Patent US3367083A successfully refreshed from Google Patents.
US3367083A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Circular building structure
Assignee: Individual
•
Filing: 1966-07-08
•
Granted: 1968-02-06
•
Expires: 1986-07-08
Abstract
No abstract record available.
Inventors
- 👤 Billy L Woods
- 👤 Richard L Cook
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-25 16:49
CPC Classifications
E; E04; E04H; E04H7/00; E04H7/02; E04H7/04; E04H7/06
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
132 words
THE METHOD OF CONSTRUCTING A CIRCULAR BUILDING COMPRISING THE STEPS OF: (A) SECURING A VERTICALLY DISPOSED CENTRAL LOCATED CONSTRUCTION POST IN THE GROUND, (B) PIVOTALLY MOUNTING A RADIALLY DISPOSED BOOM FOR SWINGING ABOUT THE VERTICAL AXIS OF SAID POST, (C) DUMPING A SLAB SUPPORTING FILL ON THE GROUND SURFACE SURROUNDING SAID POST, (D) LEVELING SAID FILL TO DESIRED CONFIGURATION BY SWINGING SAID BOOM AROUND SAID POST, (E) POSITIONING AND SECURING A FORM RING ON THE GROUND SURFACE IN ACCURATE CONCENTRIC POSITION RELATIVE TO SAID POST, (F) POURING PREMIXED CONCRETE ON SAID FILL IN AN INCREASING SPIRAL MANNER STARTING AT THE CENTER ADJACENT SAID POST AND WORKING PROGRESSIVELY OUTWARDLY TO SAID FORM RING, (G) AND TAMPING AND TROWELING SAID POURED CONCRETE BY SWINGING SAID BOOM AROUND SAID POST THEREBY FORMING A FLOOR SLAB.
Claim 2
Independent Claim
132 words
THE METHOD OF CONSTRUCTING A CIRCULAR BUILDING COMPRISING THE STEPS OF: (A) SECURING A VERTICALLY DISPOSED CENTRAL LOCATED CONSTRUCTION POST IN THE GROUND, (B) PIVOTALLY MOUNTING A RADIALLY DISPOSED BOOM FOR SWINGING ABOUT THE VERTICAL AXIS OF SAID POST, (C) DUMPING A SLAB SUPPORTING FILL ON THE GROUND SURFACE SURROUNDING SAID POST, (D) LEVELING SAID FILL TO DESIRED CONFIGURATION BY SWINGING SAID BOOM AROUND SAID POST, (E) POSITIONING AND SECURING A FORM RING ON THE GROUND SURFACE IN ACCURATE CONCENTRIC POSITION RELATIVE TO SAID POST, (F) POURING PREMIXED CONCRETE ON SAID FILL IN AN INCREASING SPIRAL MANNER STARTING AT THE CENTER ADJACENT SAID POST AND WORKING PROGRESSIVELY OUTWARDLY TO SAID FORM RING, (G) AND TAMPING AND TROWELING SAID POURED CONCRETE BY SWINGING SAID BOOM AROUND SAID POST THEREBY FORMING A FLOOR SLAB.
References Cited (Backward Citations)
US1103863A
Cited
US2440920A
Cited
US2435052A
Cited
US2805631A
Cited
US2979798A
Cited
US3092216A
Cited
US3315343A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1971-02-05 | 1971-08-07 | 1972-02-06 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1975-02-05 | 1975-08-07 | 1976-02-06 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1979-02-05 | 1979-08-07 | 1980-02-06 | $7700.00 | Window Closed / Lapsed |