Patent US3738103A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3738103A Expired / Lapsed US ⏱️ 0.0 years remaining

Power plant process

Assignee: GEA Group AG
•
Filing: 1970-08-24
•
Granted: 1973-06-12
•
Expires: 1990-08-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a turbine power plant, fluid hydrocarbon fuel is first cracked with steam under pressure; the cracked compressed gas is then expanded in a gas turbine to perform work and thereafter burned in a boiler to generate steam to drive a steam turbine. The cracked, compressed gas may also be expanded to an intermediate pressure in a gas turbine to perform work, combusted under pressure, the combusted, compressed gas expanded in a second gas turbine to perform work and then fed to a boiler where the heat of the combusted gas is utilized to generate stem to drive a steam turbine. The cracked, compressed gas may also be fully expanded in a gas turbine to perform work and thereafter combusted and a portion of the hot combustion gas therefrom is fed to a boiler to generate steam to drive a steam turbine and the balance is recycled to an externally heated cracker and then to the boiler.

Inventors

  • 👤 P Rudolph
  • 👤 E Kapp

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 16:33
CPC Classifications
F; F02; F02C; F02C3/00; F02C3/20; C; C01; C01B; C01B3/00; C01B3/02; C01B3/22; C01B3/32; C01B3/34; C01B3/36; C01B3/38; C01B3/386; F01; F01K; F01K3/00; F01K3/18; F01K3/188; Y; Y02; Y02P; Y02P20/00; Y02P20/10; Y02P20/129

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 80 words
Power plant process comprising a. cracking a fluid hydrocarbon fuel with steam and/or air under pressure to form a gaseous mixture high in carbon monoxide and hydrogen; b. expanding the cracked compressed gaseous mixture from (a) in a gas turbine to perform work; c. thereafter combusting the expanded gaseous mixture from (b) to produce combustion gases; and d. feeding at least a portion of the combustion gases from (c) to a boiler to generate steam to drive a steam turbine.
Claim 2
Dependent Claim 80 words
Power plant process comprising a. cracking a fluid hydrocarbon fuel with steam and/or air under pressure to form a gaseous mixture high in carbon monoxide and hydrogen; b. expanding the cracked compressed gaseous mixture from (a) in a gas turbine to perform work; c. thereafter combusting the expanded gaseous mixture from (b) to produce combustion gases; and d. feeding at least a portion of the combustion gases from (c) to a boiler to generate steam to drive a steam turbine.
Claim 3
Dependent Claim 10 words
Process of claim 1 wherein said fuel is catalytically cracked.
Claim 4
Dependent Claim 10 words
Process of claim 1 wherein said fuel is thermally cracked.
Claim 5
Dependent Claim 40 words
Process of claim 1 wherein the balance of the combustion gases from (c) is fed to an indirectly heated cracker wherein said fluid hydrocarbon fuel is cracked and then to a boiler to generate steam to drive a steam turbine.

References Cited (Backward Citations)

US1659930A Cited
US2960823A Cited
US3208832A Cited
US3320154A Cited
US3329605A Cited
US3304712A Cited
US3325992A Cited
US3505811A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-06-11 1976-12-11 1977-06-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-06-11 1980-12-11 1981-06-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-06-11 1984-12-11 1985-06-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag