← Back to Patent Explorer
US3280912A Expired / Lapsed US ⏱️ 0.0 years remaining

Restoring lost circulation in wells

Assignee: ExxonMobil Upstream Research Co
•
Filing: 1963-12-09
•
Granted: 1966-10-25
•
Expires: 1983-12-09
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Jr James R Sheffield

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 06:29
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/50; C09K8/504; C09K8/5045

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 120 words
THE METHOD OF PREVENTING LOSS OF DRILLING FLUID IN A WELL PENETRATING AN EARTH FORMATION THAT HAS BEEN ACCIDENTALLY FRACTURED DURING DRILLING OPERATIONS, COMPRISING: FORMING A SALINE SLURRY COMPRISING A LIQUID VEHICLE, BETWEEN 80 AND 150 POUNDS OF AN ANGULAR, GRADED PARTICULATE MATERIAL SELECTED FROM THE GROUP CONSISTING OF LIMESTONE, MARBLE, SAND, AND GILSONITE PER 42 GALLONS OF LIQUID VEHICLE, SAID PARTICULATE MATERIA; HAVING PARTICLE SIZES IN THE COMPLETE RANGE OF 4 TO 200 MESH; OPENING THE FRACTURE IN THE FRACTURED ZONE AND FORCING THE SLURRY THEREINTO; ACTERISTICS; AND CONTINUING INJECTION OF THE SLURRY UNTIL THE HYDROSTATIC PRESSURE REACHES A VALUE DETERMINED BY THE WELL CHARCIRCULATNG DRILLING FLUID TO BUILD UP A FILTER CAKE ACROSS THE SOLIDS BRIDGING THE FRACTURE.
Claim 2
Independent Claim 120 words
THE METHOD OF PREVENTING LOSS OF DRILLING FLUID IN A WELL PENETRATING AN EARTH FORMATION THAT HAS BEEN ACCIDENTALLY FRACTURED DURING DRILLING OPERATIONS, COMPRISING: FORMING A SALINE SLURRY COMPRISING A LIQUID VEHICLE, BETWEEN 80 AND 150 POUNDS OF AN ANGULAR, GRADED PARTICULATE MATERIAL SELECTED FROM THE GROUP CONSISTING OF LIMESTONE, MARBLE, SAND, AND GILSONITE PER 42 GALLONS OF LIQUID VEHICLE, SAID PARTICULATE MATERIA; HAVING PARTICLE SIZES IN THE COMPLETE RANGE OF 4 TO 200 MESH; OPENING THE FRACTURE IN THE FRACTURED ZONE AND FORCING THE SLURRY THEREINTO; ACTERISTICS; AND CONTINUING INJECTION OF THE SLURRY UNTIL THE HYDROSTATIC PRESSURE REACHES A VALUE DETERMINED BY THE WELL CHARCIRCULATNG DRILLING FLUID TO BUILD UP A FILTER CAKE ACROSS THE SOLIDS BRIDGING THE FRACTURE.

References Cited (Backward Citations)

US2812162A Cited
US3208523A Cited
US3158210A Cited
US3228469A Cited
US3233673A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-10-24 1970-04-25 1970-10-25 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-10-24 1974-04-25 1974-10-25 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-10-24 1978-04-25 1978-10-25 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag