Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
180 words
A method of evacuating drilling fluid from a multiple zone well having upper and lower packer means therein, comprising the steps of: a. running a first string of tubing into said well for penetration of both of said packer means and having circulating joint means thereon for disposition between said upper and lower packer means; b. running a second string of tubing into said well for penetration of said upper packer means; c. applying pressure to said circulating joint means, through said first string of tubing, to open port means therein; d. circulating fluid through said first and second strings, said port means and the area between said packer means, displacing drilling fluid accumulated between said packer means; e. dropping closure means into said circulating joint means for engagement with seat means therein; f. closing said port means independently of said second string of tubing by applying pressure to said joint means through said first string; and g. removing said closure means from said circulating joint means by increasing the pressure applied to said joint means through said first string.
Claim 2
Independent Claim
180 words
A method of evacuating drilling fluid from a multiple zone well having upper and lower packer means therein, comprising the steps of: a. running a first string of tubing into said well for penetration of both of said packer means and having circulating joint means thereon for disposition between said upper and lower packer means; b. running a second string of tubing into said well for penetration of said upper packer means; c. applying pressure to said circulating joint means, through said first string of tubing, to open port means therein; d. circulating fluid through said first and second strings, said port means and the area between said packer means, displacing drilling fluid accumulated between said packer means; e. dropping closure means into said circulating joint means for engagement with seat means therein; f. closing said port means independently of said second string of tubing by applying pressure to said joint means through said first string; and g. removing said closure means from said circulating joint means by increasing the pressure applied to said joint means through said first string.
Claim 3
Dependent Claim
25 words
The method of claim 1 in which both said upper and lower packer means are completely set prior to said opening of said, port means.
Claim 4
Dependent Claim
30 words
The method of claim 2 in which said upper packer means is completely set after said running of said second string but prior to said opening of said port means.
Claim 5
Independent Claim
202 words
A method of evacuating drilling fluids from a multiple zone well having upper and lower packer means therein comprising the steps of: a. running and setting said lower packer means in said well; b. running a first string of tubing into said well and through said lower packer means, said first string of tubing having said upper packer means attached thereto and circulating joint means thereon for disposition between said lower and upper packer means; c. running a second string of tubing into said well and through said upper packer means; d. setting said upper packer means; e. applying pressure to said first string of tubing to open port means in said circulating joint means; f. circulating fluid through said first and second strings, said port means and the area between said upper and lower packer means to displace drilling fluid accumulated between said upper and lower packer means; g. dropping closure means into said circulating joint means for engagement with seat means therein and closing said port means by applying pressure to said joint means through said first string; and h. removing said closure means from said joint means by applying increased pressure to said joint means, through said first string.
Claim 6
Independent Claim
202 words
A method of evacuating drilling fluids from a multiple zone well having upper and lower packer means therein comprising the steps of: a. running and setting said lower packer means in said well; b. running a first string of tubing into said well and through said lower packer means, said first string of tubing having said upper packer means attached thereto and circulating joint means thereon for disposition between said lower and upper packer means; c. running a second string of tubing into said well and through said upper packer means; d. setting said upper packer means; e. applying pressure to said first string of tubing to open port means in said circulating joint means; f. circulating fluid through said first and second strings, said port means and the area between said upper and lower packer means to displace drilling fluid accumulated between said upper and lower packer means; g. dropping closure means into said circulating joint means for engagement with seat means therein and closing said port means by applying pressure to said joint means through said first string; and h. removing said closure means from said joint means by applying increased pressure to said joint means, through said first string.
Claim 7
Dependent Claim
24 words
The meThod of claim 4 in which said closing of said port means is accomplished while maintaining said second string in a stationary position.