Patent US1407345A successfully refreshed from Google Patents.
Patent US3343825A successfully refreshed from Google Patents.
US3343825A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Pressure equalizer and discharger of a blast furnace
Assignee: IHI Corp
•
Filing: 1964-10-01
•
Granted: 1967-09-26
•
Expires: 1984-10-01
Abstract
No abstract record available.
Inventors
- 👤 Tsutsumi Teruo
- 👤 Kumagai Keiichi
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-03 18:45
CPC Classifications
C; C21; C21B; C21B7/00; C21B7/18; C21B7/007
Claims Analysis
Total Claims: 1
Claim 1
Independent Claim
182 words
IN A BLAST FURNACE SYSTEM COMPRISING: A BLAST FURNACE TO BE CHARGED WITH CHARGING MATERIAL; A BELL HOPPER CHARGING APPARATUS ATTACHED TO THE TOP OF SAID BLAST FURNACE AND HAVING DOWNWARDLY ARRANGED CONSECUTIVE FIRST AND SECOND HOPPERS EACH WITH AN INDEPENDENTLY CONTROLLED BELL WHEREBY SAID SECOND HOPPER IS CONNECTED VIA A DISCHARGE VALVE WITH THE OUTER ATMOSHPERE; A DRY DUST CATCHER THE INPUT OF WHICH IS CONNECTED TO SAID BLAST FURNACE; A PRIMARY DUST CATCHER THE INPUT OF WHICH IS CONNECTED TO THE OUTPUT OF SAID DRY DUST CATCHER AND THE OUTPUT OF WHICH IS CONNECTED VIA A PRIMARY EQUALIZER VALVE WITH SAID SECOND HOPPER; AND A PERSSURE EQUALIZER AND DISCHARGER COMPRISING A TURBO-BLOWER THE OUTPUT OF WHICH IS CONNECTED VIA A SECONDARY EQUALIZER VALVE WITH SAID SECOND HOPPER AND THE INPUT OF WHICH IS CONNECTED WITH THE OUTPUT OF SAID PRIMARY DUST CATCHER, PRESSURE CONTROL MEANS INSTALLED IN A BYPASS PIPE CONNECTING THE OUTLET OF THE TURBO-BLOWER WITH THE PRIMARY DUST CATCHER, CHARGING OPERATION CONTROL MEANS WHICH CONTROLS THE ENTIRE OPERATION SCHEDULE OF SAID PRIMARY EQUALIZER, DISCHARGE AND SECONDARY EQUALIZER VALVES.
References Cited (Backward Citations)
US2516190A
Cited
US2602027A
Cited
US2599334A
Cited
US2585800A
Cited
US2765935A
Cited
US2658636A
Cited
US2715575A
Cited
US3139472A
Cited
US3152703A
Cited
US3198623A
Cited
US3221906A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1970-09-25 | 1971-03-27 | 1971-09-26 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1974-09-25 | 1975-03-27 | 1975-09-26 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1978-09-25 | 1979-03-27 | 1979-09-26 | $7700.00 | Window Closed / Lapsed |