Patent US4876160A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3273640A Expired / Lapsed US ⏱️ 0.0 years remaining

Pressure pulsing perpendicular permeability process for winning stabilized primary volatiles from oil shale in situ

Assignee: Pyrochem Corp
•
Filing: 1963-12-13
•
Granted: 1966-09-20
•
Expires: 1983-12-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Morgan G Huntington

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 20:33
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 160 words
AN IN SITU PROCESS FOR WINNING OIL SHALE FROM AN OIL SHALE FORMATION, THE FORMATION INCLUDING A PRODUCTION BORE HOLE AND AN INJECTION BORE HOLE DRILLED THEREIN, AS WELL AS A PATH OF LATERAL FLUID COMMUNICATION THROUGH THE OTHERWISE IMPERVIOUS OIL SHALE BETWEEN THE PRODUCTION AND INJECTION BORE HOLES, THE PROCESS COMPRISING; (A) PREHEATING THE OIL SHALE ADJACENT THE PATH OF LATERAL FLUID COMMUNICATION WITH HOT WATER TO A TEMPERATURE JUST BELOW THAT AT WHICH PYROLYSIS OF THE OIL SHALE BEGINS, (B) INTRODUCING SUPERHEATED STEAM UNDER PRESSURE INTO THE PATH OF LATERAL FLUID COMMUNICATION THROUGH THE INJECTION BORE HOLE, (C) CYLICALLY VARYING THE SUPERHEATED STEAM PRESSURE BETWEEN THE LIMITS OF ROCK PRESSURE AND A LOWER PRESSURE SUFFICIENT TO PREVENT UNDUE STEAM CONDENSTATION, (D) REMOVING STEAM AND OIL SHALE ENTRAINED VAPOR FROM THE PRODUCTION WELL, AND (E) TREATING THE REMOVED STEAM AND OIL ENTRAINED VAPOR AFTER FIRST REDUCING THE PATIAL PRESSURE OF STEAM BY CONTACT CATALYSIS IN THE PRESENCE OF HYDROGEN.
Claim 2
Dependent Claim 160 words
AN IN SITU PROCESS FOR WINNING OIL SHALE FROM AN OIL SHALE FORMATION, THE FORMATION INCLUDING A PRODUCTION BORE HOLE AND AN INJECTION BORE HOLE DRILLED THEREIN, AS WELL AS A PATH OF LATERAL FLUID COMMUNICATION THROUGH THE OTHERWISE IMPERVIOUS OIL SHALE BETWEEN THE PRODUCTION AND INJECTION BORE HOLES, THE PROCESS COMPRISING; (A) PREHEATING THE OIL SHALE ADJACENT THE PATH OF LATERAL FLUID COMMUNICATION WITH HOT WATER TO A TEMPERATURE JUST BELOW THAT AT WHICH PYROLYSIS OF THE OIL SHALE BEGINS, (B) INTRODUCING SUPERHEATED STEAM UNDER PRESSURE INTO THE PATH OF LATERAL FLUID COMMUNICATION THROUGH THE INJECTION BORE HOLE, (C) CYLICALLY VARYING THE SUPERHEATED STEAM PRESSURE BETWEEN THE LIMITS OF ROCK PRESSURE AND A LOWER PRESSURE SUFFICIENT TO PREVENT UNDUE STEAM CONDENSTATION, (D) REMOVING STEAM AND OIL SHALE ENTRAINED VAPOR FROM THE PRODUCTION WELL, AND (E) TREATING THE REMOVED STEAM AND OIL ENTRAINED VAPOR AFTER FIRST REDUCING THE PATIAL PRESSURE OF STEAM BY CONTACT CATALYSIS IN THE PRESENCE OF HYDROGEN.

References Cited (Backward Citations)

US1422204A Cited
US2421528A Cited
US2692226A Cited
US2813583A Cited
US3117072A Cited
US3042114A Cited
US2969226A Cited
US3155160A Cited
US3106521A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-09-19 1970-03-21 1970-09-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-09-19 1974-03-21 1974-09-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-09-19 1978-03-21 1978-09-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag