Patent US3822748A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3822748A Expired / Lapsed US ⏱️ 0.0 years remaining

Petroleum recovery process

Assignee: Texaco Inc
•
Filing: 1973-05-04
•
Granted: 1974-07-09
•
Expires: 1993-05-04
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process for producing petroleum from a subterranean reservoir is provided whereby a solvent equal in density or more dense than water is circulated between upper and lower perforations in a first well in order to dissolve petroleum in an ever-widening volume around the well bore until communication is established to a second well. At this point the production side of the first well is shut in, injection of solvent is ceased, an aqueous fluid is injected into the first well and production is taken from the second well.

Inventors

  • 👤 J Allen
  • 👤 M Fontaine
  • 👤 A Brown
  • 👤 J Tate

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 09:44
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/162

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 14 words
A process as in claim 1 wherein the reservoir is a tar sand reservoir.
Claim 2
Dependent Claim 12 words
A process as in claim 2 wherein the solvent comprises carbon disulfide.
Claim 3
Dependent Claim 13 words
A process as in claim 2 wherein the solvent comprises a chlorinated hydrocarbon.
Claim 4
Dependent Claim 19 words
A process as in claim 2 wherein the solvent comprises a mixture of carbon disulfide and a chlorinated hydrocarbon.
Claim 5
Dependent Claim 25 words
A process as in claim 1 wherein the aqueous fluid of step (e) has a temperature sufficient to vaporize the solvent remaining in the reservoir.
Claim 6
Dependent Claim 97 words
A process for producing petroleum from a subterranean reservoir having at least two wells, the first well being open to the reservoir at two places vertically separated and equipped to prevent internal fluid communication between the upper and lower openings, and the second well being open to the reservoir in at least one place comprising : a. cycling a petroleum solvent more dense than water in the first well until fluid communication is established between the first and second wells, b. injecting an aqueous fluid into the first well while petroleum is produced through the second well.
Claim 7
Dependent Claim 14 words
A process as in claim 7 wherein the reservoir is a tar sand reservoir.
Claim 8
Dependent Claim 12 words
A process as in claim 8 wherein the solvent comprises carbon disulfide.
Claim 9
Dependent Claim 13 words
A process as in claim 8 wherein the solvent comprises a chlorinated hydrocarbon.
Claim 10
Dependent Claim 19 words
A process as in claim 8 wherein the solvent comprises a mixture of carbon disulfide and a chlorinated hydrocarbon.
Claim 11
Dependent Claim 25 words
A process as in claim 7 wherein the aqueous fluid of step (b) has a temperature sufficient to vaporize the solvent remaining in the reservoir.

References Cited (Backward Citations)

US2725106A Cited
US2910123A Cited
US3221810A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1977-07-08 1978-01-07 1978-07-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1981-07-08 1982-01-07 1982-07-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1985-07-08 1986-01-07 1986-07-09 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag