Patent US2414854A successfully refreshed from Google Patents.
Patent US3288212A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3288212A Expired / Lapsed US ⏱️ 0.0 years remaining

Secondary oil recovery method

Assignee: Union Oil Company of California
•
Filing: 1964-05-21
•
Granted: 1966-11-29
•
Expires: 1984-05-21
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Leo J O'brien
  • 👤 Le Roy W Holm
  • 👤 Walter Frank

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 02:09
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/20

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 138 words
IN THE METHOD OF PRODUCING PETROLEUM FROM A FLUIDFLOODED SUBTERRANEAN OIL-BEARING FORMATION TRAVERSED BY A PLURALITY OF WELLS WHEREIN A FIRST AQUEOUS FLUID IS INJECTED INTO THE FORMATION BY MEANS OF A FIRST INJECTION WELL AND SAID FIRST FLUID IS DRIVEN THROUGH SAID FORMATION TOWARD A PRODUCING WELL, THE IMPROVEMENT COMPRISING INJECTING A SECOND FLUID INTO SAID FORMATION THROUGH A SECOND INJECTION WELL INTERMEDIATE SAID FIRST INJECTING WELL AND SAID PRODUCING WELL, AND SIMULTANEOUSLY WITHDRAWING A PORTION OF SAID FIRST INJECTED FLUID FROM AN AREA ADJACENT TO AND UPSTREAM FROM SAID SECOND INJECTION WELL, THE WITHDRAWAL OF SAID PORTION OF FIRST INJECTED FLUID CREATING A PRESSURE GRADIENT RELATIVE TO THE REMAINDER OF SAID FORMATION AND THEREBY INCREASING THE SWEEP EFFICIENCY OF SAID SECOND INJECTED FLUID, AND DRIVING SAID SECOND INJECTED FLUID THROUGH SAID FORMATION TOWARD SAID PRODUCING WELL.
Claim 2
Dependent Claim 138 words
IN THE METHOD OF PRODUCING PETROLEUM FROM A FLUIDFLOODED SUBTERRANEAN OIL-BEARING FORMATION TRAVERSED BY A PLURALITY OF WELLS WHEREIN A FIRST AQUEOUS FLUID IS INJECTED INTO THE FORMATION BY MEANS OF A FIRST INJECTION WELL AND SAID FIRST FLUID IS DRIVEN THROUGH SAID FORMATION TOWARD A PRODUCING WELL, THE IMPROVEMENT COMPRISING INJECTING A SECOND FLUID INTO SAID FORMATION THROUGH A SECOND INJECTION WELL INTERMEDIATE SAID FIRST INJECTING WELL AND SAID PRODUCING WELL, AND SIMULTANEOUSLY WITHDRAWING A PORTION OF SAID FIRST INJECTED FLUID FROM AN AREA ADJACENT TO AND UPSTREAM FROM SAID SECOND INJECTION WELL, THE WITHDRAWAL OF SAID PORTION OF FIRST INJECTED FLUID CREATING A PRESSURE GRADIENT RELATIVE TO THE REMAINDER OF SAID FORMATION AND THEREBY INCREASING THE SWEEP EFFICIENCY OF SAID SECOND INJECTED FLUID, AND DRIVING SAID SECOND INJECTED FLUID THROUGH SAID FORMATION TOWARD SAID PRODUCING WELL.

References Cited (Backward Citations)

GB726712A Cited
US2924276A Cited
US3113616A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-11-28 1970-05-30 1970-11-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-11-28 1974-05-30 1974-11-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-11-28 1978-05-30 1978-11-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag