Patent US3589135A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3589135A Expired / Lapsed US ⏱️ 0.0 years remaining

Trenchless laying of underground pipes

Assignee: Individual
•
Filing: 1969-03-13
•
Granted: 1971-06-29
•
Expires: 1989-03-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of laying lengths of underground pipe, for example drainage pipes, by forming an underground tunnel by means of a mole plough, and drawing a length of pipe into the tunnel into its required final position, characterized in that a liquid slurry is injected into the tunnel formed by the mole before the pipe length is drawn into the tunnel, the slurry serving to lubricate the pipe during its travel along the tunnel. Preferably the principal ingredient of the slurry is Bentonite. The pipe may be towed directly behind the mole and drawn progressively into the tunnel as it is formed or the pipe may be drawn into the slurry-filled tunnel after the mole plough has completed its traverse.

Inventors

  • 👤 Ainsley Neville Ede

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 18:44
CPC Classifications
E; E02; E02F; E02F5/00; E02F5/02; E02F5/10; E02F5/101; E02F5/102; F; F16; F16L; F16L1/00; F16L1/024; F16L1/028; F16L1/032

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 185 words
A method of laying a length of underground pipe in situ, which comprises forming a generally horizontal underground tunnel by forcing the mole of a mole plough through the ground, towing an expander behind the advancing mole to expand the cross section of the underground tunnel, and towing a length of pipe behind the expander along the expanded tunnel into its required final position, the pipe being of smaller cross section than the expander so that an annular-section clearance is defined between the exterior of the pipe length and the interior surface of the expander tunnel, and simultaneously extruding a thixotropic slurry of Bentonite and water under positive pressure through an extrusion orifice in the advancing expander and into the said annular clearance around the advancing pipe length to fill the said clearance with an annular layer of said thixotropic slurry through which the pipe length advances behind the expander as said tunnel is progressively formed and expanded, the slurry being pumped to the extrusion orifice by means of a positivedisplacement pump from a reservoir above ground through a duct extending down to the expander.
Claim 2
Independent Claim 185 words
A method of laying a length of underground pipe in situ, which comprises forming a generally horizontal underground tunnel by forcing the mole of a mole plough through the ground, towing an expander behind the advancing mole to expand the cross section of the underground tunnel, and towing a length of pipe behind the expander along the expanded tunnel into its required final position, the pipe being of smaller cross section than the expander so that an annular-section clearance is defined between the exterior of the pipe length and the interior surface of the expander tunnel, and simultaneously extruding a thixotropic slurry of Bentonite and water under positive pressure through an extrusion orifice in the advancing expander and into the said annular clearance around the advancing pipe length to fill the said clearance with an annular layer of said thixotropic slurry through which the pipe length advances behind the expander as said tunnel is progressively formed and expanded, the slurry being pumped to the extrusion orifice by means of a positivedisplacement pump from a reservoir above ground through a duct extending down to the expander.
Claim 3
Dependent Claim 57 words
A method as claimed in claim 1, in which an expander of generally flared form is attached at its smaller end to the mole immediately in front of the pipe length and is towed through the tunnel with the pipe length so as to expand the tunnel before the main part of the pipe length enters it.
Claim 4
Dependent Claim 56 words
A method as claimed in claim 2 wherein the leading end of the pipe is connected to the expander by means of a releasable catch, which can be released by releasing means located above ground level, whereby at the end of the pipe-laying run the pipe can be detached from the mole plough coulter whilst underground.
Claim 5
Independent Claim 139 words
A method of laying lengths of underground pipe by forming an underground tunnel by means of a mole plough, and drawing a length of pipe into the tunnel into its required final position, characterized in that a liquid slurry is injected into the tunnel formed by the mole before the pipe length is drawn into the tunnel, the slurry serving to lubricate the pipe during its travel along the tunnel, the principal ingredient of the slurry being Bentonite, the slurry comprising a mixture of Bentonite and soil in water, forming a gel having thixotropic properties, and in which a mixture of Bentonite and water is delivered separately into the tunnel by a positive displacement pump and is there mixed in place with the soil of the tunnel wall by means of an underground mechanical mixer towed behind the mole.
Claim 6
Independent Claim 139 words
A method of laying lengths of underground pipe by forming an underground tunnel by means of a mole plough, and drawing a length of pipe into the tunnel into its required final position, characterized in that a liquid slurry is injected into the tunnel formed by the mole before the pipe length is drawn into the tunnel, the slurry serving to lubricate the pipe during its travel along the tunnel, the principal ingredient of the slurry being Bentonite, the slurry comprising a mixture of Bentonite and soil in water, forming a gel having thixotropic properties, and in which a mixture of Bentonite and water is delivered separately into the tunnel by a positive displacement pump and is there mixed in place with the soil of the tunnel wall by means of an underground mechanical mixer towed behind the mole.
Claim 7
Independent Claim 160 words
A method of laying a length of underground pipe in situ which comprises forming a generally horizontal underground tunnel of appreciably greater cross-sectional area than the pipe to be laid therein by forcing the mole of a mole plough through the ground, whilst simultaneously extruding a thixotropic slurry of Bentonite and water under positive pressure into the tunnel through an extrusion orifice at the rear of the advancing mole to fill the tunnel completely with pressurized slurry as the tunnel is progressively formed behind the advancing mole, and, subsequently, drawing a length of pipe by means of a cable and winch along the length of the preformed tunnel and through the filling of slurry therein into the required final position of the pipe length, the pipe length being drawn lengthwise through the filling of slurry which forms an annular layer of slurry surrounding the pipe length and separating it from the wall of the tunnel as the pipe length advances.
Claim 8
Independent Claim 160 words
A method of laying a length of underground pipe in situ which comprises forming a generally horizontal underground tunnel of appreciably greater cross-sectional area than the pipe to be laid therein by forcing the mole of a mole plough through the ground, whilst simultaneously extruding a thixotropic slurry of Bentonite and water under positive pressure into the tunnel through an extrusion orifice at the rear of the advancing mole to fill the tunnel completely with pressurized slurry as the tunnel is progressively formed behind the advancing mole, and, subsequently, drawing a length of pipe by means of a cable and winch along the length of the preformed tunnel and through the filling of slurry therein into the required final position of the pipe length, the pipe length being drawn lengthwise through the filling of slurry which forms an annular layer of slurry surrounding the pipe length and separating it from the wall of the tunnel as the pipe length advances.
Claim 9
Dependent Claim 76 words
A method as claimed in claim 5, in which an expander of generally flared form and provided with at least one passage for the flow of slurry therethrough is pivotally attached at its smaller end to the pipe-drawing cable immediately in front of the pipe length and is towed through the tunnel with the pipe length so as to expand the newly formed and slurry-filled tunnel befoRe the main part of the pipe length enters it.

References Cited (Backward Citations)

US1303399A Cited
US996866A Cited
US1314279A Cited
US1765185A Cited
US1904666A Cited
US3100381A Cited
GB976421A Cited
US3214920A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1974-06-28 1974-12-28 1975-06-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1978-06-28 1978-12-28 1979-06-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1982-06-28 1982-12-28 1983-06-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag