← Back to Patent Explorer
US3602310A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of increasing the permeability of a subterranean hydrocarbon bearing formation

Assignee: Tenneco Oil Co
•
Filing: 1970-01-15
•
Granted: 1971-08-31
•
Expires: 1990-01-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of increasing the permeability of a subterranean hydrocarbon bearing formation penetrated by a wellbore and includes inducing a primary horizontal fracture in the formation which preferably extends from an injection well to a producing well. A system of microfractures is caused to be formed in a direction normal to the major fracture by cooling the formation by the introduction of a cryogenic fluid and by subsequently heating the formation adjacent to the primary fracture.

Inventors

  • 👤 William G Halbert

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 22:31
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/2405; E21B43/25; E21B43/26; E21B43/2605

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 15 words
The invention as claimed in claim 1 wherein: said cooling fluid is a cryogenic liquid.
Claim 2
Dependent Claim 33 words
The invention as claimed in claim 1 wherein: said formation is heated during said heating step by injecting a hot fluid into said primary fracture, whereby said microfractures are caused by thermal shock.
Claim 3
Dependent Claim 25 words
The invention as claimed in claim 3 wherein: the difference in temperature between said cooling fluid and said hot fluid is at least 800* F.
Claim 4
Dependent Claim 21 words
The invention as claimed in claim 1 including: alternately repeating said cooling and heating steps to thereby further extend said microfractures.
Claim 5
Dependent Claim 35 words
The invention as claimed in claim 1 wherein: said formation is penetrated by a production well, and said primary fracture is extended between said injection well and said production well during said primary fracturing step.
Claim 6
Dependent Claim 66 words
The invention as claimed in claim 1 wherein: said cooling fluid is a cryogenic liquid; and said formation is heated during said heating step by injecting a hot fluid into said primary fracture, which hot fluid is at least about 800* F. higher in temperature than said cryogenic liquid, to thereby subject said formation adjacent said primary fracture to thermal shock to thereby cause said microfractures.
Claim 7
Dependent Claim 16 words
The invention as claimed in claim 7 wherein: said hot fluid is A form of water.
Claim 8
Dependent Claim 21 words
The invention as claimed in claim 7 including: alternately repeating said cooling and heating steps to thereby further extend said microfractures.

References Cited (Backward Citations)

CA646982A Cited
US2661066A Cited
US2859818A Cited
US3108636A Cited
US3152651A Cited
US3195634A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1974-08-30 1975-03-01 1975-08-31 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1978-08-30 1979-03-01 1979-08-31 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1982-08-30 1983-03-01 1983-08-31 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag