Patent US3770055A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3770055A Expired / Lapsed US ⏱️ 0.0 years remaining

Film forming hydrazine-containing corrosion inhibitor

Assignee: Marathon Oil Co
•
Filing: 1971-10-29
•
Granted: 1973-11-06
•
Expires: 1991-10-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Corrosion rates in oil wells are reduced by injecting the combination of about 2-200 ppm. of a film-forming nitrogencontaining corrosion inhibitor (e.g. an imidazoline compound) and about 0.01-1.0 ppm. of residual hydrazine, the ppm. based on water either produced or injected through the well, e.g. water produced in a gas lift well or water injected into an injection well. Such is especially useful with water injection wells, gas lift wells, etc.

Inventors

  • 👤 A Larsen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 19:21
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/54; C23; C23F; C23F11/00; C23F11/08; Y; Y10; Y10S; Y10S166/00; Y10S166/902; Y10S507/00; Y10S507/939

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 46 words
an acid selected from the group consisting of hydrochloric acid and an organic carboxylic acid containing 1 to about 14 carbon atoms, the ppm based on the water and the amount of injected hydrazine being less than the molecular equivalent of oxygen present in the water.
Claim 2
Dependent Claim 20 words
The process of claim 1 wherein about 0.1 to about 0.5 ppm. of residual hydrazine is injected into the well.
Claim 3
Dependent Claim 23 words
The process of claim 1 wherein about 10 to about 20 ppm. of the film-forming nitrogen-containing corrosion inhibitor is injected into the well.
Claim 4
Dependent Claim 13 words
The process of claim 1 wherein the well is a gas lift well.
Claim 5
Dependent Claim 13 words
The process of claim 1 wherein the well is a water injection well.
Claim 6
Independent Claim 64 words
A method of reducing the corrosion rate in a well and associated conduits and gathering systems wherein water is either produced or injected and the average temperature of the water is up to about 135*F., the method comprising injecting into the well about 0.01 to about 1.0 ppm of residual hydrazine and about 2 to about 200 ppm of a salt obtained by reacting:
Claim 7
Dependent Claim 11 words
The process of claim 6 wherein the acid is acetic acid.
Claim 8
Dependent Claim 13 words
The process of claim 1 wherein the well is a gas lift well.
Claim 9
Dependent Claim 13 words
The process of claim 1 wherein the well is a water injection well.

References Cited (Backward Citations)

CA659624A Cited
US2468163A Cited
US3106525A Cited
US3119447A Cited
US3200071A Cited
US3445441A Cited
US3551349A Cited
US3645896A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-11-05 1977-05-07 1977-11-06 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-11-05 1981-05-07 1981-11-06 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-11-05 1985-05-07 1985-11-06 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag