code representative of the type of connection represented by the last-mentioned level, each of said start signal generating means comprising a control decoder coupled to said encoder means and responsive to a respective one of said initiation codes delivered thereto for producing a gate signal, said control circuit further comprising counter means, coupled to said encoder means and to said end signal means of said functional block circuits and responsive to an initiation code and to end signals for producing program step signals, each of said start signal generating means further comprising a gate circuit, coupled to the control decoder and the memory means of said start signal generating means and to said counter means, said gate circuit being enabled by a gate signal produced by said last-mentioned control decoder, and responsive to program step signals delivered to the said gate circuit from said counter means, for allowing the last-mentioned step pulses to pass therethrough to the last-mentioned memory means, said memory means of each of said start signal generating means being responsive to program step signals having passed through the respective gate circuit for sequentially delivering operation coded signals stored therein to said decoder.
Claim 5
Dependent Claim 124 words
A switching system as claimed in claim 1, wherein each of said start signal generating means comprises a drive circuit and a plurality of jumpers, said drive circuit having an input terminal coupled to said control circuit and a plurality of output terminals and, being responsive to a control signal delivered thereto from said control circuit responsive to the level of an initiation signal produced by one of said initiation signal circuits, for producing drive signals successively at the output terminals of said drive circuit, said jumpers interconnecting the output terminals of said drive circuit and said start signal means of said functional block circuits whereby the interconnections may be physically altered to provide any desired sequence of operation of said functional block circuits.

References Cited (Backward Citations)

US3378818A Cited
US3671942A Cited
US3727192A Cited
US3729715A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1979-01-12 1979-07-14 1980-01-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1983-01-12 1983-07-14 1984-01-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1987-01-12 1987-07-14 1988-01-13 $7700.00 Window Closed / Lapsed