US3685456A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for the continuous replacement of an old track by a new track
Assignee: Franz Plasser Bahnbaumaschinen Industrie GmbH
•
Filing: 1970-09-23
•
Granted: 1972-08-22
•
Expires: 1990-09-23
Abstract
Abstract A train assembly is moved continuously along a right of way during a track renewal or replacement operation, with a first train section of cars moving on the old track rails and a second train section of cars moving on the new track. In an intermediate trackless section, the ballast is removed, cleaned and redistributed before the ties of the new track are laid while the train assembly advances continuously. The two train sections are held apart a predetermined distance to keep the length of the intermediate track section constant. A
Inventors
- 👤 Franz Plasser
- 👤 Josef Theurer
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-23 14:35
CPC Classifications
E; E01; E01B; E01B27/00; E01B27/06; E01B27/11; E01B29/00; E01B29/05
Claims Analysis
Total Claims: 16
Claim 1
Independent Claim
243 words
In a method for replacement of an old track by a new track consisting of track parts including two rails and ties supporting the rails on ballast, the steps of continuously advancing cars transporting and supporting the track parts of the old and new tracks along said tracks during the replacement, said replacement comprising continuously loosening sequential portions of the rails from the ties of the old track as the cars continuously advance, lifting and spreading the rails substantially without friction after they have been loosened, continuously and sequentially removing the ties of the old track from the ballast to provide a trackless ballast section where the rails have been lifted and spread, continuously and sequentially placing the ties of the new track upon the ballast at the end of the trackless ballast section, said trackless ballast section being of constant length and continuously advancing with the advancing cars during the replacement, continuously removing sequential portions of the ballast from the trackless ballast section during said continuous advancement, cleaning the removed ballast, continuously returning cleaned portions of the ballast to the trackless ballast section, substantially uniformly distributing and leveling the cleaned ballast before the ties of the new track are placed thereon, lowering sequential portions of the rails of the new track and moving them together to assume the gage of the new track substantially without friction, and fastening the lowered rails to the ties of the new track during said continuous advancement.
Claim 2
Dependent Claim
243 words
In a method for replacement of an old track by a new track consisting of track parts including two rails and ties supporting the rails on ballast, the steps of continuously advancing cars transporting and supporting the track parts of the old and new tracks along said tracks during the replacement, said replacement comprising continuously loosening sequential portions of the rails from the ties of the old track as the cars continuously advance, lifting and spreading the rails substantially without friction after they have been loosened, continuously and sequentially removing the ties of the old track from the ballast to provide a trackless ballast section where the rails have been lifted and spread, continuously and sequentially placing the ties of the new track upon the ballast at the end of the trackless ballast section, said trackless ballast section being of constant length and continuously advancing with the advancing cars during the replacement, continuously removing sequential portions of the ballast from the trackless ballast section during said continuous advancement, cleaning the removed ballast, continuously returning cleaned portions of the ballast to the trackless ballast section, substantially uniformly distributing and leveling the cleaned ballast before the ties of the new track are placed thereon, lowering sequential portions of the rails of the new track and moving them together to assume the gage of the new track substantially without friction, and fastening the lowered rails to the ties of the new track during said continuous advancement.
Claim 3
Dependent Claim
11 words
The method of claim 1, whereiN the cleaned ballast is compacted.
Claim 4
Dependent Claim
28 words
The method of claim 1, wherein other cleaned portions of the ballast are distributed in the cribs between the ties of the new track during said continuous advancement.
Claim 5
Dependent Claim
36 words
The method of claim 1, further comprising the step of controlling the contour of the uniformly distributed and leveled cleaned ballast in the trackless ballast section during the continuous advancement by means of a reference system.
Claim 6
Dependent Claim
22 words
The method of claim 4, wherein the removal of the sequential portions of the ballast is also controlled by said reference system.
