Maintenance of railway track

Assignee: HEAT DONALD L 98 TENNISON AVENUE RUGBY
•
Filing: 1971-11-29
•
Granted: 1974-03-12
•
Expires: 1991-11-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of correcting the level of a sleeper of railway track supported on a ballast bed comprises applying a loading, for example, through the sleeper to the ballast beneath the sleeper towards at least one end of the sleeper of an intensity greater than the intensity of normal traffic loading, the loading being applied a number of times sufficient to deform the ballast vertically in order to support the sleeper end at a desired lower level. The loading may be applied directly to a high sleeper end or a low sleeper end may be raised above its desired level and a packing of ballast placed beneath it prior to the application of the loading.

Inventors

  • 👤 J Waters
  • 👤 M Shenton
  • 👤 D Heath

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 04:37
CPC Classifications
E; E01; E01B; E01B27/00; E01B27/12; E01B27/13; E01B27/16

Claims Analysis

Total Claims: 17
Claim 1
Independent Claim 112 words
A method of correcting the level of the sleepers of a railway track supported on a ballast bed comprising, repetitively applying to the ballast beneath any one sleeper towards at least one end thereof a vertical load which is greater than the magnitude of normal traffic loading, repeating said high magnitude loading a sufficient number of times to (a) deform the ballast vertically to support the sleeper end at perdetermined level, and (b) to ensure that further loadings caused by normal traffic will result in further vertical deformation of the ballast to an extent not exceeding a predetermined value, and repeating said loading step on each sleeper which is to be lowered.
Claim 2
Independent Claim 112 words
A method of correcting the level of the sleepers of a railway track supported on a ballast bed comprising, repetitively applying to the ballast beneath any one sleeper towards at least one end thereof a vertical load which is greater than the magnitude of normal traffic loading, repeating said high magnitude loading a sufficient number of times to (a) deform the ballast vertically to support the sleeper end at perdetermined level, and (b) to ensure that further loadings caused by normal traffic will result in further vertical deformation of the ballast to an extent not exceeding a predetermined value, and repeating said loading step on each sleeper which is to be lowered.
Claim 3
Dependent Claim 15 words
A method as claimed in claim 1 wherein the loading is applied to the sleeper.
Claim 4
Dependent Claim 22 words
A method as claimed in claim 1, wherein the loading is applied to the rail head at a position above the sleeper.
Claim 5
Dependent Claim 30 words
A method as claimed in claim 1, wherein loading is applied towards both ends of the sleeper to cause the whole sleeper to be supported at a desired lower level.
Claim 6
Dependent Claim 20 words
A method as claimed in claim 4, wherein the loading is applied simultaneously to the ballast towards both sleeper ends.
Claim 7
Dependent Claim 42 words
A method as claimed in claim 4, wherein the loading applied towards one end of the sleeper is different from the loading applied towards the other end in order to cause different vertical deformations of the ballast towards the two sleeper ends.
Claim 8
Dependent Claim 33 words
A method as claimed in claim 4 wherein a different number of loadings are applied towards the two sleeper ends to cause different vertical deformations of the ballast towards the two sleeper ends.
Claim 9
Dependent Claim 32 words
A method as claimed in claim 1, wherein prior to the application of the loading a sleeper end is raised above its desired level and a packing of ballast placed beneath it.
Claim 10
Independent Claim 139 words
A method of raising the level of a sleeper to a desired level comprising lifting at least one sleeper end to a height above the desired level and packing ballast beneath it, and then applying loadings by a method comprising applying a loading to the ballast beneath the sleeper towards at least one end of the sleeper of an intensity greater than the intensity of normal traffic loading, the loading being applied a number of times sufficient to deform the ballast vertically to cause the sleeper end to be lowered to the desired level, the amount by which the sleeper end is lifted above the desired level prior to the application of the loading being such that the rate of vertical deformation of the ballast bed beneath the sleeper towards said end under renewed traffic loading is acceptably low.
Claim 11
Independent Claim 139 words
A method of raising the level of a sleeper to a desired level comprising lifting at least one sleeper end to a height above the desired level and packing ballast beneath it, and then applying loadings by a method comprising applying a loading to the ballast beneath the sleeper towards at least one end of the sleeper of an intensity greater than the intensity of normal traffic loading, the loading being applied a number of times sufficient to deform the ballast vertically to cause the sleeper end to be lowered to the desired level, the amount by which the sleeper end is lifted above the desired level prior to the application of the loading being such that the rate of vertical deformation of the ballast bed beneath the sleeper towards said end under renewed traffic loading is acceptably low.
Claim 12
Dependent Claim 15 words
A method as claimed in claim 9, wherein the loading is applied to the sleeper.
Claim 13
Dependent Claim 22 words
A method as claimed in claim 9, wherein the loading is applied to the rail head at a position above the sleeper.
Claim 14
Dependent Claim 30 words
A method as claimed in claim 9, wherein loading is applied towards both ends of the sleeper to cause the whole sleeper to be supported at a desired Lower level.
Claim 15
Dependent Claim 20 words
A method as claimed in claim 12, wherein the loading is applied simultaneously to the ballast towards both sleeper ends.
Claim 16
Dependent Claim 42 words
A method as claimed in claim 12, wherein the loading applied towards one end of the sleeper is different from the loading applied towards the other end in order to cause different vertical deformations of the ballast towards the two sleeper ends.
Claim 17
Dependent Claim 33 words
A method as claimed in claim 12 wherein a different number of loadings are applied towards the two sleeper ends to cause different vertical deformations of the ballast towards the two sleeper ends.

References Cited (Backward Citations)

US3486461A Cited
US3638578A Cited
US3589298A Cited
US3651762A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1977-03-11 1977-09-10 1978-03-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1981-03-11 1981-09-10 1982-03-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1985-03-11 1985-09-10 1986-03-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag