Patent US3309277A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3309277A Expired / Lapsed US ⏱️ 0.0 years remaining

Nuclear reactor and method of fuel management therefor

Assignee: Individual
•
Filing: 1965-05-17
•
Granted: 1967-03-14
•
Expires: 1985-05-17
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Jaye Seymour
  • 👤 Jr Dana H Lee
  • 👤 John R Triplett

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 09:42
CPC Classifications
G; G21; G21C; G21C1/00; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 93 words
A METHOD OF FUEL MANAGEMENT FOR A NUCLEAR REACTOR UTILIZING A THORIUM-URANIUM233 BREEDING CYCLE FOR A PLURALITY OF FUEL RECYCLES, WHICH METHOD COMPRISES CHARGING THE REACTOR WITH FUEL UNITS CONTAINING URANIUM AND THORIUM, OPERATING THE REACTOR FOR THE DESIRED REACTIVITY LIFE OF AT LEAST A SELECTED PORTION OF SAID FUEL UNITS, REMOVING SAID SELECTED PORTION OF FUEL UNITS FROM THE NUCLEAR REACTOR, REPROCESSING SAID SELECTED FUEL UNITS TO ELIMINATE FISSION PRODUCTS AND TO RECOVER BRED URANIUM, AND REFUELING THE NUCLEAR REACTOR WITH BRED URANIUM, THORIUM AND MAKE-UP PLUTONIUM FOR A SUBSEQUENT REACTOR CYCLE.
Claim 2
Independent Claim 93 words
A METHOD OF FUEL MANAGEMENT FOR A NUCLEAR REACTOR UTILIZING A THORIUM-URANIUM233 BREEDING CYCLE FOR A PLURALITY OF FUEL RECYCLES, WHICH METHOD COMPRISES CHARGING THE REACTOR WITH FUEL UNITS CONTAINING URANIUM AND THORIUM, OPERATING THE REACTOR FOR THE DESIRED REACTIVITY LIFE OF AT LEAST A SELECTED PORTION OF SAID FUEL UNITS, REMOVING SAID SELECTED PORTION OF FUEL UNITS FROM THE NUCLEAR REACTOR, REPROCESSING SAID SELECTED FUEL UNITS TO ELIMINATE FISSION PRODUCTS AND TO RECOVER BRED URANIUM, AND REFUELING THE NUCLEAR REACTOR WITH BRED URANIUM, THORIUM AND MAKE-UP PLUTONIUM FOR A SUBSEQUENT REACTOR CYCLE.

References Cited (Backward Citations)

US3230151A Cited
US3208912A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-03-13 1970-09-12 1971-03-14 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-03-13 1974-09-12 1975-03-14 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-03-13 1978-09-12 1979-03-14 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag