Abstract

Abstract The method of making frames and frame units for modules of modular building includes steps of punching perimeter beams to form stops on the beams where cross-beams are to be located, and assembling the cross-beams with a pair of the perimeter beams by butting the ends of the cross-beams against corresponding stops to position the cross-beams without using jigs or fixtures to establish their positions. Retainers may be formed in the perimeter beams next to the stops to temporarily retain the cross-beams in place until they are welded to the perimeter beams. In some frame units, the perimeters beams and cross-beams are metal channels, and the beams are assembled flange-to-flange and web-to-web. One weld is made to connect each abutting pair of flanges next to the webs, and another weld is made at a point separated farther from the webs so that the webs reinforce each other and the flanges reinforce each other. Cross-beams may also be welded to the stops on the perimeter beams. The invention includes the frame units, part of the strength and load handling capabilities of which are derived from particular arrangements of stops and welds.

Inventors

  • 👤 M Evans
  • 👤 V Brown
  • 👤 R Mora

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 21:57
CPC Classifications
E; E04; E04C; E04C2/00; E04C2/30; E04C2/38; E04C2/384; Y; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/49616; Y10T29/49623; Y10T29/49625; Y10T29/49627; Y10T29/49826; Y10T29/49904

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 164 words
A method of constructing a frame unit for a module of a building comprising the steps of a. providing perimeter beams with projecting stops spaced along the length of the beams at selected positions where cross-beams are to be located in a completed module frame, b. retaining a pair of said perimeter beams parallel to each other and spaced apart by a dimension of a frame unit for a building module, c. placing a plurality of cross-beams perpendicularly between said perimeter beams and parallel to each other and butting each cross-beam against a respective one of said stops at each end of the cross-beam to accurately position the cross-beam without jigs or fixtures to establish that position, d. fixing the perimeter beams and the cross-beams to each other at the ends of said cross-beams to form frame units, e. assembling a plurality of said frame units with each other to form a module frame for a building, and f. securing the frame units together.
Claim 2
Independent Claim 164 words
A method of constructing a frame unit for a module of a building comprising the steps of a. providing perimeter beams with projecting stops spaced along the length of the beams at selected positions where cross-beams are to be located in a completed module frame, b. retaining a pair of said perimeter beams parallel to each other and spaced apart by a dimension of a frame unit for a building module, c. placing a plurality of cross-beams perpendicularly between said perimeter beams and parallel to each other and butting each cross-beam against a respective one of said stops at each end of the cross-beam to accurately position the cross-beam without jigs or fixtures to establish that position, d. fixing the perimeter beams and the cross-beams to each other at the ends of said cross-beams to form frame units, e. assembling a plurality of said frame units with each other to form a module frame for a building, and f. securing the frame units together.
Claim 3
Dependent Claim 30 words
The method as claimed in claim 1 in which said beams are metal and step (d) is carried out by welding the ends of said cross-beams to said perimeter beams.
Claim 4
Dependent Claim 20 words
The method as claimed in claim 2 in which the ends of said cross-beams are welded to said respective stops.
Claim 5
Dependent Claim 70 words
The method as claimed in claim 2 in which said perimeter beams and said cross-beams are channels, and step (d) is carried out by welding the flanges of the cross-beam channels to the flanges of the perimeter beam channels with a weld next to the webs of the channels and another weld spaced outwardly from the webs so that the webs reinforce each other and the flanges reinforce each other.
Claim 6
Dependent Claim 37 words
The method as claimed in claim 4 in which the webs of said cross-beam channels are also welded to the stops on said perimeter beams which stops are located in the webs of said perimeter beam channels.
Claim 7
Dependent Claim 29 words
The method as claimed in claim 1 in which said beams are metal and step (a) is carried out by punching said perimeter beams to form said projecting stops.
Claim 8
Dependent Claim 27 words
The method as claimed in claim 4 in which said perimeter beams are passed through a punching device to sequentially form said projecting stops by successive punching.
Claim 9
Independent Claim 126 words
A method of constructing a frame for a module of a building comprising the steps of providing tabs on perimeter beams at selected points spaced along the length thereof at predetermined positions where cross-beams are to be located in a completed module frame, assembling cross-beams with and between pairs of perimeter beams to form frame unit including placing each cross-beam of a frame unit against a tab of a perimeter beam at each end of the cross-beam to accurately position each cross-beam at the pre-selected location without jigs or fixtures for positioning of the cross-beams, fixing the perimeter beams and the cross-beams of each frame unit to each other, assembling a plurality of frame units to form a module frame, and securing the frame units together.
Claim 10
Independent Claim 126 words
A method of constructing a frame for a module of a building comprising the steps of providing tabs on perimeter beams at selected points spaced along the length thereof at predetermined positions where cross-beams are to be located in a completed module frame, assembling cross-beams with and between pairs of perimeter beams to form frame unit including placing each cross-beam of a frame unit against a tab of a perimeter beam at each end of the cross-beam to accurately position each cross-beam at the pre-selected location without jigs or fixtures for positioning of the cross-beams, fixing the perimeter beams and the cross-beams of each frame unit to each other, assembling a plurality of frame units to form a module frame, and securing the frame units together.
Claim 11
Independent Claim 107 words
A method of constructing a frame unit for a module of a building comprising punching metal perimeter beams at selected points spaced along the length thereof to form tabs with retainers at predetermined positions where cross-beams are to be located in a completed module frame, assembling metal cross-beams with and between pairs of perimeter beams to form frame units, each cross-beam of a frame unit being place between a tab and a retainer of a perimeter beam at each end of the cross-beam to accurately position the cross-beam at the selected position, and welding the perimeter beams and the cross-beams of each frame unit to each other.
Claim 12
Independent Claim 107 words
A method of constructing a frame unit for a module of a building comprising punching metal perimeter beams at selected points spaced along the length thereof to form tabs with retainers at predetermined positions where cross-beams are to be located in a completed module frame, assembling metal cross-beams with and between pairs of perimeter beams to form frame units, each cross-beam of a frame unit being place between a tab and a retainer of a perimeter beam at each end of the cross-beam to accurately position the cross-beam at the selected position, and welding the perimeter beams and the cross-beams of each frame unit to each other.
Claim 13
Independent Claim 108 words
A method of constructing a frame for a module of a building comprising punching metal perimeter beams at selected points spaced along the length thereof to form tabs at predetermined positions where cross-beams are to be located, assembling metal cross-beams with and between pairs of perimeter beams to form frame units including placing each cross-beam of a frame unit against a tab of a perimeter beam at each end of the cross-beam to accurately position the cross-beam, welding the perimeter beams and the cross-beams of each frame unit to each other, assembling a plurality of frame units to form a module frame, and welding the frame units together.
Claim 14
Independent Claim 108 words
A method of constructing a frame for a module of a building comprising punching metal perimeter beams at selected points spaced along the length thereof to form tabs at predetermined positions where cross-beams are to be located, assembling metal cross-beams with and between pairs of perimeter beams to form frame units including placing each cross-beam of a frame unit against a tab of a perimeter beam at each end of the cross-beam to accurately position the cross-beam, welding the perimeter beams and the cross-beams of each frame unit to each other, assembling a plurality of frame units to form a module frame, and welding the frame units together.

References Cited (Backward Citations)

US2275109A Cited
US3604176A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1976-03-19 1976-09-18 1977-03-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1980-03-19 1980-09-18 1981-03-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1984-03-19 1984-09-18 1985-03-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag