← Back to Patent Explorer
US2859818A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of recovering petroleum

Assignee: Pan American Petroleum Corp
•
Filing: 1956-08-20
•
Granted: 1958-11-11
•
Expires: 1976-08-20
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Howard N Hall
  • 👤 Rue John W La

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 20:48
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/17

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 126 words
A METHOD OF RECOVERING PETROLEUM FROM AN UNDERGROUND FORMATION HAVING IN COMMUNICATION THEREWITH A PLURALITY OF WELLS, SAID FORMATION HAVING A FIRST PERMEABLE FLOW CHANNEL IN THE LOWER PORTION THEREOF AND A SECOND PERMEABLE FLOW CHANNEL IN THE UPPER PORTION THEREOF, SAID FIRST PERMEABLE FLOW CHANNEL INCLUDING AT LEAST ONE FORMATION FRACTURE EXTENDING FROM AT LEAST ONE OF SAID WELLS SUBSTANTIALLY PARALLEL TO THE BOTTOM OF SAID FORMATION TOWARD AT LEAST ONE OF THE REMAINING WELLS, WHICH COMPRISES INJECTING A PETROLEUM SOLVENT INTO AT LEAST ONE OF SAID WELLS, AND INTO SAID SECOND PERMEABLE FLOW CHANNEL WHEREBY SAID SOLVENT CONTACTS SAID FORMATION BELOW SAID SECOND FLOW CHANNEL DILUTING RESIDUAL PETROLEUM THEREIN, PREVETING FLOW OF SAID SOLVENT THROUGH SAID SECOND FLOW CHANNEL DIRECTLY TO ANOTHER WELL, ALLOW-
Claim 2
Independent Claim 126 words
A METHOD OF RECOVERING PETROLEUM FROM AN UNDERGROUND FORMATION HAVING IN COMMUNICATION THEREWITH A PLURALITY OF WELLS, SAID FORMATION HAVING A FIRST PERMEABLE FLOW CHANNEL IN THE LOWER PORTION THEREOF AND A SECOND PERMEABLE FLOW CHANNEL IN THE UPPER PORTION THEREOF, SAID FIRST PERMEABLE FLOW CHANNEL INCLUDING AT LEAST ONE FORMATION FRACTURE EXTENDING FROM AT LEAST ONE OF SAID WELLS SUBSTANTIALLY PARALLEL TO THE BOTTOM OF SAID FORMATION TOWARD AT LEAST ONE OF THE REMAINING WELLS, WHICH COMPRISES INJECTING A PETROLEUM SOLVENT INTO AT LEAST ONE OF SAID WELLS, AND INTO SAID SECOND PERMEABLE FLOW CHANNEL WHEREBY SAID SOLVENT CONTACTS SAID FORMATION BELOW SAID SECOND FLOW CHANNEL DILUTING RESIDUAL PETROLEUM THEREIN, PREVETING FLOW OF SAID SOLVENT THROUGH SAID SECOND FLOW CHANNEL DIRECTLY TO ANOTHER WELL, ALLOW-

References Cited (Backward Citations)

US2734579A Cited
US2107007A Cited
US2412765A Cited
USRE23733E Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1961-11-10 1962-05-12 1962-11-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1965-11-10 1966-05-12 1966-11-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1969-11-10 1970-05-12 1970-11-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag