US3584848A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for producing cement clinker
Assignee: Union Carbide Corp
•
Filing: 1969-05-21
•
Granted: 1971-06-15
•
Expires: 1989-05-21
Abstract
Abstract Cement-forming raw materials are introduced into a swirling stream of hot gas in a cylindrical reaction zone where the raw materials react to form clinkers and where the gas stream holds the clinker particles in suspension until the particles grow heavy enough to drop to the lower portion of the reaction zone. Apparatus suitable for carrying out the process is also described.
Inventors
- 👤 Kazuo Kiyonaga
- 👤 Peter Wrampe
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-31 17:52
CPC Classifications
C; C04; C04B; C04B7/00; C04B7/36; C04B7/43; C04B7/44
Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
45 words
introducing tangentially into or forming by the combustion of a fuel and an oxidant in said reaction zone at a point in the lower portion thereof at least one stream of hot gas at a temperature sufficiently high to cause clinkering of cement-forming raw materials,
Claim 2
Dependent Claim
21 words
The process is accordance with claim 1 wherein said cement-forming raw materials are calcined prior to introduction into said reaction zone.
Claim 3
Dependent Claim
43 words
at least one means disposed in the lower portion of said reactor for tangentially introducing into or forming in said reactor at least one stream of hot gas and for directing said stream of hot gas circumferentially around the periphery of said reactor;
Claim 4
Dependent Claim
15 words
at least one gas outlet means in said reactor disposed above said gas inlet means;
Claim 5
Dependent Claim
29 words
The process in accordance with claim 1 wherein at least two streams of hot gas are introduced or formed in said reaction zone at at least two different levels.
Claim 6
Dependent Claim
56 words
directing said stream of hot gas circumferentially around the periphery of said reaction zone and removing said stream of hot gas from said reaction zone near the upper portion thereof, said hot gas forming a generally upwardly spiralling helical stream without significant reverse flow from the upper portion toward the lower portion of said reaction zone,
Claim 7
Dependent Claim
105 words
introducing cement-forming raw materials into said hot gas stream in said reaction zone at a point no lower than the lowest point of introduction or forMation of said hot gas stream, whereby said cement-forming raw materials react to form clinkers and whereby the centrifugal force of said gas stream maintains the clinker particles in suspension until said particles grow to sufficient size so that their weight is sufficient to overcome the upward component of force of said hot gas stream and said clinker particles drop to the portion of said reaction zone blow the lowest point of introduction or formation of said hot gas stream.
Claim 8
Dependent Claim
27 words
The process in accordance with claim 3 wherein the lowest of said gas streams is directed upwardly from the horizontal at an angle of less than 10*.
Claim 9
Dependent Claim
30 words
at least one means for introducing cement-forming raw materials into said reactor disposed at the same level or above the lowest of said hot gas introducing or forming means; and
Claim 10
Dependent Claim
19 words
means disposed below the lowest of said gas introducing or forming means for removing cement clinker from said reactor;
Claim 11
Dependent Claim
10 words
Apparatus suitable for the production of cement clinker which comprises:
Claim 12
Dependent Claim
40 words
Apparatus in accordance with claim 5 wherein said gas introducing or forming means are located in said frustoconical sections and said cement-forming raw material introducing means is located near the top of the uppermost of said right circular cylindrical sections.
Claim 13
Dependent Claim
145 words
said reactor comprising two or more right circular cylindrical sections disposed one above the other, the lowest of said right circular cylindrical sections having the smallest diameter and the diameter of each right circular cylindrical section being larger than the diameter of the next lowest right circular cylindrical section, said right circular cylindrical sections being connected to each other or to said cement clinker removal means, as the case may be, by frustoconical sections such that said frustoconical sections and right circular cylindrical sections form a continuous reactor shell; and said means for introducing or forming hot gas in said reactor and for introducing cement-forming raw materials into said reactor being disposed near the frustoconical sections below each right circular cylindrical section, except that additional gas introduction or forming means and/or cement-forming raw material introducing means may be disposed along said right circular cylindrical sections.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1974-06-14 | 1974-12-14 | 1975-06-15 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1978-06-14 | 1978-12-14 | 1979-06-15 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1982-06-14 | 1982-12-14 | 1983-06-15 | $7700.00 | Window Closed / Lapsed |