Patent US5293484A successfully refreshed from Google Patents.
Patent US3285338A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3285338A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for oil recovery

Assignee: Mobil Oil AS
•
Filing: 1963-08-23
•
Granted: 1966-11-15
•
Expires: 1983-08-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 William G Boston

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 21:00
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/20

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 155 words
IN THE RECOVERY OF OIL FROM A RESERVOIR HAVING A HIGH PERMEABILITY ZONE BY INJECTING A DRIVING FLUID CONTAINING A MATERIAL INTO A FIRST WELL TO DISPLACE OIL TOWARD A SECOND WELL, SAID MATERIAL CAPABLE OF CONVERTING A SOLUTION OF A SUBSTANCE TO A PLUGGING MATERIAL BY THEIR REACTION WITHIN THE RESERVOIR, AND THE METHOD COMPRISING THE STEPS OF: (A) PRODUCING OIL FROM THE SECOND WELL UNTIL THE DRIVING FLUID CONTAINING THE DESCRIBED MATERIAL BREAKS THROUGH INTO THE SECOND WELL AT THE HEIGH PERMEABILITY ZONE IN THE RESERVOIR, (B) TERMINATING THE INJECTION OF FLUIDS INTO THE FIRST WELL, (C) INTRODUCING INTO THE RESERVOIR FROM THE SECOND WELL A SOLUTION OF A SUBSTANCE CONVERTIBLE TO A PLUGGING MATERIAL UPON REACTION WITH THE DESCRIBED MATERIAL IN THE DRIVING FLUID IN THE RESERVOIR, AND (D) RESULTING THE STEPS OF INTRODUCINT THE DRIVING FLUID CONTAINING THE DESCRIBED MATERIAL INTO THE FIRST WELL AND PRODUCING OIL FROM THE SECOND WELL.
Claim 2
Dependent Claim 155 words
IN THE RECOVERY OF OIL FROM A RESERVOIR HAVING A HIGH PERMEABILITY ZONE BY INJECTING A DRIVING FLUID CONTAINING A MATERIAL INTO A FIRST WELL TO DISPLACE OIL TOWARD A SECOND WELL, SAID MATERIAL CAPABLE OF CONVERTING A SOLUTION OF A SUBSTANCE TO A PLUGGING MATERIAL BY THEIR REACTION WITHIN THE RESERVOIR, AND THE METHOD COMPRISING THE STEPS OF: (A) PRODUCING OIL FROM THE SECOND WELL UNTIL THE DRIVING FLUID CONTAINING THE DESCRIBED MATERIAL BREAKS THROUGH INTO THE SECOND WELL AT THE HEIGH PERMEABILITY ZONE IN THE RESERVOIR, (B) TERMINATING THE INJECTION OF FLUIDS INTO THE FIRST WELL, (C) INTRODUCING INTO THE RESERVOIR FROM THE SECOND WELL A SOLUTION OF A SUBSTANCE CONVERTIBLE TO A PLUGGING MATERIAL UPON REACTION WITH THE DESCRIBED MATERIAL IN THE DRIVING FLUID IN THE RESERVOIR, AND (D) RESULTING THE STEPS OF INTRODUCINT THE DRIVING FLUID CONTAINING THE DESCRIBED MATERIAL INTO THE FIRST WELL AND PRODUCING OIL FROM THE SECOND WELL.

References Cited (Backward Citations)

US2786530A Cited
US3127934A Cited
US3199588A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-11-14 1970-05-16 1970-11-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-11-14 1974-05-16 1974-11-15 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-11-14 1978-05-16 1978-11-15 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag