Patent US3269830A successfully refreshed from Google Patents.
US3269830A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Production of niobium from niobium pentachloride
Assignee: Teck Metals Ltd
•
Filing: 1962-04-06
•
Granted: 1966-08-30
•
Expires: 1982-04-06
Abstract
No abstract record available.
Inventors
- 👤 Charles A Sutherland
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 22:04
CPC Classifications
C; C22; C22B; C22B34/00; C22B34/20; C22B34/24
Claims Analysis
Total Claims: 1
Claim 1
Independent Claim
220 words
IN A METHOD FOR THE PRODUCTION OF NIOBIUM WHICH COMPRISES THE STEPS OF: FEEDING NIOBIUM PENTACHLORIDE INTO A FUSED SODIUM CHLORIDE-POTASSIUM CHLORIDE SALT MIXTURE CONTAINED IN A REACTION ZONE WHICH CONTAINS AN ALKALI METAL FLUORIDE IN AMOUNT SUFFICIENT TO COMBINE WITH THE NIOBIUM CONTENT OF THE NOIBIUM PENTACHLORIDE AS POTASSIUM NOIBIUM FLUORIDE DOUBLE SALT; MAINTAINING A NONOXIDIZING ATMOSPHERE IN THE REACTION ZONE; PROVIDING A BATH OF MOLTEN ZINC BELOW SAID FUSED SALT MIXTURE, SAID BATH CONTAINING ZINC IN EXCESS OF THE AMOUNT REQUIRED FOR FORMATION OF NBZN3, AND COLLECTING NBZN3, IN SOLID FORM ON THE WALL OF THE REACTION ZONE; THE IMPROVEMENT WHICH COMPRISES SCRAPING NBZN3 FROM THE WALL OF THE REACTION ZONE TO SETTLE IN THE BATH OF MOLTEN ZINC; INTERMITTENTLY PASSING MOLTEN ZINC AND COLLECTED NBZN3 TO A SETTLING ZONE, SAID SETTLING ZONE COMMUNICATING INTERMITTENTLY WITH SAID REACTION ZONE BY MEANS OF A PASSAGEWAY EXTENDING THEREBETWEEN, THE INTERMITTENT COMMUNICATION BEING PROVIDED BY ALTERNATELY MELTING AND FREEZING ZINC IN THE PASSAGEWAY BETWEEN SAID REACTION ZONE AND SAID SETTLING ZONE; COLLECTING NBZN3 IN THE LOWER PART OF SAID SETTLING ZONE; RECYCLING ZINC FROM THE UPPER PART OF SAID SETTLING ZONE TO SAID REACTION ZONE; COOLING NBZN3 AND MOLTEN ZINC IN THE LOWER PART OF SAID SETTLING ZONE TO FORM AN INGOT; AND RECOVERING NIOBIUM IN ELEMENTAL FORM FROM SAID INGOT.
References Cited (Backward Citations)
US1281443A
Cited
US1943330A
Cited
GB671054A
Cited
GB763731A
Cited
US2880987A
Cited
GB876802A
Cited
US2941867A
Cited
US3102807A
Cited
US3068066A
Cited
US3071459A
Cited
US3157493A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1969-08-29 | 1970-02-28 | 1970-08-30 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1973-08-29 | 1974-02-28 | 1974-08-30 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1977-08-29 | 1978-02-28 | 1978-08-30 | $7700.00 | Window Closed / Lapsed |