Patent US3196189A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3196189A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of controlling a dehydrogenation process

Assignee: Phillips Petroleum Co
•
Filing: 1962-04-02
•
Granted: 1965-07-20
•
Expires: 1982-04-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Frank T Ogle
  • 👤 Ernest D Tolin
  • 👤 Edwin K Clardy

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 19:46
CPC Classifications
C; C07; C07C; C07C5/00; C07C5/32; C07C5/321; B; B01; B01D; B01D3/00; B01D3/42; B01D3/4211; B01D3/4227; B01J; B01J8/00; B01J8/001; C07C5/327; C07C5/333; C07C5/3332; Y; Y10; Y10S; Y10S208/00; Y10S208/01

Claims Analysis

Total Claims: 1
Claim 1
Independent Claim 289 words
IN A DEHYDROGENATION PROCESS WHICH COMPRISES PASSING A LIGHT HYDROCARBON FEED STREAM TO A DEHYDROGENATION REACTION ZONE CONTAINING A DEHYDROGENATION CATALYST, SAID LIGHT HYDROCARBON FEED SELECTED FROM THE GROUP COMPRISING NORMAL BUTANE, BUTYLENES AND AMYLENES AND WITHDRAWING FROM SAID DEHYDROGENATION REACTION ZONE AN EFFLUENT HYDROCARBON STREAM; A METHOD OF CONTROL WHICH COMPRISES MEASURING A PROPERTY OF SAID LIGHT HYDROCARBON FEED STREAM WHICH IS REPRESENTATIVE OF THE COMPOSITION THEREOF, PASSING A FIRST SIGNAL REPRESENTATIVE OF SAID MEASUREMENT TO A COMPUTING ZONE, MEASURING A PROPERTY OF SAID EFFLUENT STREAM WHICH IS REPRESENTATIVE OF THE COMPOSITION THEREOF, PASSING A SECOND SIGNAL REPRESENTATIVE OF SAID EFFLUENT STREAM MEASUREMENT TO SAID COMPUTING ZONE, PASSING A THIRD SIGNAL REPRESENTATIVE OF THE EFFECTIVENESS OF SAID DEHYDROGENATION REACTION FROM SAID COMPUTING ZONE TO A FIRST CONTROL ZONE RESPONSIVE TO SAID FIRST AND SECOND SIGNALS, PASSING A FOURTH ERROR SIGNAL RESPONSIVE TO SAID THIRD SIGNAL FROM SAID FIRST CONTROL ZONE TO A SECOND CONTROL ZONE, PASSING A FIFTH SIGNAL REPRESENTATIVE OF A REQUIRED DEHYDROGENATION REACTION ZONE TEMPERATURE FROM SAID FIRST CONTROL ZONE TO A THIRD CONTROL ZONE RESPONSIVE TO SAID THIRD SIGNAL, PASSING A SIXTH SIGNAL REPRESENTATIVE OF A MAXIMUM ALLOWABLE OPERATING TEMPERATURE IN SAID DEHYDROGENATION REACTION ZONE TO SAID SECOND AND SAID THIRD CONTROL ZONES, SAID THIRD CONTROL ZONE CAPABLE OF TRANSMITTING A SEVENTH SIGNAL REPRESENTATIVE OF THE MINIMUM OF SAID FIFTH AND SIXTH SIGNALS RECEIVED BY SAID THIRD CONTROL ZONE, PASSING SAID SEVENTH SIGNAL FROM SAID THIRD CONTROL ZONE TO A MEANS FOR MANIPULATING A TEMPERATURE OF SAID DEHYDROGENATION REACTION ZONE, THEREBY MANIPULATING SAID TEMPERATURE RESPONSIVE TO SAID SEVENTH SIGNAL, PASSING AN EIGHTH SIGNAL REPRESENTATIVE OF A MEASURED TEMPERATURE OF SAID DEHYDROGENATION REACTION ZONE TO SAID SECOND CONTROL ZONE, SAID SECOND CONTROL ZONE SOLVING THE EQUATION

References Cited (Backward Citations)

US2908734A Cited
US3050469A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-07-19 1969-01-18 1969-07-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-07-19 1973-01-18 1973-07-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-07-19 1977-01-18 1977-07-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag