Patent US3263751A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3263751A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for increasing oil recovery by miscible displacement

Assignee: ExxonMobil Upstream Research Co
•
Filing: 1964-02-17
•
Granted: 1966-08-02
•
Expires: 1984-02-17
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Othar M Kiel
  • 👤 Carroll F Malinowsky

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 23:04
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/166; E21B43/168

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 159 words
A PROCESS FOR THE RECOVERY OF PETROLEUM FROM A SUBSURFACE RESERVOIR WHICH COMPRISES DRILLING A WELLBORE THROUGH SUBSTANTIALLY THE ENTIRE OIL-BEARING ZONE, LIMITING COMMUNICATION BETWEEN SAID ZONE AND SAID WELLBORE TO SUBSTANTIALLY THE LOWER BOUNDARY LEVEL THEREOF, FORMING A HIGHLY CONDUCTIVE, HORIZONTALLY ORIENTED FRACTURE AT SAID LEVEL OF COMMUNICATION, INJECTING THROUGH SAID FRACTURE AND INTO THE RESERVOIR A CONDENSIBLE GAS, THE LIQUID PHASE OF WHICH EXHIBITS A SUBSTANTIAL DEGREE OF MISCIBILITY WITH THE RESERVOIR OIL, THEREAFTER INJECTING A RELATIVELY NONCONDENSIBLE GAS THROUGH SAID FRACTURE AND INTO THE RESERVIOR, THE VOLUME OF SAID NON-CONDENSIBLE GAS BEING SUFFICIENT TO RAISE THE RESERVOIR PRESSURE AT LEAST 50 P.S.I. ABOVE THE VAPOR PRESSURE OF THE CONDENSIBLE GAS, DISCONTINUING INJECTION OF SAID NON-CONDENSIBLE GAS AND THEREAFTER PRODUCING OIL FROM SAID RESERVOIR THROUGH SAID FRACTURE, WITH A CONTROLLED BACK PRESSURE SUFFICIENT TO PERMIT THE EFFECTS OF GRAVITY SEGREGATION TO BALANCE THE TENDENCY FOR THE CONDENSED LAYER OF MISCIBLE LIQUID TO FINGER THROUGH THE RESERVOIR OIL.
Claim 2
Dependent Claim 159 words
A PROCESS FOR THE RECOVERY OF PETROLEUM FROM A SUBSURFACE RESERVOIR WHICH COMPRISES DRILLING A WELLBORE THROUGH SUBSTANTIALLY THE ENTIRE OIL-BEARING ZONE, LIMITING COMMUNICATION BETWEEN SAID ZONE AND SAID WELLBORE TO SUBSTANTIALLY THE LOWER BOUNDARY LEVEL THEREOF, FORMING A HIGHLY CONDUCTIVE, HORIZONTALLY ORIENTED FRACTURE AT SAID LEVEL OF COMMUNICATION, INJECTING THROUGH SAID FRACTURE AND INTO THE RESERVOIR A CONDENSIBLE GAS, THE LIQUID PHASE OF WHICH EXHIBITS A SUBSTANTIAL DEGREE OF MISCIBILITY WITH THE RESERVOIR OIL, THEREAFTER INJECTING A RELATIVELY NONCONDENSIBLE GAS THROUGH SAID FRACTURE AND INTO THE RESERVIOR, THE VOLUME OF SAID NON-CONDENSIBLE GAS BEING SUFFICIENT TO RAISE THE RESERVOIR PRESSURE AT LEAST 50 P.S.I. ABOVE THE VAPOR PRESSURE OF THE CONDENSIBLE GAS, DISCONTINUING INJECTION OF SAID NON-CONDENSIBLE GAS AND THEREAFTER PRODUCING OIL FROM SAID RESERVOIR THROUGH SAID FRACTURE, WITH A CONTROLLED BACK PRESSURE SUFFICIENT TO PERMIT THE EFFECTS OF GRAVITY SEGREGATION TO BALANCE THE TENDENCY FOR THE CONDENSED LAYER OF MISCIBLE LIQUID TO FINGER THROUGH THE RESERVOIR OIL.

References Cited (Backward Citations)

CA664186A Cited
GB696524A Cited
US2821255A Cited
US3073386A Cited
US2885003A Cited
US3172470A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-08-01 1970-01-31 1970-08-02 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-08-01 1974-01-31 1974-08-02 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-08-01 1978-01-31 1978-08-02 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag