Patent US3765167A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3765167A Expired / Lapsed US ⏱️ 0.0 years remaining

Power plant process

Assignee: GEA Group AG
•
Filing: 1972-03-06
•
Granted: 1973-10-16
•
Expires: 1992-03-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a turbine power plant, fluid hydrocarbon fuel is first cracked with steam under pressure; the cracked compressed gas is then expanded in a gas turbine to perform work and thereafter burned in a boiler to generate steam to drive a steam turbine. The cracked, compressed gas may also be expanded to an intermediate pressure in a gas turbine to perform work, combusted under pressure, the combusted, compressed gas expanded in a second gas turbine to perform work and then fed to a boiler where the heat of the combusted gas is utilized to generate steam to drive a steam turbine. The cracked, compressed gas may also be fully expanded in a gas turbine to perform work and thereafter combusted and a portion of the hot combustion gas therefrom is fed to a boiler to generate steam to drive a steam turbine and the balance is recycled to an externally heated cracker and then to the boiler.

Inventors

  • 👤 P Rudolph
  • 👤 E Kapp

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 05:49
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01K23/103; F01K25/00; F01K25/08

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 82 words
Power plant process comprising: a. cracking a fluid hydrocarbon fuel with steam and/or air under pressure to form a gaseous mixture high in carbon monoxide and hydrogen; b. expanding the cracked compressed gaseous mixture from (a) to an intermediate pressure in a gas turbine to perform work; c. thereafter combusting said gaseous mixture at said intermediate pressure in a combustion chamber; and d. feeding the hot combustion gas from (c) to a second gas turbine and expanding same therein to perform work.
Claim 2
Dependent Claim 82 words
Power plant process comprising: a. cracking a fluid hydrocarbon fuel with steam and/or air under pressure to form a gaseous mixture high in carbon monoxide and hydrogen; b. expanding the cracked compressed gaseous mixture from (a) to an intermediate pressure in a gas turbine to perform work; c. thereafter combusting said gaseous mixture at said intermediate pressure in a combustion chamber; and d. feeding the hot combustion gas from (c) to a second gas turbine and expanding same therein to perform work.
Claim 3
Dependent Claim 10 words
Process of claim 1 wherein said fuel is catalytically cracked.
Claim 4
Dependent Claim 10 words
Process of claim 1 wherein said fuel is thermally cracked.
Claim 5
Dependent Claim 27 words
Process of claim 1 wherein the expanded combustion gas from said second gas turbine is fed to a boiler to generate steam to drive a steam turbine.
Claim 6
Dependent Claim 18 words
Process of claim 2 wherein the catalyst is heated by the hot combustion gas from said combustion chamber.
Claim 7
Dependent Claim 20 words
Process of claim 3 wherein said fuel is thermally cracked with steam and air in the presence of carbon dioxide.
Claim 8
Dependent Claim 18 words
Process of claim 2 wherein said fuel is catalytically cracked with steam in the presence of carbon dioxide.

References Cited (Backward Citations)

US2605610A Cited
US3320154A Cited
US3329605A Cited
US3304712A Cited
US3355877A Cited
US3374621A Cited
US3325992A Cited
US3505811A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-10-15 1977-04-16 1977-10-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-10-15 1981-04-16 1981-10-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-10-15 1985-04-16 1985-10-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag