US3863701A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for manufacturing heat-insulated castings

Assignee: Toyota Motor Corp
•
Filing: 1972-05-17
•
Granted: 1975-02-04
•
Expires: 1992-05-17
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The present disclosure relates to a process for manufacturing cast pipes of the type which excel in heat-insulating characteristics and which are highly durable under high temperatures. An internal core of metallic material with high resistance to heat and corrosion is externally coated with a highly heat-insulating layer to thereby produce a double structure, and the double structure is then surrounded in molten metal to produce the casting.

Inventors

  • 👤 Itaru Niimi
  • 👤 Yasuhisa Kaneko
  • 👤 Akiyoshi Morita
  • 👤 Katumi Yagi
  • 👤 Hiromitu Kashiwagi

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 15:58
CPC Classifications
B; B22; B22D; B22D19/00

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 103 words
A PROCESS FOR MAUUFACTURING HEAT-INSULATED CASTINGS COMPRISING THE STEPS OF PROVIDING A HOLLOW METAL CORE HAVING RESISTANCE TO HEAT AND CORROSION, APPLYING A BONDING AGENT TO THE OUTSIDE OF THE CORE AND THEREAFTER COATING S FOAMED ALUMINA ONTO THE BONDING AGENT ON THE OUTSIDE OF THE METAL CORE, DRYING THE THUS OBTAINED DOUBLE STRUCTURE AT ROOM TEMERATURE, AND THEN AT A TEMPERATURE OF APPROXIMATELY 250*C. FOR AT LEAST ABOUT 10 HOURS FOLLOWED BY DRYING AT ABOUT 500*C. FOR SEVERAL HOURS, POSITIONING THE DOUBLE STRUCTURE IN A MOLD, AND POURING MOLTEN METAL INTO THE MOLD TO SURROUND THE DOUBLE STRUCTURE IN A METAL CASTING.
Claim 2
Dependent Claim 103 words
A PROCESS FOR MAUUFACTURING HEAT-INSULATED CASTINGS COMPRISING THE STEPS OF PROVIDING A HOLLOW METAL CORE HAVING RESISTANCE TO HEAT AND CORROSION, APPLYING A BONDING AGENT TO THE OUTSIDE OF THE CORE AND THEREAFTER COATING S FOAMED ALUMINA ONTO THE BONDING AGENT ON THE OUTSIDE OF THE METAL CORE, DRYING THE THUS OBTAINED DOUBLE STRUCTURE AT ROOM TEMERATURE, AND THEN AT A TEMPERATURE OF APPROXIMATELY 250*C. FOR AT LEAST ABOUT 10 HOURS FOLLOWED BY DRYING AT ABOUT 500*C. FOR SEVERAL HOURS, POSITIONING THE DOUBLE STRUCTURE IN A MOLD, AND POURING MOLTEN METAL INTO THE MOLD TO SURROUND THE DOUBLE STRUCTURE IN A METAL CASTING.
Claim 3
Dependent Claim 43 words
A process for manufacturing heat-insulated castings as in claim 1 wherein the double structure is positioned in a sand mold and the molten metal is poured vertically into the mold to thereby fill the cavity between the double structure and the sand mold.
Claim 4
Dependent Claim 119 words
A process for manufacturing heat-insulated castings comprising the steps of providing a hollow metal core having resistance to heat and corrosion, applying a bonding agent to the outside of the core and thereafter applying several times repeatedly a slurry consisting of sodium silicate and zircon flour as the bonding agent on the outside of the metal core on which a foamed polystyrene is spread, drying the thus obtained double structure at room temperature, and then at a temperature of approximately 250*C. for at least about 10 hours followed by drying at about 500*C. for several hours, positioning the double structure in a mold, and pouring molten metal into the mold to surround the double structure in a metal casting.
Claim 5
Dependent Claim 119 words
A process for manufacturing heat-insulated castings comprising the steps of providing a hollow metal core having resistance to heat and corrosion, applying a bonding agent to the outside of the core and thereafter applying several times repeatedly a slurry consisting of sodium silicate and zircon flour as the bonding agent on the outside of the metal core on which a foamed polystyrene is spread, drying the thus obtained double structure at room temperature, and then at a temperature of approximately 250*C. for at least about 10 hours followed by drying at about 500*C. for several hours, positioning the double structure in a mold, and pouring molten metal into the mold to surround the double structure in a metal casting.
Claim 6
Dependent Claim 43 words
A process for manufacturing heat-insulated castings as in claim 3 wherein the double structure is positioned in a sand mold and the molten metal is poured vertically into the mold to thereby fill the cavity between the double structure and the sand mold.

References Cited (Backward Citations)

US927371A Cited
US938689A Cited
US938688A Cited
US1025817A Cited
US2690004A Cited
US3173451A Cited
US3170452A Cited
US3461944A Cited
US3568723A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1978-02-03 1978-08-05 1979-02-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1982-02-03 1982-08-05 1983-02-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1986-02-03 1986-08-05 1987-02-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag