Patent US3318686A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3318686A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for transporting particulate material to a metallurgical furnace

Assignee: Beazer East Inc
•
Filing: 1963-07-02
•
Granted: 1967-05-09
•
Expires: 1983-07-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Elwood V Schulte

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 16:48
CPC Classifications
C; C21; C21B; C21B5/00; C21B5/001; C21B5/003

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 240 words
A METHOD OF INJECTING KPARTICULATE COAL PARTICLES INTO THE TUYERE ZONE OF A BLAST FURNACE WHICH COMPRISES (A) SUPPLYING PARTICULATE COAL TO A COLA FEEDER, (B) SUPPLYING A CONVEYING AIR STREAM AT SUPERATMOSPHERIC PRESSURE TO SAID COAL FEEDER, (C) ADMIXING SAID CONVEYING AIR STREAM AND SAID COAL PARTICLES IN SAID COAL FEEDER TO ENTRAIN COAL PATICLES IN SAID CONVEYING AIR STRTEAM AS A FLUIDIZED MASS OF SAID COLA PARTICLES SUSPENDED IN SAID CONVEYING AIR STREAM, (D) INTRODUCING SAID FLUIDIZED MASS INTO A PRIMARY CONDUIT AT A SUFFICIENT VELOCITY TO MAINTAIN SAID COAL PARTICLES SUSPENDED IN SAID CONVEYING AIR STREAM, (E) TRANSPORTING SAID FLUIDIZED MASS THROUGH SAID PRIMARY CONDUIT TO A FIRST SPLITER DEVICE, (F) MAINTAINING SAID JPARTICULATE COAL ENTRAINED IN SAID CONVEYING AIR STREAM AS A FLUIDIZED MASS IN SAID FIRST SPLITTER DEVICE, (G) DIVIDING SAID FLUIDIZED MASS IN SAID SPLITTER DEVICE INTO TWO SUBSTANTIALLY EQUAL AND SEPARAT STREAMS, (H) TRANSPORTING EACH OF SAID SEPARATE STREAMS AS A FLUIDIZED MASS THROUGH A SEPARATE SECONDARY CONDUIT TO A SECOND SPLITTER DEVICE. (I) MAINTAINING SAID PARTICULATE COAL ENTRAINED IN SAID CONVEYING AIR STREAM AS A FLUIDIZED MASS IN SAID SECOND SPLITTER DEVICE,, (J) DIVIDING EACH OF SAID STREAMS INTO TWO SEPARATE SMALLER SUBSTANTIALLY EQUAL SUBSTREAMS, (K) TRANSPORTING EAC OF SAID SUBSTREAMS THROUGH A TERTIARY CONDUIT TO THE TUYERE ZONE OF SAID BLAST FURNACE, AND (L) INTRODUCING SAID SEPARATE SUBSTREAMS FROM SAID TERTIARY CONDUITS INTO DIFFERENT QUADRANTS OF SAID BLAST FURNACE TUYERE ZONE.
Claim 2
Independent Claim 240 words
A METHOD OF INJECTING KPARTICULATE COAL PARTICLES INTO THE TUYERE ZONE OF A BLAST FURNACE WHICH COMPRISES (A) SUPPLYING PARTICULATE COAL TO A COLA FEEDER, (B) SUPPLYING A CONVEYING AIR STREAM AT SUPERATMOSPHERIC PRESSURE TO SAID COAL FEEDER, (C) ADMIXING SAID CONVEYING AIR STREAM AND SAID COAL PARTICLES IN SAID COAL FEEDER TO ENTRAIN COAL PATICLES IN SAID CONVEYING AIR STRTEAM AS A FLUIDIZED MASS OF SAID COLA PARTICLES SUSPENDED IN SAID CONVEYING AIR STREAM, (D) INTRODUCING SAID FLUIDIZED MASS INTO A PRIMARY CONDUIT AT A SUFFICIENT VELOCITY TO MAINTAIN SAID COAL PARTICLES SUSPENDED IN SAID CONVEYING AIR STREAM, (E) TRANSPORTING SAID FLUIDIZED MASS THROUGH SAID PRIMARY CONDUIT TO A FIRST SPLITER DEVICE, (F) MAINTAINING SAID JPARTICULATE COAL ENTRAINED IN SAID CONVEYING AIR STREAM AS A FLUIDIZED MASS IN SAID FIRST SPLITTER DEVICE, (G) DIVIDING SAID FLUIDIZED MASS IN SAID SPLITTER DEVICE INTO TWO SUBSTANTIALLY EQUAL AND SEPARAT STREAMS, (H) TRANSPORTING EACH OF SAID SEPARATE STREAMS AS A FLUIDIZED MASS THROUGH A SEPARATE SECONDARY CONDUIT TO A SECOND SPLITTER DEVICE. (I) MAINTAINING SAID PARTICULATE COAL ENTRAINED IN SAID CONVEYING AIR STREAM AS A FLUIDIZED MASS IN SAID SECOND SPLITTER DEVICE,, (J) DIVIDING EACH OF SAID STREAMS INTO TWO SEPARATE SMALLER SUBSTANTIALLY EQUAL SUBSTREAMS, (K) TRANSPORTING EAC OF SAID SUBSTREAMS THROUGH A TERTIARY CONDUIT TO THE TUYERE ZONE OF SAID BLAST FURNACE, AND (L) INTRODUCING SAID SEPARATE SUBSTREAMS FROM SAID TERTIARY CONDUITS INTO DIFFERENT QUADRANTS OF SAID BLAST FURNACE TUYERE ZONE.
Claim 3
Dependent Claim 216 words
APPARATUS FOR SELECTIVELY INJECTING PARTICULATE MATERIAL INTO PRESELECTED PORTIONS OF A METALLURGICAL FURNACE COMPRISING (A) A FEEDER DEVICE. (B) MEANS TO SUPPLY A CONVEYING AIR STREAM AT SUPERATOMOSPHERIC PRESSURE TO SAID FEEDER DEVICE, (C) SAID FEEDER DEVICE OPERABLE TO ADMIX PRESELECTED QUANTITIES OF PARTICULATE MATERIAL WITH CONVEYING AIR SUPPLIED THERETO TO ENTRAIN SAID COAL PARTICLES IN SAID CONVEYING AIR STREAM AS A FLUIDIZED MASS OF SAID PARTICULATE MATERIAL SUSPENDED IN SAID CONVEYING AIR, (D) CONDUIT MEANS TO CONVEY SAID FLUIDIZED MASS TO SAID METALLURGICAL FURNACE. (E) SAID CONDUIT MEANS INCLUDING A FIRST SPLITTER MEANS TO DIVIDE SAID FLUIDIZED MASS INTO MORE THAN TWO SUBSTANTIALLY EQUAL STREAMS, SECOND SPLITTER MEANS TO DIVIDE SAID STEAMS INTO SUBSTANTIALY EQUAL SUBSTREAMS WHILE SAID PARTICULATE MATERIAL REMAINS SUSPENDED IN SAID CONVEYING AIR STREAMS, AND THIRD SPLITTER MEANS TO FURTHER DIVIDE SAID SUBSTREAMS INTO SMALL ER SUBSTREAMS WHILE SAID JPARTICULATE MATERIAL REMAINS SUSPENDED IN SAID CONVEYING AIR STREAM, (F) SAID CONDUIT MEANS HAVING A PLURALITY OF SEPARATE OUTLETS ARRANGED AROUND THE PERIPHERY OF SAID METALLURGICAL FURNACE FOR INJECTING SEPARATE STREAMS OF SAID FLUIDIZED MASS INTO DIFFERENT PORTIONS OF SAID METALLURGICAL FURNACE, AND (G) VALVE MEANS IN SAID JCONDUIT MEANS TO CLOSE PRESELECTED PORTIONS OF SAID CONDUIT MEANS TO THEREBY INJECT STREAMS OF SAID FLUIDIZED MASS INTO PRESELECTED PORTIONS OF SAID METALLURGICAL FURNACE.
Claim 4
Dependent Claim 216 words
APPARATUS FOR SELECTIVELY INJECTING PARTICULATE MATERIAL INTO PRESELECTED PORTIONS OF A METALLURGICAL FURNACE COMPRISING (A) A FEEDER DEVICE. (B) MEANS TO SUPPLY A CONVEYING AIR STREAM AT SUPERATOMOSPHERIC PRESSURE TO SAID FEEDER DEVICE, (C) SAID FEEDER DEVICE OPERABLE TO ADMIX PRESELECTED QUANTITIES OF PARTICULATE MATERIAL WITH CONVEYING AIR SUPPLIED THERETO TO ENTRAIN SAID COAL PARTICLES IN SAID CONVEYING AIR STREAM AS A FLUIDIZED MASS OF SAID PARTICULATE MATERIAL SUSPENDED IN SAID CONVEYING AIR, (D) CONDUIT MEANS TO CONVEY SAID FLUIDIZED MASS TO SAID METALLURGICAL FURNACE. (E) SAID CONDUIT MEANS INCLUDING A FIRST SPLITTER MEANS TO DIVIDE SAID FLUIDIZED MASS INTO MORE THAN TWO SUBSTANTIALLY EQUAL STREAMS, SECOND SPLITTER MEANS TO DIVIDE SAID STEAMS INTO SUBSTANTIALY EQUAL SUBSTREAMS WHILE SAID PARTICULATE MATERIAL REMAINS SUSPENDED IN SAID CONVEYING AIR STREAMS, AND THIRD SPLITTER MEANS TO FURTHER DIVIDE SAID SUBSTREAMS INTO SMALL ER SUBSTREAMS WHILE SAID JPARTICULATE MATERIAL REMAINS SUSPENDED IN SAID CONVEYING AIR STREAM, (F) SAID CONDUIT MEANS HAVING A PLURALITY OF SEPARATE OUTLETS ARRANGED AROUND THE PERIPHERY OF SAID METALLURGICAL FURNACE FOR INJECTING SEPARATE STREAMS OF SAID FLUIDIZED MASS INTO DIFFERENT PORTIONS OF SAID METALLURGICAL FURNACE, AND (G) VALVE MEANS IN SAID JCONDUIT MEANS TO CLOSE PRESELECTED PORTIONS OF SAID CONDUIT MEANS TO THEREBY INJECT STREAMS OF SAID FLUIDIZED MASS INTO PRESELECTED PORTIONS OF SAID METALLURGICAL FURNACE.

References Cited (Backward Citations)

US432280A Cited
US2279399A Cited
US3116143A Cited
US3150962A Cited
US3178165A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-05-08 1970-11-07 1971-05-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-05-08 1974-11-07 1975-05-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-05-08 1978-11-07 1979-05-09 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag