US3880538A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Embankment on muskeg and associated methods
Assignee: Individual
•
Filing: 1974-02-11
•
Granted: 1975-04-29
•
Expires: 1994-02-11
Abstract
Abstract Described are techniques for building improved roads and embankments on muskeg terrain; with an embodiment for a timber haul road using a substrate mat of rigid polyurethane form supporting a properly-distributed embankment of native gravel (or like road building material), preferably distributed in a ''''counterbalancing berm'''' construction and providing an improved stable roadway embankment in the face of stress conditions typical of muskeg areas.
Inventors
- 👤 Glenn R Burt
- 👤 Richard L Odsather
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 11:07
CPC Classifications
E; E02; E02D; E02D17/00; E02D17/18; E01; E01C; E01C3/00; E01C3/06
Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
115 words
A method for constructing improved, more stable embankments upon muskeg-type terrain, such embankments contemplating the imposition of relatively high loading on a prescribed bearing portion thereof, the method comprising the steps of: a. Placing a continuous, structurally integral water-impervious mat structure upon the surface of the subject terrain so as to cover and define the contemplated embankment site and b. Distributing particulate embankment materials upon this mat structure so as to generate a center region of maximum static loading of the mat structure, thereby depressing the mat configuration thereunder and thereby tending to uniformly consolidate the underlying muskeg terrain to a high degree sufficient to be relatively rigid and incompressible under the contemplated surface loading.
Claim 2
Independent Claim
115 words
A method for constructing improved, more stable embankments upon muskeg-type terrain, such embankments contemplating the imposition of relatively high loading on a prescribed bearing portion thereof, the method comprising the steps of: a. Placing a continuous, structurally integral water-impervious mat structure upon the surface of the subject terrain so as to cover and define the contemplated embankment site and b. Distributing particulate embankment materials upon this mat structure so as to generate a center region of maximum static loading of the mat structure, thereby depressing the mat configuration thereunder and thereby tending to uniformly consolidate the underlying muskeg terrain to a high degree sufficient to be relatively rigid and incompressible under the contemplated surface loading.
Claim 3
Dependent Claim
42 words
The method as recited in claim 1 wherein the embankment materials are distributed according to a ''''flanking berm'''' mode so as to counterbalance the said center high loading materials by the weight of embankment materials distributed outward therefrom in a counterbalancing manner.
Claim 4
Dependent Claim
122 words
An embankment road constructed of a prescribed particulate material on terrain comprising a surface layer of light compressible soil material of relatively high water content, this road comprising: a substrate mat structure placed upon this terrain so as to define the contemplated road and support said particulate road material; and an array of said road particulate materials distributed upon said mat structure so as to develop sufficient static loading on said compressible soil material at the center of the roadway to thereby render it relatively rigid and incompressible under contemplated surface loading and thus form an improved highly stable roadway structure; said mat being formed to comprise a continuous structural-integral layer of water-impervious materials while supporting the described loads without rupture thereof.
Claim 5
Dependent Claim
122 words
An embankment road constructed of a prescribed particulate material on terrain comprising a surface layer of light compressible soil material of relatively high water content, this road comprising: a substrate mat structure placed upon this terrain so as to define the contemplated road and support said particulate road material; and an array of said road particulate materials distributed upon said mat structure so as to develop sufficient static loading on said compressible soil material at the center of the roadway to thereby render it relatively rigid and incompressible under contemplated surface loading and thus form an improved highly stable roadway structure; said mat being formed to comprise a continuous structural-integral layer of water-impervious materials while supporting the described loads without rupture thereof.
Claim 6
Dependent Claim
17 words
The road structure recited in claim 3 wherein said mat is comprised of relatively rigid polymeric materials.
Claim 7
Dependent Claim
33 words
The composition as recited in claim 4 wherein said mat includes rigid stiffener means affixed thereon directly under the maximum-loaded traffic sections of the road so as to minimize any ''''rolling wave'''' phenomenon.
Claim 8
Dependent Claim
34 words
The combination as recited in claim 4 wherein said mat comprises a layer of polyurethane foam material of sufficiently high compressive strength to support the contemplated loading without rupture and a supplemental reinforcement layer.
Claim 9
Dependent Claim
40 words
The combination as recited in claim 6 wherein said polyurethane foam is applied in a multi-laminate form and wherein a precoat of water-impervious material is applied prior to application of the foam and said reinforcement layer is nylon mesh material.
Claim 10
Dependent Claim
31 words
The combination as recited in claim 7 wherein said precoat is comprised primarily of bituminous materials extended by a polymeric extender adapted for low temperature flexibility of the mat in service.
Claim 11
Independent Claim
81 words
A method of floating an improved more stable gravel road atop muskeg-type terrain comprising the steps of: a. Placing a continuously structurally integral polymeric water-impervious mat upon the terrain surface so as to define the roadway site; b. Distributing particulate materials upon this mat so as to form the roadway embankment in a manner that develops a central traffic-supporting region of maximum uniform weight, tending to depress the portion of the supporting mat thereunder and consolidate the supporting muskeg materials thereunder.
Claim 12
Independent Claim
81 words
A method of floating an improved more stable gravel road atop muskeg-type terrain comprising the steps of: a. Placing a continuously structurally integral polymeric water-impervious mat upon the terrain surface so as to define the roadway site; b. Distributing particulate materials upon this mat so as to form the roadway embankment in a manner that develops a central traffic-supporting region of maximum uniform weight, tending to depress the portion of the supporting mat thereunder and consolidate the supporting muskeg materials thereunder.
Claim 13
Dependent Claim
65 words
The combination as recited in claim 9 wherein the particulates are distributed in a ''''flanking berm'''' mode so as to develop said depressed central mat section and maximum central static loading while also counterbalancing and stabilizing this and gradually diminishing the static loading upward therefrom thereby minimizing any sharp discontinuities of stress upon the underlying mat and minimizing resultant shear and a tendency to rupture.
Claim 14
Dependent Claim
37 words
The combination as recited in claim 9 wherein rigid reinforcing stiffener means is affixed to the mat structure along portions thereof underlying the contemplated traffic load, said means being sufficiently rigid to minimize and ''''rolling wave'''' phenomenon.
Claim 15
Dependent Claim
55 words
The combination as recited in claim 9 wherein said mat is so formed and comprised of materials as to render a monolithic structure distributing loads over a larger area of supporting terrain and so as to function as a barrier, both to the intrusion of moisture and to the escape of particulate roadway materials therefrom.
References Cited (Backward Citations)
US584083A
Cited
US1421901A
Cited
US2211649A
Cited
US2737092A
Cited
US3022712A
Cited
US3474625A
Cited
US3626702A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1978-04-28 | 1978-10-28 | 1979-04-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1982-04-28 | 1982-10-28 | 1983-04-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1986-04-28 | 1986-10-28 | 1987-04-29 | $7700.00 | Window Closed / Lapsed |