Claim 7
Independent Claim
243 words
An apparatus for replacement of an old track by a new track consisting of track parts including two rails and ties supporting the rails on ballast, comprising a train assembly continuously moving along a right of way during replacement; the right of way consisting of a section of old track, a section of new track and a trackless intermediate section wherein the old track is replaced by the new track; the train assembly consisting of a first train section of cars moving on the old track rails, a second train section of cars moving on the new track rails, an intermediate train section bridging the trackless intermediate section of the right of way, means for linking the intermediate train section respectively to the first and second train sections to interconnect the same for common movement, and said intermediate train section including means for maintaining the respective linking means at a predetermined distance in the direction of the right of way, and associated therewith means for removing ballast from the trackless intermediate section, cleaning the removed ballast, and redistributing the cleaned ballast; and means on respective ones of said cars for transporting and supporting at least the ties of the old and new tracks, for respectively receiving at least the ties of the old track and laying at least the ties of the new track, and for guiding without substantial friction the track rails bridging the intermediate trackless section of the right of way.
Claim 8
Independent Claim
243 words
An apparatus for replacement of an old track by a new track consisting of track parts including two rails and ties supporting the rails on ballast, comprising a train assembly continuously moving along a right of way during replacement; the right of way consisting of a section of old track, a section of new track and a trackless intermediate section wherein the old track is replaced by the new track; the train assembly consisting of a first train section of cars moving on the old track rails, a second train section of cars moving on the new track rails, an intermediate train section bridging the trackless intermediate section of the right of way, means for linking the intermediate train section respectively to the first and second train sections to interconnect the same for common movement, and said intermediate train section including means for maintaining the respective linking means at a predetermined distance in the direction of the right of way, and associated therewith means for removing ballast from the trackless intermediate section, cleaning the removed ballast, and redistributing the cleaned ballast; and means on respective ones of said cars for transporting and supporting at least the ties of the old and new tracks, for respectively receiving at least the ties of the old track and laying at least the ties of the new track, and for guiding without substantial friction the track rails bridging the intermediate trackless section of the right of way.
Claim 9
Dependent Claim
21 words
The apparatus of claim 6, wherein the means for redistributing the cleaned ballast includes means for leveling and compacting the ballast.
Claim 10
Dependent Claim
28 words
The apparatus of claim 6, wherein the means for removing, cleaning and redistributing the ballast is mounted on the means for maintaining the distance between the linking means.
Claim 11
Dependent Claim
24 words
The apparatus of claim 6, further comprising means for conveying portions of the cleaned ballast to cribs between the ties of the new track.
Claim 12
Dependent Claim
13 words
The apparatus of claim 9, wherein said conveying means includes laterally pivotal conveyors.
Claim 13
Dependent Claim
63 words
The apparatus of claim 9, wherein said conveying means includes a means for depositing the conveyed portions of the cleaned ballast in selected ones of said cribs, the apparatus comprising means for fastening the rails of the new track to the newly laid ties, said ballast depositing means having an outlet end behind said fastening means in the working direction of the apparatus.
Claim 14
Dependent Claim
59 words
The apparatus of claim 6, further comprising a reference system including a reference line extending from the old track to the means for removing and redistributing the ballast, and sensing means cooperating with the reference line at said ballast removing and redistributing means for sensing the height of the ballast bed after removal and redistribution of the ballast, respectively.
Claim 15
Dependent Claim
21 words
The apparatus of claim 12, wherein the reference system further includes means for sensing the lateral alignment of the ballast bed.
Claim 16
Dependent Claim
30 words
The apparatus of claim 13, wherein the reference line is a beam of radiated energy and the sensing means includes stop and receiving means in the path of the beam.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1975-08-22 | 1976-02-21 | 1976-08-22 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1979-08-22 | 1980-02-21 | 1980-08-22 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1983-08-22 | 1984-02-21 | 1984-08-22 | $7700.00 | Window Closed / Lapsed |