← Back to Patent Explorer
US3286648A Expired / Lapsed US ⏱️ 0.0 years remaining

Rail renewal process

Assignee: Individual
•
Filing: 1963-08-30
•
Granted: 1966-11-22
•
Expires: 1983-08-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Brosnan Dennis William

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 14:02
CPC Classifications
E; E01; E01B; E01B29/00; E01B29/05

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 203 words
A METHOD FOR REPLACING THE RAILS ON THE EXISTING TIES OF A TRACK STRUCTURE WITH CONTINUOUS RIBBON RAILS COMPRISING THE STEPS OF: LAYING THE NEW RAILS AT A NARROW GAUGE BETWEEN THE OLD RAILS OF THE STANDARD GAUGE TRACK TO FORM A SERVICE TRACK; REMOVING SPIKES AND RAIL ANCHORS FROM THE STANDARD GAUGE TRACK; CLEANING THE ENDS OF THE TIES OF THE TRACK STRUCTURE OUTWARDLY OF EACH OF THE RAILS OF THE STANDARD GAUGE TRACK; MOVING THE OLD RAILS RESPECTIVELY OUTWARDLY ONTO THE CLEANED ENDS OF THE TIES; GAUGING THE OLD RAILS AT A PREDETERMINED WIDE GAUGE TO FORM A SECOND SERVICE TRACK; REMOVING OLD TIE PLATES AND RE-CONDITIONING THE SURFACE OF THE TIES IN THE AREAS OF THE REMOVED OLD TIE PLATES; INSTALLING NEW TIE PLATES ON THE RE-CONDITIONED SURFACES OF THE TIES AND GAUGING THE POSITION OF THE SAME FROM THE RAILS OF THE NARROW GAUGE SERVICE TRACK; SPREADING THE NEW RAILS FROM THEIR NARROW GAUGE POSITION TO A POSITION ON THE TIE PLATES; THEN GAUGING THE NEW RAILS TO STANDARD GAUGE AND SPIKING AND ANCHORING THE NEW RAILS TO THE TIES; AND THEN REMOVING THE OLD RAILS CONTINUOUSLY ONTO EQUIPMENT CARRIED ON THE NEW RAILS OF THE STANDARD GAUGE TRACK.
Claim 2
Independent Claim 203 words
A METHOD FOR REPLACING THE RAILS ON THE EXISTING TIES OF A TRACK STRUCTURE WITH CONTINUOUS RIBBON RAILS COMPRISING THE STEPS OF: LAYING THE NEW RAILS AT A NARROW GAUGE BETWEEN THE OLD RAILS OF THE STANDARD GAUGE TRACK TO FORM A SERVICE TRACK; REMOVING SPIKES AND RAIL ANCHORS FROM THE STANDARD GAUGE TRACK; CLEANING THE ENDS OF THE TIES OF THE TRACK STRUCTURE OUTWARDLY OF EACH OF THE RAILS OF THE STANDARD GAUGE TRACK; MOVING THE OLD RAILS RESPECTIVELY OUTWARDLY ONTO THE CLEANED ENDS OF THE TIES; GAUGING THE OLD RAILS AT A PREDETERMINED WIDE GAUGE TO FORM A SECOND SERVICE TRACK; REMOVING OLD TIE PLATES AND RE-CONDITIONING THE SURFACE OF THE TIES IN THE AREAS OF THE REMOVED OLD TIE PLATES; INSTALLING NEW TIE PLATES ON THE RE-CONDITIONED SURFACES OF THE TIES AND GAUGING THE POSITION OF THE SAME FROM THE RAILS OF THE NARROW GAUGE SERVICE TRACK; SPREADING THE NEW RAILS FROM THEIR NARROW GAUGE POSITION TO A POSITION ON THE TIE PLATES; THEN GAUGING THE NEW RAILS TO STANDARD GAUGE AND SPIKING AND ANCHORING THE NEW RAILS TO THE TIES; AND THEN REMOVING THE OLD RAILS CONTINUOUSLY ONTO EQUIPMENT CARRIED ON THE NEW RAILS OF THE STANDARD GAUGE TRACK.

References Cited (Backward Citations)

US1317813A Cited
US758524A Cited
US1286495A Cited
US1283621A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-11-21 1970-05-23 1970-11-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-11-21 1974-05-23 1974-11-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-11-21 1978-05-23 1978-11-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag