Patent US3841705A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3841705A Expired / Lapsed US ⏱️ 0.0 years remaining

Stimulation of production well for in situ metal mining

Assignee: Kennecott Utah Copper LLC
•
Filing: 1973-09-27
•
Granted: 1974-10-15
•
Expires: 1993-09-27
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Metal values are economically leached in situ by rubblizing a portion of an ore body, injecting a lixiviant for the metal values through one or more injection wells in the ore body located adjacent to but outside the rubblized portion of the ore body, and collecting the lixiviant containing the dissolved metal values from one or more production wells located in a rubblized zone of the ore body.

Inventors

  • 👤 L Girard
  • 👤 R Hard

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 18:28
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/28; E21B43/283

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 96 words
AN IMPROVED PROCESS FOR RECOVERING METAL VALUES BY INSITU LEACHING AN ORE BODY LOCATED BELOW THE WATER TABLE WHICH COMPRISES: A. FORMING A RUBBLIZED ZONE IN AN ORE BODY WHEREBY THE RUBBLIZED ZONE CONTAINS FRACTURED METAL BEARING ORE PARTICLES; B. INJECTING A LEACH SOLUTION THROUGH ONE OR MORE INJECTION WELLS LOCATED IN THE ORE BODY ADJACENT TO BUT OUTSIDE THE RUBBLIZED ZONE, THE LEACH SOLUTION SOLUBILIZING METAL VALUES IN THE ORE BODY AND IN THE RUBBLIZED ZONE; AND C. RECOVERING A METAL CONTAINING LEACH SOLUTION THROUGH ONE OR MORE PRODUCTION WELLS LOCATED IN THE RUBBLIZED ZONE.
Claim 2
Dependent Claim 96 words
AN IMPROVED PROCESS FOR RECOVERING METAL VALUES BY INSITU LEACHING AN ORE BODY LOCATED BELOW THE WATER TABLE WHICH COMPRISES: A. FORMING A RUBBLIZED ZONE IN AN ORE BODY WHEREBY THE RUBBLIZED ZONE CONTAINS FRACTURED METAL BEARING ORE PARTICLES; B. INJECTING A LEACH SOLUTION THROUGH ONE OR MORE INJECTION WELLS LOCATED IN THE ORE BODY ADJACENT TO BUT OUTSIDE THE RUBBLIZED ZONE, THE LEACH SOLUTION SOLUBILIZING METAL VALUES IN THE ORE BODY AND IN THE RUBBLIZED ZONE; AND C. RECOVERING A METAL CONTAINING LEACH SOLUTION THROUGH ONE OR MORE PRODUCTION WELLS LOCATED IN THE RUBBLIZED ZONE.
Claim 3
Dependent Claim 31 words
The process of claim 1 wherein the rubblized zone is produced by detonating one or more strategically placed explosives in the ore body, said explosive selected from nuclear and chemical explosives.
Claim 4
Dependent Claim 33 words
The process of claim 1 wherein the one or more injection wells are located between at least about 50 feet and up to about 700 feet from the one or more production wells.
Claim 5
Dependent Claim 14 words
The process of claim 1 wherein the ore body contains a copper bearing ore.
Claim 6
Dependent Claim 27 words
The process of claim 4 wherein the leach solution is injected through the one or more injection wells at a pressure less than the formation fracture pressure.
Claim 7
Dependent Claim 17 words
The process of claim 5 wherein the leach solution contains a dispersion of an oxygen bearing gas.
Claim 8
Independent Claim 90 words
The method of leaching a metal bearing ore in place which comprises: a. injecting a leach solution at a pressure below the formation fracturing pressure through at least one injection well located in a non-rubblized zone of a metal bearing ore body located below the water table; b. allowing the leach solution to remain in the ore body to solubilize metallic ions present in the ore body, and c. recovering metallic ion containing leach solution from at least one production well located in a rubblized zone in the ore body.
Claim 9
Independent Claim 90 words
The method of leaching a metal bearing ore in place which comprises: a. injecting a leach solution at a pressure below the formation fracturing pressure through at least one injection well located in a non-rubblized zone of a metal bearing ore body located below the water table; b. allowing the leach solution to remain in the ore body to solubilize metallic ions present in the ore body, and c. recovering metallic ion containing leach solution from at least one production well located in a rubblized zone in the ore body.
Claim 10
Dependent Claim 13 words
The process of claim 7 wherein the ore body contains copper bearing ore.
Claim 11
Dependent Claim 18 words
The process of claim 8 wherein the leach solution is aqueous sulfuric acid containing an oxygen bearing gas.
Claim 12
Dependent Claim 27 words
The process of claim 9 wherein at least one injection well is located between about 50 feet and about 700 feet from at least one production well.

References Cited (Backward Citations)

US3278233A Cited
US3490534A Cited
US3542131A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1977-10-14 1978-04-15 1978-10-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1981-10-14 1982-04-15 1982-10-15 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1985-10-14 1986-04-15 1986-10-15 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag